Announcement of the Development and Reform Commission of Hainan Province on the Implementation of the Rectification Measures for the Implementation of the Third Round of the Central Eco-environmental

2025-10-27 14:06:36

Hainan promotes the construction of ecological civilization, completes many rectification tasks such as clean energy island, optimizes energy structure, upgrades infrastructure, and builds a national "Hainan model" of green and low-carbon transformation.

Announcement

of the Development and Reform Commission

of

Hainan Province on the Implementation of the Rectification Measures

for the Implementation of the Third Round of the Central Eco-environmental Protection Supervision Report in Hainan Province (No.1) According to the implementation of the Central Eco-environmental Protection Supervision Rectification in Hainan Province According to the relevant requirements of the marketing work, the completion of the rectification measures (No.1) for the implementation of the Third Round of Central Eco-environmental Protection Supervision Report Rectification Plan in Hainan Province is now publicized, and the publicity period is from October 24 to November 6, 2025. During the publicity period, the public is welcome to make comments and suggestions on the rectification.

Contact number: 66108539, email: hzc_fgw@hainan.gov.

It is hereby announced.

Hainan Provincial Development and Reform Commission

October 24, 2025 The Development and Reform Commission


of Hainan Province implemented the Rectification Measures for Implementing the Third Round of Central Eco-environmental Protection Supervision Report Rectification Plan in Hainan Province (No.1)

Publicity

Form of Rectification Completion

rectification leading unit

, Hainan Provincial Development and Reform Commission

, will rectify the deadline

by the end of March 2025 and insist on

the contact person and telephone number

He Huihai for a long time.

In recent years, our committee has thoroughly implemented the national "double carbon" strategic goal and comprehensively promoted the construction of clean energy island. Hainan has made breakthroughs in energy production, consumption structure optimization, new power system construction and infrastructure upgrading, providing a "Hainan model" for the national energy green and low-carbon transformation.

(1) The level of clean energy production and consumption has been greatly improved

. By 2024, the total primary energy production in Hainan Province has reached 11.26 million tons of standard coal, and the total production target of the 14th Five-Year Plan for Energy Development has been fulfilled ahead of schedule, which is 165% higher than that in 2018, with an average annual growth rate of 17.6%. Among them, the proportion of clean energy production is as high as 92. The level of clean energy consumption has been significantly improved, and the proportion of clean energy consumption has reached 43.5%, an increase of 9.7 percentage points over 2018. The consumption of natural gas and non-fossil energy has been increased by 13.1% and 11.

The power supply system has achieved "clean + diversification", and the proportion of clean energy consumption has been increased. The proportion of clean energy, non-fossil energy and renewable energy installed in the province reached 83.9%, 56.8% and 50.3% respectively, and the proportion of clean energy in the unified power generation was 68. Major projects such as Changjiang Nuclear Power Phase II and offshore wind power were accelerated, and offshore wind power projects were successfully connected to the grid. (2) Accelerating the construction of new power systems and significantly improving

the reliability of power supply Hainan has taken the lead in building a smart grid demonstration province." The reliability of power supply has been raised to 99.500 kilovolt, and the construction of the main grid has been steadily promoted. The 220 kilovolt main grid pattern of "double-circuit outer ring and single-word inner ring" has been formed. The digital grid platform has realized the sharing of global data, and the accuracy of key equipment data has exceeded 99%. In addition, the provincial virtual power plant management center has landed in Hainan, with an adjustable load resource scale of 500000 kilowatts, and the demand side response capacity has been significantly enhanced.

(3) Oil and gas facilities have been gradually upgraded, and gas fields such

as Dongfang 13-2 and Lingshui 17-2 have been put into operation, with an annual output of over 8.8 billion cubic meters of natural gas. The natural gas pipeline network around the island covers 12 cities and counties, and the project of gas going to the countryside benefits the whole province. By the end of 2024, a total of 4379 charging stations and 81 power exchange stations have been built in Hainan, with a total of 183800 charging piles (guns), and the ratio of vehicles to piles has reached 2. 100% coverage of charging facilities has been achieved in expressway service areas and all townships, which fully meets the travel needs of electric vehicle around the island and promotes low-carbon transformation in the field of transportation.

(4) Deepening mechanism reform and moving towards international

energy cooperation Hainan has deepened energy price reform and completed three rounds of transmission and distribution price reform. Establish a normal trading mechanism of "green electricity + green certificate", and break through the volume of green electricity trading in 2024. 14. Establish a cross-provincial power mutual aid mechanism, and guarantee the supply of foreign electricity in 2024. 4. Relying on Hainan International Energy Exchange Center, the total trading volume of the platform has broken through 1. In addition, Hainan has successfully held the "China-ASEAN Clean Energy Cooperation Week" and "World New Energy Vehicle Conference". We will deepen cooperation with Shenzhen and other regions in the field of new energy and promote global sharing of clean energy technologies.

(5) Coordinated development of technology and industry, continuous building of new energy productivity

, Hainan has successfully built tropical smart grid, charging facilities "one network", island micro-grid technology and other original technology sources. Offshore wind power equipment industry projects such as Mingyang, Shanghai Electric and Dongfang Electric have been completed and put into operation, the world's longest blade has officially rolled off the production line in Hainan, and the first phase of large-scale offshore wind turbine testing base has been put into operation in Lingao. The "Deep Sea No.1" project won the first prize of the National Science and Technology Progress Award and tackled the key technologies of deepwater oil and gas field exploration.

Our Committee has fully implemented Xi Jinping's thought of ecological civilization, firmly promoted the construction of the national ecological civilization pilot area, and promoted the construction of clean energy island by promoting the low-carbon transformation of energy production structure, the overall upgrading of energy infrastructure and the coordinated development of technology and industry. It provides a "Hainan model" for the national energy green low-carbon transformation.

All can be viewed after purchase
Correlation

Hainan promotes the construction of ecological civilization, completes many rectification tasks such as clean energy island, optimizes energy structure, upgrades infrastructure, and builds a national "Hainan model" of green and low-carbon transformation.

2025-10-27 14:06:36

According to the big data of cement network, the current cement inventory in Hebei region is relatively high, with a storage capacity ratio of 75%, and the recent increase is obvious; the demand side is flat, with a cement shipment rate of 47.5% in Hebei.