On June 8, the tender announcement for high-efficiency photovoltaic modules and accessories of Hongshagang 1.2 million kilowatt photovoltaic project in Minqin County, Wuwei City, Gansu Tengger Desert Hexi New Energy Base was issued.
The content shows that the bidding for the 1.2 million kilowatt photovoltaic project components in Hongshagang is divided into two bidding sections. Among them, 584.64 MWp photovoltaic modules and related installation accessories were purchased in the first bid section, and 677.99 MWp high-efficiency photovoltaic modules and related installation accessories were purchased in the second bid section. Installation guidance and commissioning guidance services shall be provided simultaneously for both bid sections. In terms of


performance, the first bid section requires bidders to bid from January 1, 2023 (the time is based on the date of contract signing) to the deadline for bidding. Domestic contract performance with 700Wp and above series components accumulated not less than 1GWp (non-related transactions) (and 0 HTML0UNK in contract performance 18 at least 0 HTML0 UNK1 9 with 0 HTML0 UNK2 0 one single item 0 HTML0 UNK2 1 capacity 0 HTML0 UNK2 2 not less than 350 MWp 0 HTML0 UNK2 3); The second bid section requires the bidder to have the domestic contract performance of 0 HTML0 UNK2 4600Wp and above 0 HTML0 UNK2 5 series components accumulated 0 HTML0 UNK2 6 not less than 1GWp0HTML0 UNK2 7 components (non-related transactions) within the above time limit. 0HTML0UNK28
浙公网安备33010802003254号