20GW! Huadian Releases Bidding for Centralized Procurement of PV Modules

2025-07-30 12:01:40

On July 29, the e-commerce platform of China Huadian Group issued a tender announcement for centralized procurement of photovoltaic modules by China Huadian Group Co., Ltd. in 2025-2026. The content of the announcement shows that this collection includes two bidding sections of N-type TOPCon component frame and N-type high-efficiency component frame. The procurement scope is N-type TOPCon monocrystalline silicon double-sided double-glass components and N-type high-efficiency monocrystalline silicon double-sided double-glass components required by some new energy projects of Huadian Group within the validity period of the framework. The estimated procurement scale is 18 GW and 2G W respectively.

On July 29, the e-commerce platform of China Huadian Group issued a tender announcement for centralized procurement of photovoltaic modules by China Huadian Group Co., Ltd. in 2025-2026.

The announcement shows that the collection includes two bidding sections of N-type TOPCon component frame and N-type high-efficiency component frame . The scope of procurement is N-type TOPCon monocrystalline silicon double-sided double-glass components and N-type high-efficiency monocrystalline silicon double-sided double-glass components required by some new energy projects of Huadian Group within the validity period of the framework. The estimated procurement scale is 18GW and 2GW respectively.

The bidding project is divided into 2 bid sections, specifically:

(1) Bid section I (N-type TOPCon module framework) (CHDTDZ046/16-SB-16201): N-type TOPCon monocrystalline silicon double-sided double-glass modules required by some new energy projects of Huadian Group within the validity period of the framework. The module and cell size is not limited, the module conversion efficiency is > 22.5%, and the estimated purchase scale is 18000MW.

(2) Bid Section II (N-type high-efficiency module framework) (CHDTDZ046/16-SB-16202): N-type TOPCon, HJT, BC and other types of high-efficiency monocrystalline silicon double-sided double-glass modules required by some new energy projects of Huadian Group within the validity period of the framework, the size of modules and cells is not limited. The module conversion efficiency is 23.8%, and the estimated procurement scale is 2000MW. In

addition to good business reputation, operating conditions and corresponding qualifications, the bidder's cumulative domestic contract performance of N-type monocrystalline silicon photovoltaic modules (nominal power not less than 575 Wp) from January 1, 2024 to the deadline for bidding (subject to the time of contract signing) shall not be less than 1000 MW. Consortium bidding and agent bidding are not accepted for

this project, except for the sales enterprises that belong to the same group company as the bidding product manufacturer. The deadline for bid

opening/submission is 9:30 on August 19, 2025.

All can be viewed after purchase
Correlation

Ningde Times responded to market concerns: in 2027, the global demand for power batteries and energy storage still has growth potential, the capacity utilization rate is healthy, and the supply chain support measures affect cash flow in the short term but are conducive to long-term sustainable development.

2026-10-21 15:07:33

On October 16, the official website of the Management Committee of Yangzhou Economic and Technological Development Zone of Jiangsu Province announced the approval opinions on the EIA documents of "Jingao Yangzhou R & D No.1 Solar Cell Technology Research and Development Project" and "Jingao Yangzhou Base Battery Technology Renovation Project".

2026-10-19 17:09:21

A total of 6 manufacturers on the component side lowered their quotations by 0.01-0.03 yuan/W.

2026-10-16 16:07:59

At the same time, the BC technical transformation project is also being carried out.

2026-10-15 17:37:22

On October 10, the Ecological Environment Bureau of Leshan City, Sichuan Province, issued a public announcement on the approval of the ecological environment impact assessment document of Yongxiang New Energy High Purity Silicon Pilot Project.

2026-10-14 14:18:12

Shanghai Customs took the initiative to guide the obligee to apply for the record of customs protection of intellectual property rights and general guarantee, simplify the guarantee procedures one by one, so as to simplify the rights protection process and lower the cost. Brand technical specialist were invited to explain the latest counterfeiting methods and identification skills to the front-line customs inspectors at the port, so as to help them train their "golden eyes" to identify the risk of infringement.

2026-10-10 14:30:22

Here is the domestic concrete price statistics in September, the overall national concrete price ring ratio is -0.70%, year-on-year is -6.05%, covering the price changes in all regions from the end of August to the end of September, the region with a large ring ratio change is Shanghai, the corresponding ring ratio is -3.28%, the region with a small ring ratio change is more than one, and some regions are 0.00%. Prices have not changed from the previous month.

2026-10-08 09:25:08

What is happening in the cement industry?

2026-10-07 07:02:03

What is happening in the cement industry?

2026-10-05 07:07:03

What is happening in the cement industry?

2026-09-27 07:02:02

Unconditionally approve the acquisition of Lihao Qingneng shares by Tongwei shares in accordance with the law. Despite the high total share of both parties in the solar-grade polysilicon market, the General Administration believes that the current market has sufficient capacity and more competitors, and the entities will still face effective competition constraints after centralization, and the transaction will not have the effect of excluding and restricting competition in the relevant market.

2026-09-25 11:44:53

According to the data from January to July, the newly installed photovoltaic capacity in August was 11.04 GW, which was 21.59% lower than that in July, and was also lower than that in June (14.36 GW), which was 50% higher than that in August 2025.

2026-09-24 14:15:53

In view of the follow-up market situation, the Silicon Branch believes that the main variables lie in the downward range of the actual start-up rate of enterprises and the implementation of the production reduction plan, the sustainability and scale of spot transactions under the current price system, and the degree of recovery of terminal demand.

2026-09-24 09:56:00

At present, there are incentive policies for dealers, and there is more room for bargaining.

2026-09-22 17:58:10

A leader in the field of "computing power" has entered the energy storage industry, and the springboard for its market application is liquid cooling and heating management technology.

2026-09-18 16:37:13

The regular quotation is calm as a whole, but the internal price has changed in both directions.

2026-09-18 16:23:05

According to data released by the National Bureau of Statistics on September 15, industrial added value above the scale increased by 5.2% in August 2026, 0.7 percentage points faster than last month. Among them, the output of photovoltaic cells in August was 67.02 million kilowatts, down 12.9% year-on-year; the output of photovoltaic cells from January to August this year was 505.9 million kilowatts, down 14.6% year-on-year.

2026-09-15 10:37:36

However, at present, it is common to see the use of forklifts with "local materials" and the use of forklifts as cranes.