China Water Conservancy and Hydropower Third Engineering Bureau won the bid for 3.776 billion yuan project

2026-06-15 11:33:51

This is a key demonstration project of green mine construction and intelligent transformation in Gansu Province, which integrates driverless electric mine card, 5G industrial Internet and self-built green power in mining areas, and belongs to the integration project of "mining digitalization + new energy self-supply" which landed earlier in China. It is noteworthy that Sinohydro Bureau III won the first prize with the highest quotation (377.6034 million yuan) among the three companies, while Gezhouba No.2 Company (370.7561 million yuan) with low quotation only ranked second-under the comprehensive scoring system, the weight of construction credit and technical scheme is significantly higher than that of pure quotation.

This is a key demonstration project of green mine construction and intelligent transformation in Gansu Province, which integrates driverless electric mine card, 5G industrial Internet and self-built green power in mining areas, and belongs to the integration project of "mining digitalization + new energy self-supply" which landed earlier in China. It is noteworthy that Sinohydro Bureau III won the first prize with the highest quotation (377.6034 million yuan) among the three companies, while Gezhouba No.2 Company (370.7561 million yuan) with low quotation only ranked second-under the comprehensive scoring system, the weight of construction credit and technical scheme is significantly higher than that of pure quotation.

[Project Name] Qingshagou Manganese Mine Intelligent Stripping + Lvdian Zhilian Project

in Aksai Kazakh Autonomous County [First Bid Winner and Quotation] Sinohydro Bureau 3 Co., Ltd.: 377, 603.388136 million yuan

[Basic information of the project] The project is located in Aksai Kazakh Autonomous County, Gansu Province, and is a demonstration project of intelligent transformation of green mines. Full-automatic stripping system is adopted for the project, including driverless electric dump truck, automatic drilling and blasting device, and field monitoring platform based on 5G/industrial Internet. About 10MW solar photovoltaic and wind power devices are synchronously arranged in the mining area, forming closed-loop green power self-supply. China Gezhouba Group No.2 Engineering Co., Ltd. ranked second with a quotation of 3,707,560,963.04 yuan (the lowest of the three companies), and Sinohydro Bureau No.8 ranked third with a quotation of 3,82,565,5406.62 yuan (the highest of the three companies). The quotation span of the three companies was about 11.8 million yuan, with a difference of about 3.2%.

All can be viewed after purchase
Correlation

This is a key demonstration project of green mine construction and intelligent transformation in Gansu Province, which integrates driverless electric mine card, 5G industrial Internet and self-built green power in mining areas, and belongs to the integration project of "mining digitalization + new energy self-supply" which landed earlier in China. It is noteworthy that Sinohydro Bureau III won the first prize with the highest quotation (377.6034 million yuan) among the three companies, while Gezhouba No.2 Company (370.7561 million yuan) with low quotation only ranked second-under the comprehensive scoring system, the weight of construction credit and technical scheme is significantly higher than that of pure quotation.

2026-06-15 11:33:51

A few days ago, according to the transfer information released by the relevant platform, the 100% equity of China Resources Cement (Wuzhishan) Co., Ltd. and the transferor transferred 6.86 million yuan of creditor's rights to the target enterprise, with the transfer base price of 7.52 million yuan for the 16223, and the transfer base price of the previous listing was 1.19 million yuan for the 20108, this time for the transfer at a reduced price.