On October 22, the Ecological Environment Sub-bureau of Jin'an District, Lu'an City, Anhui Province issued the public announcement before the approval of the EIA reports of "150 MW Fishing-Photovoltaic Complementary Power Generation Project in Chunshu Town, Jin'an District" and "50 MW Agricultural-Photovoltaic Complementary Power Generation Project in Shiqiao Town, Jin'an District".
Among them, the 150 MW fishing-photovoltaic complementary photovoltaic power generation project in Chunshu Town, Jin'an District, is located in the water surface of pits and ponds (involving 19 villages such as Caomiao Village) in Chunshu Town, Jin'an District, Lu'an City, Anhui Province, and is constructed by Shengyang New Energy Co., Ltd. The total investment is 625.1876 million yuan .

The 150MW fishing-photovoltaic complementary photovoltaic power generation project in Chunshu Town, Jin'an District is planned to be constructed by using the water surface of pits and ponds, with a rated capacity of 150 MW and a DC side installed capacity of 180.0162 MWp. Installation of 630Wp N-type monocrystalline silicon double-sided photovoltaic modules 285 740.
The project consists of 112 power generation units, 454 330 kW string inverters and 112 oil-immersed box-type transformers, 6 new 35 kV collector lines with a path length of 95.7 km, and covers an area of 3500 mu. It is estimated that the annual power generation will be 19793 85000 kilowatt-hours. The construction period of the
project is 10 months. Located in Hongyan Village, Liandun Village and Wushipu Village, Sungang Town, Jin'an District, Anhui Province, the 50 MW Agricultural Photovoltaic Power Generation Project in Shiqiao Town,
Jin'an District is constructed by Shengyang New Energy Co., Ltd. of Lu'an.
The project plans to invest 98.4104 million yuan to construct a 50 MW agricultural-photovoltaic complementary photovoltaic power generation project in Shiqiao Town, Jin'an District by using the water surface of pits and ponds. However, as the energy index is only 23.2MW, the project is actually approved to build a photovoltaic capacity of 23.2M W (AC side).

The project plans to install 45052 630Wp monocrystalline silicon photovoltaic modules, a total of 32 pit photovoltaic plots, and 71 330 kW string inverters. After the completion of the
project, it is estimated that the annual power generation will be 31.34 million kWh and the construction period will be 9 months.