The construction period is urgent! Power China Inner Mongolia 0.5G W/2G Wh Energy Storage System Procurement Termination

2025-09-11 10:58:56

On September 5, the procurement project of Pingchuan Substation 500000 kW/2 million kWh New Energy Storage Special Action Project (Phase I) in Tuquan County, Xing'an League, Henan Engineering Company of China Electric Power Construction was terminated. The reason for termination is that "the owner of this project requires the commencement date to be advanced, the construction period is urgent, and the content of the bid section needs to be adjusted and re-tendered.". This tender is terminated.

On September 5, the procurement project of Pingchuan Substation 500000 kW/2 million kWh New Energy Storage Special Action Project (Phase I) in Tuquan County, Xing'an League, Henan Engineering Company of China Electric Power Construction was terminated. The reason for termination is that the owner of the project requires the commencement date to be advanced and the construction period is urgent, so the content of the bid section needs to be adjusted and re-tendered. This tender is terminated . It is worth noting that the tender announcement was issued on the same day.

Bidding information shows that the owner of the project is Tuquan County Jinze Storage New Energy Co., Ltd., located in Tuquan County, Xing'an League, Inner Mongolia Autonomous Region, to build an energy storage power station (including 220 kV booster station). The scale is 500MW/2000 MWh (AC side), the lithium iron phosphate battery energy storage system is adopted, and the liquid-cooled prefabricated cabin scheme is adopted for the energy storage battery cabin; The supporting 220kV transmission line project is planned to be connected to the 220kV side of Pingchuan 500kV Substation, with a line path length of about 4km.

All can be viewed after purchase
Correlation

On September 5, the procurement project of Pingchuan Substation 500000 kW/2 million kWh New Energy Storage Special Action Project (Phase I) in Tuquan County, Xing'an League, Henan Engineering Company of China Electric Power Construction was terminated. The reason for termination is that "the owner of this project requires the commencement date to be advanced, the construction period is urgent, and the content of the bid section needs to be adjusted and re-tendered.". This tender is terminated.

2025-09-11 10:58:56

Prices in Ningxia are stable but export sales are low, Gansu is facing callback pressure after price increases, sales in Qinghai are not up to expectations after pushing up, Shaanxi has great resistance to price recovery, Xinjiang is stable due to engineering demand, and the overall market is mainly stable price wait-and-see in the short term.