News List

The two sides agreed that the current cement industry is accelerating its transformation to green, resource-based and digital-intelligent. In the future, they will continue to strengthen normal exchanges, learn from each other's advanced management and technological experience, rely on their respective resource advantages, and explore cooperation space in circular economy projects, industry resource docking and technological innovation landing.

2026-06-09

On June 7, the results of the photovoltaic sand control project in Ordos City in 2026 were officially announced. The Ordos Photovoltaic Sand Control Project has a total index of 6 million kilowatts.

2026-06-09

On June 5, Xinjiang Qiemo 250 MW/1000 MWh grid-type independent new energy storage project EPC general contracting public tender announcement was issued, and the project tenderer was Qiemo Rongyu Energy Storage Co., Ltd. The maximum bidding price is 728 million yuan, equivalent to a unit price of 0.728 yuan/Wh.

2026-06-09

On June 3, the Ningxia Lingwu Examination and Approval Service Administration issued a public announcement on the acceptance of the environmental impact report form for the 500000 kilowatt photovoltaic composite project in Lingwu City, Central.

2026-06-09

The Development and Reform Bureau of Pulandian District solemnly declares that it has never designated a photovoltaic cooperation unit and will not charge any filing fee; the so-called "filing fee for cancellation of cooperation" is a fraud, and the public should not transfer money.

2026-06-09

On June 5, Inner Mongolia Zhungeer Banner Guangzhiyuan 600 MW Photovoltaic Project Photovoltaic Module Equipment Procurement Project Tender Announcement was issued, and the tenderer was Inner Mongolia Zhungeer Banner Guangzhiyuan New Energy Co., Ltd.

2026-06-09

On June 8, the tender announcement for 1258.5456 MWp photovoltaic modules and accessories in the East District of the 2 million kilowatt photovoltaic project in Huanghuatan, Gansu, was issued.

2026-06-09

On June 8, the tender announcement for 584.64 MWp photovoltaic modules and accessories of Section I of Hongshagang 1.2 million kilowatt photovoltaic project in Minqin County, Wuwei City, Gansu Tengger Desert Hexi New Energy Base was issued.

2026-06-09

On June 3, the online approval and supervision platform for investment projects in Anhui Province showed that the research and development project of Kangye Solar Crystalline Silicon-Perovskite Tandem Battery was put on record. The project code is 2606-340111-04-02-499297, and the approval department is the Management Committee of Baohe Economic Development Zone, Hefei, Anhui Province.

2026-06-09

After the implementation of this Notice, the format of the pollutant discharge permit (duplicate) in Annex 3 of the Notice on Issuing the Sample of the Commitment Letter for Pollutant Discharge Permits, the Application Form for Pollutant Discharge Permits and the Format of Pollutant Discharge Permits (Huan Gui Cai [2018] No.80) shall be implemented in accordance with the provisions of this Notice.

2026-06-09

Recently, TOYO, a Japanese photovoltaic manufacturer, announced plans to expand the capacity of 1.5g W heterojunction batteries in Houston, Texas, USA.

2026-06-09

On June 4, China Energy Construction Group, Guoxuan Gaoke and the United Arab Emirates AMEA Power signed three new energy cooperation agreements, covering two independent battery energy storage system engineering EPC and energy storage battery production base construction cooperation.

2026-06-09

On June 5, the Inner Mongolia Regulatory Bureau of the China Securities Regulatory Commission issued a decision on administrative penalties ( [2026] 1), and Yili Jieneng, its controlling shareholder Yili Group, and 26 responsible persons were fined a total of 244.6 million yuan.

2026-06-09

The assets of Huajian Concrete Company in Laibin City, Guangxi are about to be auctioned, with a starting price of 21.8695 million yuan.

2026-06-09

When the industry breaks down, it never starts until it's ready. The longer you wait, the higher the price.

2026-06-09

As the first pilot province of cement carbon footprint label certification in China, Ningxia has started the basic capacity building of cement industry carbon footprint since 2024.

2026-06-09

The Energy Bureau of Ordos City, the Energy Bureau of Alxa League and the Forestry and Grassland Bureau of Alxa League in Inner Mongolia Autonomous Region have launched the annual competitive allocation and optimization of photovoltaic sand control projects, involving a total scale of 11.5G W.

2026-06-09

Recently, a number of head salt lake lithium extraction enterprises in Qinghai suddenly spread the news of power transformation and phased production reduction. By the end of June, Qinghai will carry out large-scale power upgrading and transformation, and the whole maintenance cycle is expected to be as long as half a month.

2026-06-09

During the safety month, the hard core of the conch staff skills competition is remarkable, praise one! By the way, I would like to add a compliment to the specifications for the placement of drawings during the competition!

2026-06-09

In May 2025, Jixiang Cement Co., Ltd. and ASEAN Energy Technology Co., Ltd. formally signed the overall lease agreement of the whole project, relying on the strong industry accumulation and mature market resources of the partners to focus on the resumption of production, firmly hold the bottom line of value preservation and appreciation of state-owned assets, and open up a new path of long-term sustainable development of the project!

2026-06-09

 1 2 3 4 5 6 ...  1250

When the industry breaks down, it never starts until it's ready. The longer you wait, the higher the price.