Recently, the Bureau of Ecology and Environment of Wuhu, Anhui Province, issued the forty-first batch of announcements on the rectification and acceptance of outstanding ecological and environmental problems, involving the rectification problems of three cement enterprises: Digang Conch 2500t/d clinker line equipment aging, unit product energy consumption exceeding the standard; The energy efficiency of the Ruixin Cement Clinker Project is not up to the standard; Wuhu Conch uses obsolete mechanical and electrical equipment with high energy consumption, which has not been transformed, eliminated or updated as required. After the rectification, Digang Conch and Credit Suisse Cement have stopped production and withdrawn from production capacity replacement, and Wuhu Conch equipment has been replaced in place.
浙公网安备33010802003254号