Results of Winning the Bid for 790 Million Projects in Sichuan

2026-05-06 09:37:25

The project period is 30 years, including construction and operation. Of which: construction period: 8 years; operation period: within 30 years (determined according to the circulation of forest land and the transfer of project construction).

Bazhong Enyang District National Reserve Forest Construction Project (Central Area) Design and Construction General Contracting

Construction Location: Central Area: Involving Nine Towns, Liulin Town, Mingyang Town, Xinglong Town, Yuxi Town, Construction Scale of 6 Towns

in Yushan Town: The central area: The total scale of the project is 136138. 2 mu, and the main construction contents include the following: ① Afforestation project: The existing forest cultivation 10187 is 9.5 mu, and the young and middle-aged forest tending 34258 is. 7 mu. ② Undergrowth economy and forestry industrial engineering: undergrowth wormwood, undergrowth dwarf gingko, undergrowth epimedium, etc. Are about 26000 mu, and leech breeding, etc. ③ Construction of supporting infrastructure: the road works include 11 km of patrol footpath, 9 km of newly-built forestry production road and 7 km of reconstructed forestry production road; the irrigation works include 3 sets of irrigation systems and 10 reservoirs; the power system includes 2 lighting and power systems; the fire protection works include 2 fire protection watchtowers and 5 sets of fire extinguishing equipment; The construction project includes a forestry management and protection station of 800 ㎡, a production management room of 1400 ㎡, a warehouse and transfer warehouse of 12000 ㎡, and a nursery base of 250 mu; science and technology and monitoring is a forestry intelligent monitoring system; Other supporting facilities mainly include 4 sets of under-forest economic production facilities and equipment, 1 set of forest health care facilities, 1 set of signs, 5 ecological toilets, 2000 ㎡ timber yard, and 200 mu of greenhouse and temperature control system.

Planned construction period: The project period is 30 years, including construction and operation. Of which: construction period: 8 years; operation period: within 30 years (determined according to the circulation of forest land and the transfer of project construction).

Bidding scope: ① Design: complete the annual operation design and budget preparation for afforestation and forest cultivation, complete the operation task design and budget preparation for the under-forest economic industry, complete the project construction planning and design for its supporting infrastructure, and complete the construction drawing preparation and budget preparation; provide the results meeting the requirements of the Employer and complete the review and examination at all levels; During the construction stage, cooperate with the Employer to complete the construction technical disclosure, technical changes and related work after completion; ② Construction: including but not limited to all engineering construction, equipment and material procurement and installation, completion acceptance, handover, defect liability period and all work within the warranty period within the scope of construction drawings (including changes); ③ Operation: daily management and protection of trees (including watering, fertilization, pruning, etc.), monitoring and integrated control of pests and diseases, daily maintenance of supporting facilities in forest areas (including roads, irrigation, monitoring facilities, etc.), legal felling and primary processing of trees, management and protection of undergrowth economic industries, harvesting and primary processing of undergrowth products, and other related work.

Bid winning information:

First place: Sichuan Bazhong Xiangheng Forestry Technology Co., Ltd.

China Railway Beijing Engineering Bureau Group Co., Ltd.

Zhongshui Huachuang International Engineering Design Consulting Co., Ltd.

Sichuan Zhongtai Yubang Construction Engineering Co., Ltd. 0H TML0 791815935.350 0 Bid Price (yuan): 791815935.350 HTML0 791815935.350 1

All can be viewed after purchase
Correlation

The project period is 30 years, including construction and operation. Of which: construction period: 8 years; operation period: within 30 years (determined according to the circulation of forest land and the transfer of project construction).

2026-05-06 09:37:25

On May 6, 2026, Huang Linmu, Party Secretary and Chairman of Guoyuan Financial Holding Group, and Wei Lixiang, Deputy Party Secretary and General Manager, visited Conch Group. Conch Group Party Secretary and Chairman Yang Jun, Deputy Party Secretary and General Manager Zhu Shengli, and Deputy General Manager Ding Feng warmly received Huang Linmu and his delegation.