2x1000Nm³/h! Xinjiang Yining Green Power Hydrogen Production Project Electrolyzer Bidding!

2025-08-07 10:50:07

Yining City, Xinjiang started the bidding for the green hydrogen production project, and constructed two sets of 1000Nm ³/H water electrolysis hydrogen production devices and related supporting equipment to promote the development of green hydrogen energy industry.

Recently, the equipment procurement of large-scale hydrogen production project of green power in Yining City, Xinjiang, was tendered publicly.

According to the tender announcement, the equipment procurement and construction contents of the large-scale hydrogen production project of Yining Green Power include: hydrogen production station a. Hydrogen production by electrolysis includes two sets of 1000Nm ³/H water electrolysis devices, supporting separation devices, hydrogen purification devices, alkali preparation systems, water chillers, cooling water circulation devices, pure water replenishment systems and storage tanks, and reserved oxygen purification; B. It is equipped with 20 MPa hydrogen compressor and 20 MPa double-tube filling cabinet.

The details are as follows:

All can be viewed after purchase
Correlation

Yining City, Xinjiang started the bidding for the green hydrogen production project, and constructed two sets of 1000Nm ³/H water electrolysis hydrogen production devices and related supporting equipment to promote the development of green hydrogen energy industry.

2025-08-07 10:50:07

From October 12, 2026 to October 18, 2026, Hainan Province has the highest rate of opening cement kilns in all provinces, with the rate of 83.33%. Kiln opening rate of 50% and above: 68.52% in Shandong Province, 67.20% in Zhejiang Province, 67.18% in Anhui Province, 62.22% in Hubei Province, 56.12% in Jiangsu Province and 50.36% in Hebei Province.