Ningde Times 30G Wh Battery Project will be put into production

2023-10-23 09:33:01

It will be put into operation on October 27.

On October 19, Ningde Times Guizhou New Energy Power and Energy Storage Battery Manufacturing Base Project, located in Guian New District, Guizhou Province, entered the final stage before putting into operation, and supporting facilities such as substations and canteens have been put into use.

At present, the first phase of the project is progressing smoothly and will be put into operation on October 27. After mass production, it will gradually form an industrial ecology and promote Gui'an New Area to build a production base for new energy vehicles, batteries and materials.

It is reported

that the total land area of Guizhou New Energy Power and Energy Storage Battery Manufacturing Base Project in Ningde Age is about 1435 mu, and it is planned to build an annual production base of 60 GWh power and energy storage batteries. The project will be divided into two phases .

Among them, the planned land for the first phase of the project is about 885 mu , with a total investment of about 7 billion yuan , and the construction will be officially started in early 2022. It adopts the most advanced production line with high rhythm, high automation rate and high flexibility in Ningde era, and designs an annual production capacity of 30GWh power and energy storage battery production line and related supporting facilities.

Ningde Times said that the company will take Guiyang as an important base to jointly build a whole industrial chain system based on green low-carbon or even zero-carbon from upstream phosphate mining, production of phosphorus-fluorine chemical battery materials to lithium battery manufacturing, and extend to downstream applications until battery recycling.


All can be viewed after purchase
Correlation

The investment is 28 billion yuan and the land is 1580 mu.

2023-11-27 14:51:08

It will be put into operation on October 27.

2023-10-23 09:33:01

The raft of Tonghao Electrochemical Kechuang Building Project, which was exclusively supplied by Guancheng Factory of Henan Business Department of China Construction Western Construction Xinjiang Co., Ltd., was successfully poured.

2023-09-05 10:08:57

On October 28, Conch Cement released the third quarter report of 2026. In the first three quarters of 2026, the operating income was 56.222 billion yuan, a year-on-year decrease of 8.58%; the net profit attributable to parent company was 2.743 billion yuan, a year-on-year decrease of 56.89%; the net profit deducted from non-profits was 2.009 billion yuan, a year-on-year decrease of 66.50%.