3.2 Billion Transactions, China Power Construction Wins a Large Mine in Yunfu, Guangdong Again

2023-02-08 11:31:32

The project is planned to be transferred for 20 years, with an annual output of 8.5 million cubic meters, a mining area of 1.519 square kilometers, a 14842 reserve of 5900 cubic meters of granite for construction, and a cover volume of 51.461 million cubic meters.

On February 7, the mining right of granite mine for construction in Niulankeng Mining Area, Duyang Town, Yunan District, Yunfu City, Guangdong Province was successfully sold, with an initial listing price of 2.58 billion yuan, and China Electric Power Construction (Yunfu) Green Mining Co., Ltd. successfully won by 3.2 billion yuan, with a premium rate of 24.03%.

The project is planned to be transferred for 20 years, with an annual output of 8.5 million cubic meters, a mining area of 1.519 square kilometers, a 14842 reserve of 5900 cubic meters of granite for construction, and a cover volume of 51.461 million cubic meters.

According to the Digital Building Materials DataBM. Com, China Power Construction (Yunfu) Green Mining Co., Ltd. is established by China Power Construction Road and Bridge Group Co., Ltd., China Water Conservancy and Hydropower Sixth Engineering Bureau Co., Ltd., China Power Construction Group East China Survey and Design Institute Co., Ltd., Yunfu Zhenyun Mineral Co., Ltd. and Yunfu Yunan Anfa Asset Management Co., Ltd. according to the share ratio. On February 23,

2022, China Power Construction (Yunfu) Green Mining Co., Ltd. won the mining right of granite for construction in Guanyin Mountain, Duyang Town, Yunan District, Yunfu City, Guangdong Province for 6.1 billion yuan, and obtained the mining license issued by Yunfu Natural Resources Bureau on July 22, 2022. The planned land area of the project is about 5510 mu, the maximum mining elevation is + 570m, the reserve of granite resources in the area is 303 million cubic meters (about 800 million tons), and the preliminary estimated investment is over 10 billion yuan.

All can be viewed after purchase
Correlation

The project is planned to be transferred for 20 years, with an annual output of 8.5 million cubic meters, a mining area of 1.519 square kilometers, a 14842 reserve of 5900 cubic meters of granite for construction, and a cover volume of 51.461 million cubic meters.

2023-02-08 11:31:32

On January 15, 2021, Fujian Provincial Department of Industry and Information Technology announced the capacity replacement plan of Fujian Cement Co., Ltd. for the construction project of cement clinker production line with a daily output of 4500 tons, which was not organized and implemented for some reasons. Now the enterprise applies for the change of the announcement.