On December 16, the Department of Industry and Information Technology of Guizhou Province issued a public announcement on the capacity transfer plan of the new dry process cement production line with a daily output of 2500 tons of clinker of Guizhou Qiangui Sanhe Cement Co., Ltd.

The scheme content shows that the original design capacity of 4000t/d clinker new dry process cement production line of Guizhou Jinjiu Cement Co., Ltd. is 4000t/d, and the supplementary capacity of 1166t/d comes from a 2500t/d clinker line of Guizhou Qiangui Sanhe Cement Co., Ltd., with a replacement ratio of 1.5: The total capacity after supplementation is 5166t/d; The original design capacity of the 4500t/d clinker NSP cement production line of
Guizhou Qiangui Jinzhou Building Materials Co., Ltd. is 4500t/d, and the supplementary capacity of 500t/d comes from the 2500t/d clinker production line of Guizhou Qiangui Sanhe Cement Co., Ltd. The total capacity after the supplement is 5000t/d, and the replacement ratio is 1.5: 1. A 2500t/d clinker production line of
Guizhou Qiangui Sanhe Cement Co., Ltd. is planned to be dismantled and withdrawn before June 1, 2026.

浙公网安备33010802003254号