2500t/d+4000t/d! The capacity of two clinker production lines of Conch Cement is merged into one.

2025-04-24 10:42:22

The existing new dry process cement clinker production line with a daily output of 2500 tons (Φ4.0 * 60m) will be merged into a new dry process cement clinker production line with a daily output of 4000 tons (Φ4.8 * 72m) (i.e. 2 # clinker line). The total capacity will remain unchanged after the merger.

Recently, Guangdong Qingyuan Guangying Cement Co., Ltd. 2 # clinker production line comprehensive energy efficiency improvement technology transformation project carried out the first information announcement of environmental impact assessment.

The project intends to carry out comprehensive energy efficiency improvement technology transformation for 2 # clinker line, improve clinker quality and reduce energy consumption index of production line through integrated innovation technologies such as cyclone structure transformation and decomposition furnace transformation. The existing new dry process cement clinker production line with a daily output of 2500 tons (Φ4.0 * 60m) will be merged into a new dry process cement clinker production line with a daily output of 4000 tons (Φ4.8 * 72m) (i.e. 2 # clinker line). The total capacity will remain unchanged after the merger. After the implementation of the project, the standard coal consumption and comprehensive power consumption of 2 # clinker burning system will reach the advanced level of the industry.

Existing projects and their environmental protection:

Guangdong Qingyuan Guangying Cement Co., Ltd. has two new dry process cement clinker production lines with a daily output of 2500 tons and a daily output of 4000 tons. Among them, 2500 tons/day production line is equipped with 5MW cement kiln pure low-temperature waste heat flash evaporation power generation system and flue gas out-of-stock project, 4000 tons/day production line is equipped with 9MW cement kiln pure low-temperature waste heat flash evaporation power generation system and flue gas denitrification project and 900000 tons/year grinding station project, with an annual clinker production capacity of 2.145 million tons. In addition, Qingyuan Haichuang Environmental Protection Technology Development Co., Ltd. uses 4000 tons/day clinker new dry process production line cement kiln to co-dispose solid waste project.

At present, the supporting environmental protection facilities in the plant area are relatively perfect, and the pollutants are discharged steadily up to the standard. The wastewater pollution prevention measures include one 5t/d buried sewage treatment plant and one 3t/d buried sewage treatment plant; the waste gas pollution prevention measures include two sets of kiln inlet flue gas denitration and dust removal facilities, two sets of kiln outlet flue gas dust removal facilities and several sets of other dust-containing waste gas dust removal facilities; Temporary solid waste storage facilities include a temporary storage room for general solid waste and a temporary storage room for hazardous waste.

All can be viewed after purchase
Correlation

The existing new dry process cement clinker production line with a daily output of 2500 tons (Φ4.0 * 60m) will be merged into a new dry process cement clinker production line with a daily output of 4000 tons (Φ4.8 * 72m) (i.e. 2 # clinker line). The total capacity will remain unchanged after the merger.

2025-04-24 10:42:22

In order to further study and implement Xi Jinping's thought of ecological civilization, resolutely implement the deployment requirements of the State Council's Action Plan for Continuous Improvement of Air Quality, conscientiously implement the work arrangements of the Party Committee and the government of the autonomous region, and continuously consolidate the achievements of the year of tackling key problems in the protection and control of the ecological environment, on October 15, 2026, the State Council of the People's Republic of China decided to implement the plan. The People's Government of the Autonomous Region held a kick-off meeting on air pollution prevention and control in the winter and spring of 2026-2027. Vice Chairman Liu Jun presided over and delivered a speech. Members of the leading group of the construction of ecological civilization of the Party Committee of the Autonomous Region are responsible for comrades, members of the team of the Department of Ecological Environment and relevant departments and institutions.