Project Name: Housing Construction and Supporting Works
of China Automobile Hulunbuir Intelligent Network New Energy Vehicle All-season Ice and Snow Test Base Project Construction Location: Science and Technology Innovation Industrial Park of Yakeshi High-tech Industrial Development Zone, Hulunbuir (east side of Planning 4th Road, west side of Planning 11th Road, north side of Planning 13th Street,
Bidding scale: This project includes 1 new closed test chamber, 5 test workshops, 1 R & D office building, 5 auxiliary buildings and supporting projects, with a total construction area of about 17. The test chamber includes long straight line test area, ice and snow circle test area, VDC test area (the maximum single-span calculated span of steel structure is about 80m), ABS test area (the maximum calculated span of steel structure is about 60m); the test workshop includes 3 VIP workshops, 1 B1 workshop and 1 public workshop; Auxiliary rooms include one energy center (substation, water pump room, air compression station, Class C warehouse, refrigeration station, etc.), three guard rooms, three charging islands and one charging room; supporting works include but are not limited to site roads, public lighting, security monitoring, greening soil, signs and markings, sidewalks, water supply and drainage systems and various professional utility pipelines.
Project planned investment: 103904. The total construction area is about 510000 square meters, including square meters of 115211 above the ground for commercial residential buildings (including business allocation), square meters of underground 53804, square meters of 236544 above the ground for commercial and office use, square meters of 88643 underground, and square meters of 13188 for parks. The kindergarten is 2610 square meters. The old residential area and its surrounding renovation area are about 570000 square meters. The specific construction contents include infrastructure upgrading, street parks, industrial carriers, industrial communities, supporting public buildings, renovation and upgrading of old residential areas and surrounding areas, kindergartens, etc.
Construction site: No.146, Jintang Road, Hedong District, Tianjin (southeast side of the intersection of Jintang Road and Kunlun Road)
This bidding section is:
Bid Section I: Bid Section Name: Bid Section I Facade Project of Bid Section I of No.03 Urban Renewal Project of the First Machine Tool General Factory and Surrounding Areas Bidding Scope: Including but not limited to 3 , 4 , 5 , 6 , external wall waterproofing of ramp I, external eave thermal insulation coating, glass curtain wall, aluminum plate curtain wall, hanging plate curtain wall, aluminum grille, door head and canopy, door and window shutter, fence board, etc. The total curtain wall area of this bid section is 32169. 35 square meters, the curtain wall area of the largest single building project is 10706. 2 square meters, the height of the largest single curtain wall is about 23.35 meters, the span of the largest single curtain wall is 9 meters, the highest number of floors is 5, the investment of the thermal insulation project is 1.7881 million yuan, and the investment of the waterproof project is 141100 yuan. The curtain wall project investment is 3853. The construction scale of this section is 32169. 35 square meters. The estimated amount of this bid section is about 4046.
Bid Section II: Bid Section Name: Bid Section II of Facade Works of Bid Section I of No.03 Land of Urban Renewal Project of No.1 Machine Tool General Factory and Surrounding Areas: including but not limited to 1 , 2 , 10 , 11 , 12 , Ramp II, Ramp III, Staircase 1, Staircase 2/3, Staircase 5. Staircase 7/8 external wall waterproofing, external eaves insulation coating, glass curtain wall, aluminum curtain wall, hanging plate curtain wall, aluminum grille, door head and canopy, door and window shutter, balustrade, etc. The total curtain wall area of this bid section is 47326.93 square meters, the curtain wall area of the largest single building project is 18611.7 square meters, the height of the largest single curtain wall is about 87.3 meters, the span of the largest single curtain wall is 11 meters, the highest number of floors is 17, the investment of the thermal insulation project is 995,600 yuan, and the investment of the waterproof project is 334,300 yuan. The curtain wall project investment is 6838. The construction scale of this section is 47326. 93 square meters. The estimated amount of this bid section is about 6971.
The planned construction period is from May 15, 2026 to Bid winning information on September 30
, 2027:
Bid winner of bid section
I: China Construction Third Engineering Bureau Group Co., Ltd.
Bid offer (RMB): 432156928
Project name: Baoxing County National Park and Beautiful Home Construction site of EOD project
: Baoxing County, including Baoxing River Basin, Lingguan Area, Muping Town, Qiaoqi Town, Qiaoqi Lake, Ganyanggou Area, Longdongchang Town and Dengchigou.
Construction scale: This project includes three sub-projects. The first is the ecological environment comprehensive treatment project of Baoxing River Basin, which mainly includes river regulation, environmental improvement, ecological restoration, etc. The second is the construction and upgrading project of the ecological function area of Baoxing County: the main construction is the upgrading and transformation of Ganyanggou and Longdong Town areas, the transformation of Dengchigou area, and the improvement of the living environment. The third is the project of intensive development of ecological agriculture and extension of industrial chain: mainly to build standardized planting bases, build supporting equipment such as quality inspection and testing of agricultural products, and improve the corresponding infrastructure.
Planned construction period: 1080 calendar days (of which the design construction period is 180 calendar days. The construction period is 915 calendar days)
Bidding scope: (1) Design work: construction drawing design of the project and subsequent related services (on-site design services, design technical disclosure, design changes, intermediate acceptance, completion acceptance, etc.), EOD special video production and other design work to complete the construction of the project. (2) Construction general contracting work: including the construction of all engineering contents for the completion of the project construction, and the specific scope shall be subject to the construction drawings confirmed by the tenderee.
Total investment: 80721.
Bid winning information:
First place: China Construction Second Engineering Bureau Co., Ltd.
China Southwest Architectural Design and Research Institute Co., Ltd.
Sichuan University Engineering Design and Research Institute Co., Ltd. 0H TML0 UNK2 3 Sichuan Coalfield 141 Construction Investment Co., Ltd. 0 HTML0 UNK2 4 Bid price (RMB): 646180180.000 HTML0 UNK2 5 Second place: China Construction Sixth Engineering Bureau Co., Ltd. 0 HTML0 UNK2 6 China Southwest Municipal Engineering Design & Research Institute Co., Ltd. 0 HTML0UN K27 Henan Lingjie Water Conservancy Survey, Design and Research Co., Ltd. 0 HTML0 UNK2 8 Hebei Rendi Ecological Engineering Co., Ltd. 0 HTML0 UNK2 9 Bid Price (RMB): 658014736.000 HTML0 UNK3 0 Third Place: Zhejiang Dadongwu Group Construction Co., Ltd. 0 HTML0 UNK3 1 Sichuan Shushui Geological Ring Environmental Research Co., Ltd. 0 HTML0 UNK3 2 Guosheng Design Co., Ltd. 0 HTML0 UNK3 3 Bidding Price (RMB): 640713464. Outdoor stadium, road, greening, fence, gate, outdoor integrated pipeline and lighting works will be implemented simultaneously. 0 HTML0 UNK3 4 Investment Estimate: 50607. 0 HTML0 UNK3 5 Construction Scale: 75739. 68 Square meters 0 HTML 0 UNK3 6 Bid winning information: 0 HTML 0 UNK3 7 Bid winner: China Construction First Engineering Group Construction Development Co., Ltd. 0 HTML 0 UNK3 8 Bid price (RMB): 505265872.0 HTML 0 UNK3 9 Construction scale: total construction area is about 104814 square meters; The above-ground construction area is about 68309 square meters (including about 30976 square meters of skiing hall, about 11135 square meters of other sports buildings, about 4180 square meters of cultural buildings, about 5603 square meters of commercial buildings, about 12161 square meters of hotels, about 4043 square meters of vegetable markets, and 208 square meters of property service buildings). The underground construction area is about 36505 square meters; the total construction land area is about 57346 square meters; the maximum building height is 79.0 HTML0 UNK4 0 Construction site: Plot 03-03, Plot 03-04 and Plot 03-10 (1), East Unit, Xinteng Street, Ruian City, bounded by Wende Road in the east, Zhiluoli Road in the south, Xianghe Road in the west and Fuzhou East Road in the north. 0 HTML0 UNK4 1 Bidding scope: engineering design, engineering construction, procurement and installation of materials and equipment, completion acceptance, filing, handover, defect repair and warranty services within the defect liability period of the project, as well as management and control of quality, safety, progress, cost, contract and information of the project. Specifically include: (1) Engineering design scope: geotechnical investigation (detailed investigation), preliminary design deepening, engineering construction drawing design, technical services from the beginning to the completion of the project and during the defects liability period.The design contents include but are not limited to: plot plan design, architectural design, structural design (including steel structure), water supply and drainage design, electrical design (including high and low voltage power distribution), HVAC design, special works (curtain wall design, fine decoration design, weak current intelligent design, floodlighting design, seismic support, signs and signs, special lighting system in cold area, Special design of snow industry, etc.), outdoor engineering (integrated pipelines, municipal roads, landscape greening, lighting) and municipal supporting engineering (water supply, power supply, gas supply, communication network, etc.), fire protection design, energy-saving design, civil air defense design, foundation pit support design, sponge city, refrigeration design (including indoor ski hall refrigeration system, etc.). Refrigeration process) and other construction drawing design and detailed design of all design contents related to engineering construction. Except for the design contents (such as tap water, electricity, gas, digital TV wiring, etc.) with special requirements of the local industry authorities, the bid winner shall take the lead in coordinating the above special design and control the overall design. (2) Scope of project procurement: including the procurement, storage, installation, commissioning and handover of all materials and equipment of the project, as well as the warranty service during the warranty period. The equipment mainly includes but not limited to water supply and drainage equipment, fire fighting equipment, elevator equipment, refrigeration equipment, ropeway, magic carpet, etc. (3) Project construction scope: including but not limited to three supplies and one leveling, treatment of ground and underground obstacles, civil engineering [including earthwork, pile foundation, foundation pit support, curtain wall, steel structure, cold zone insulation board, civil air defense, fine decoration (including all decoration of ski hall, Decoration of public areas of hotels, vegetable markets, sports rooms, cultural rooms, commercial rooms and property services, decoration of basement elevator halls)], installation [water supply and drainage, electrical (including high and low voltage distribution), fire protection, HVAC engineering, intelligent engineering (including led screen of ski hall), elevators, seismic brackets, floodlighting engineering, photovoltaic engineering, special lighting system for cold areas, Skiing hall refrigeration snow-making system (including magic carpet, ropeway), charging pile], outdoor municipal landscape engineering (municipal supporting, 5G signal coverage, integrated pipeline, road, landscape, fence and gate, sponge city, etc.), traffic and civil air defense signs and markings, integrated pipeline network (including water supply and drainage pipeline, communication pipeline, power pipeline) connected to the red line outside the red line. (4) Service scope of general contracting management: general contracting management shall be implemented in accordance with the requirements of Code for Management of General Contracting of Construction Projects (GB/T50358-2017). (5) Site preparation and temporary facilities: the site shall be delivered according to the status quo. The Contractor shall be responsible for site leveling, temporary enclosure, site temporary facilities, site drainage, temporary water supply, temporary power supply, temporary roads (including temporary bridges) and road openings, laying of rainwater and sewage pipes from outside the red line to the connection point, rainwater and sewage discharge, etc., and shall bear the corresponding handling and construction costs. (6) Other service contents: including the management coordination and cooperation of all aspects of the project, the handling of formalities in the early and late stages (application for approval and construction), the sorting and filing of project-related data, acceptance, filing and handover related work contents (including project completion acceptance, special acceptance, project handover, settlement and approval, as-built drawing preparation, urban construction filing of completion data, project completion filing, etc.); Project insurance; warranty service during the warranty period; management and control of project quality, safety, progress, cost, contract, information, etc.
The bidding control price is 75182.
The planned construction period is 880 calendar days, of which the construction permit (construction content: foundation pit enclosure) must be completed within 60 calendar days from the next day of the contract signing.