Concrete prices continue to fall! The number of shutdown and semi-shutdown enterprises continued to increase! The association issued a proposal!

2025-03-21 11:12:26

Since last year, the ready-mixed concrete industry in Xi'an has been facing difficulties due to the contraction of market demand, poor repayment, cost and profit pressure, and the problem of overcapacity has become increasingly serious.

Recently, Xi'an Building Energy Conservation Association issued a proposal on improving the quality and safety of ready-mixed concrete industry in our city, strengthening self-discipline and opposing vicious competition. Since

last year, the ready-mixed concrete industry in Xi'an has been facing difficulties due to the contraction of market demand, poor repayment, cost and profit pressure, and the problem of overcapacity has become increasingly serious. The price of concrete raw materials in Xi'an has risen since the second half of 2024, with the price of cement rising by about 150 yuan/ton, the price of mineral powder rising by about 20 yuan/ton, and the price of sand and gravel rising by about 5 yuan/ton. Concrete prices continue to decline, the current market sales price and the actual cost of long-term inversion, extreme compression of the profit margin of concrete, shutdown and semi-shutdown enterprises continue to increase , there may be some enterprises in order to compete for market share, adopt the vicious competition mode of price-for-quantity, quantity-for-loss, wantonly destroy the industry self-discipline convention, and the industry self-discipline convention. Acts that seriously disrupt the market order of the industry.

To this end, the Xi'an Building Energy Conservation Association issued an initiative, the full text of which is as follows:

All can be viewed after purchase
Correlation

Since last year, the ready-mixed concrete industry in Xi'an has been facing difficulties due to the contraction of market demand, poor repayment, cost and profit pressure, and the problem of overcapacity has become increasingly serious.

2025-03-21 11:12:26

The new Wuhan hub through line project is drawn from Yunmeng East Station of Hanshi high-speed rail, with Xiaogan South Station and Hanyang Station, crossing the Yangtze River along the Third Ring Road of Wuhan City, with Baishazhou Highway and Railway Yangtze River Bridge, and connecting Wuhuang Intercity after crossing the river. The newly-built main line is 72.193 km long (the length from the junction point of Yunmeng East to the dividing point at the north end of the same line with Wuyi is 40.149 km; the length from Zoumaling Line Station (excluded) to Huangjiahu Line is 32.044 km long), and the connecting line is 8.605 km long. Among them, the main bridge of the newly-built Baishazhou Rail-cum-Road Yangtze River Bridge is 2623 meters long, and the first-and second-line railways, upper highways and synchronous construction of the rail-cum-road joint construction section on both sides of the river