Wuhan to Yichang Expressway Reconstruction and Expansion (Traffic Safety) Bid Results Announced

2026-05-06 09:42:41

Construction overview of existing projects: The section from Wuhan West to Yichang of Shanghai-Chongqing Expressway starts from Wuhan West Hub, passes through Caidian District of Wuhan City, Hanchuan City, Xiantao City and Qianjiang City of Xiaogan City, Jingzhou District and Shashi District of Jingzhou City, Zhijiang City, Yiling District, Wujiagang District and Xiaoting District of Yichang City, and ends at Gaojiadian Hub Interchange of Wujiagang District of Yichang City (intersection of Shanghai-Chongqing Expressway and Ya Expressway). The mileage is about 265.7 kilometers, and the total mileage is about 271 kilometers after Gaojiadian Hub Interchange is connected to Yichang Toll Station. The highway is a two-way four-lane, fully enclosed expressway with cement concrete pavement.

Construction

sites of traffic safety facilities of Wuhan-Yichang Section Reconstruction and Expansion Project

of Shanghai-Chongqing Expressway: Wuhan City, Xiaogan City, Xiantao City, Qianjiang City, Jingzhou City and Yichang City.

Construction Scale: This project starts from Shan Street, Caidian District, Wuhan City, connects with Wuhan West Hub Interchange which has been included in the G4 Beijing-Hong Kong-Macao Expressway Reconstruction and Expansion Project, along the existing expressway reconstruction and expansion, ends at Gaojiadian Hub Interchange, Huya Street, Xiaoting District, Yichang City, and connects with Yichang Liaison Line, with a total length of 266.261 km. There are 27 interchanges along the whole line, 4.796 kilometers of Yichang connecting line and 5.419 kilometers of Sanfutan, Maozui and Qixingtai connecting lines. The main line and Yichang connecting line are reconstructed and expanded according to the standard of two-way eight-lane expressway, with a design speed of 120 km/H, an integral subgrade width of 42 meters, and an additional subgrade width of 20.75 meters on one side. The design vehicle load grade of newly-built and widened bridges and culverts shall be highway grade I, the original load standard shall be used for existing bridges, and other technical indicators shall be implemented in accordance with the Technical Standard for Highway Engineering (JTG BO1-2014). Sanfutan Interchange Connection Line is constructed according to the second-class highway standard, while Maozui and Qixingtai Interchange Connection Line is constructed according to the first-class highway standard. The whole line is provided with 3 monitoring and communication sub-centers, 3 maintenance work areas, 19 ramp toll stations, 1 main line toll station, 5 service areas and 2 parking areas. The total investment of the project is estimated to be about 42.2 billion yuan. The actual construction scale shall be subject to the approval of the relevant competent authorities.

Others: Construction overview of existing projects: The section from Wuhan West to Yichang of Shanghai-Chongqing Expressway starts from Wuhan West Hub and passes through Caidian District of Wuhan City, Hanchuan City, Xiantao City and Qianjiang City of Xiaogan City, Jingzhou District and Shashi District of Jingzhou City, Zhijiang City, Yiling District, Wujiagang District and Xiaoting District of Yichang City. It ends at Gaojiadian Hub Interchange (intersection of Shanghai-Chongqing Expressway and Yichang Expressway) in Wujiagang District, Yichang City, with a total mileage of about 265.7 kilometers. Gaojiadian Hub Interchange is connected to the west, connecting Yichang Toll Station, with a total mileage of about 271 kilometers. The highway is a two-way four-lane, fully enclosed expressway with cement concrete pavement, and the whole line was paved with asphalt concrete pavement in 2006. Anti-collision guardrails (excluding concrete anti-collision guardrails), barriers, signs and markings (including toll stations and service areas), anti-falling nets, anti-glare facilities, sound barriers and other traffic safety facilities within the scope of the main line, connecting line and connecting line of

the project (excluding traffic safety facilities related to Baotong). Excluding the reserved and embedded construction of traffic safety facilities). See the bidding drawings and bill of quantities for the specific quantities.

Bid winning information:

HYJA-1 Bid section:

First place: Shaanxi Jinbaodi Traffic Engineering Construction Co., Ltd.

Bidding price (RMB) 132244999.60

Second place: Fujian Road and Bridge Construction Group Co., Ltd. 0 HTML0 132089108.800 0 Bid Price (RMB) 132089108.800 HTML0 132089108.800 1 Third Place: Sichuan Jingchuan Highway Engineering (Group) Co., Ltd. 0 HTML0 132089108.800 2 Bid Price (RMB) 131986880.000 HTML0 132089108.800 3HYJA-2 Bid Section: 0 HTML0 132089108.800 4 First place: Xuzhou Traffic Engineering General Contracting Co., Ltd. 0 HTML 0 203069530.000 5 Bid price (yuan) 203069530.000 HTML 0 203069530.000 6 Second place: Beijing Hanweida Transportation Equipment Co., Ltd. 0 HTML 0 203069530.000 7 Bid price (yuan) 201981919. 000 HTML 0 203069530.000 8 Third place: Henan Traffic Construction Group Co., Ltd. 0 HTML0 200298966.900 9 Bid Price (RMB) 200298966.900 HTML0 1362000 0HYJA-3 Bid Section: 0 HTML0 UNK2 1 First place: Shanxi Road and Bridge Construction Group Co., Ltd. 0 HTML0 UNK2 2 Bid Price (RMB) UNK2 0 0.000 HTML0 135525 3 Second place: China Railway 21st Bureau Group Dian Wu Dian Hua Engineering Co., Ltd. 0 HTML0 UNK2 4 Bid Price (RMB) 136369566.000 HTML0 UNK2 5 Third place: CCCC First Highway Engineering Co., Ltd. 0 HTML0 UNK2 6 Bid Price (RMB) UNK2 268.000HTML0 UNK2 7HYJA-4 Bid Section: 0 HTML0 UNK2 8 First Place: Anhui Communications Construction Co., Ltd. 0 HTML0 UNK2 9 Bid Price (RMB) 181115297.000 HTML0 UNK3 0 Second Place: Jiangxi Communications Engineering Group Co., Ltd. 0 HTML0UN K31 Bid Price (RMB) 181181000.000 HTML0 UNK3 2 Third Place: Handan Jinming Transportation Equipment Co., Ltd. 0 HTML0 UNK3 3 Bid Price (RMB) 181184982. 100 HTML0 UNK3 4 HYJA-5 Bid Section: 0 HTML0 UNK3 5 First Place: Lu'antong Zhike Technology Group Co., Ltd. 0 HTML0 UNK3 6 Bid Price (RMB) 143830831.90 HTML0 UNK3 7 Second Place: Guangdong Xinyue Transportation Investment Co., Ltd. 0 HTML0 UNK3 8 Bid Price (RMB) 144026648. 10 HTML0 UNK3 9 Third Place: China Railway Siju Group Installation Engineering Co., Ltd. Company 0 HTML0 UNK4 0 Bid Price (yuan) 1437894400 HTML0 UNK4 1

All can be viewed after purchase
Correlation

Construction overview of existing projects: The section from Wuhan West to Yichang of Shanghai-Chongqing Expressway starts from Wuhan West Hub, passes through Caidian District of Wuhan City, Hanchuan City, Xiantao City and Qianjiang City of Xiaogan City, Jingzhou District and Shashi District of Jingzhou City, Zhijiang City, Yiling District, Wujiagang District and Xiaoting District of Yichang City, and ends at Gaojiadian Hub Interchange of Wujiagang District of Yichang City (intersection of Shanghai-Chongqing Expressway and Ya Expressway). The mileage is about 265.7 kilometers, and the total mileage is about 271 kilometers after Gaojiadian Hub Interchange is connected to Yichang Toll Station. The highway is a two-way four-lane, fully enclosed expressway with cement concrete pavement.

2026-05-06 09:42:41

On May 6, 2026, Huang Linmu, Party Secretary and Chairman of Guoyuan Financial Holding Group, and Wei Lixiang, Deputy Party Secretary and General Manager, visited Conch Group. Conch Group Party Secretary and Chairman Yang Jun, Deputy Party Secretary and General Manager Zhu Shengli, and Deputy General Manager Ding Feng warmly received Huang Linmu and his delegation.