the lump-sum contract
project: The project site is located on the east side of the elevated Shiji East Road, Xuanwu District, Nanjing City, between the Beijing-Shanghai Railway and the Shanghai-Nanjing Intercity Railway, and to the west of Hongshan Road, with a total land area of about 31,200 square meters. In the preliminary design, the total building area of the houses to be built is controlled as 64,700 square meters, with one floor underground and six floors above ground, of which the above-ground building area is 51,200 square meters and the basement building area is 13,500 square meters. 240 parking spaces for motor vehicles. The project includes: building, structure, heating and ventilation, indoor and outdoor water supply and drainage, lighting, power, communication, information, as well as surrounding site layout, roads, fences and other related works within the planned red line. A new ramp bridge is built on the west side of the building to connect with the Century East Road viaduct, forming a "right-in and right-out" T-shaped intersection.
Project scope: the implementation scope of the Reply of China Railway Shanghai Bureau Group Co., Ltd. on the Preliminary Design of the Housing Reconstruction Project in the East Sandwich Area of Nanjing Railway Station (S.T.J.T.H. [2026] No.76).
This tender corresponds to the budget estimate preparation document. According to the Announcement of the State Railway Administration on the Issuance of Railway Engineering Cost Standards (No.30-33, 2017), the Announcement of the State Railway Administration on the Reduction of value-added tax Tax Rate of Railway Engineering Cost Standards (No.12, 2019), The Notice of the State Railway Administration on Increasing the Unit Price of Comprehensive Labor Cost during the Preparation Period of Railway Engineering Cost Standards (Guo Tie Ke Fa [2021] No.15) and relevant regulations. This tender involves the budget estimate of Chapter I Requisition and Demolition, Chapter III Bridge and Culvert, Chapter VII Electric Power and Electric Traction Power Supply, Chapter VIII Housing, Chapter IX Other Operation and Production Equipment and Buildings, Chapter XI Other Costs and other related chapters.
Planned construction period: The approved total construction period of this construction project is 22 months. The commencement date of this construction bidding plan is May 2026, and the completion date is March 2028.
Bid winning information:
First place: China Railway Construction Group Co., Ltd.
Bid evaluation price: 77237 RMB 0.0161 million
Second place: China Railway Construction Engineering Group Co., Ltd.
Bid evaluation price: 77237 RMB 10.57 million 0 HTML0 77242 0 No.3: China Railway No.4 Engineering Group Co., Ltd. 0 HTML0 UNK1 1 Bid evaluation price: RMB 772,423,205 0 HTML0 UNK1 2