Guangdong Maoming Port Bohe New Port Area Yudean Coal Terminal Port Area Railway Project Construction Lump Sum Contract
Project Overview: The newly-built Guangdong Maoming Port Bohe New Port Area Yudean Coal Terminal Port Area Railway Project is located in Binhai New Area of Maoming City, and the project is led out from K1 + 997.88 of Maoming Port Special Railway Line Project. After Connection, the railway will run 682 m to the loading station of Yuedian Port Area, and run 300 m in parallel with the existing railway (the subgrade of the parallel sections will be reinforced with 8047 linear meters of high-pressure jet grouting piles, and the other sections will be reinforced with 46181 linear meters of cement mixing piles). The total length of the railway is 1.78 km, and the newly laid track is 3.37 km. 1 new 4.0m (H) * 2.8m (W) * 14.49m (L) flood discharge culvert, 1 new 2.5m (H) * 2.5m (W) * 11.0m (L) pipe protection culvert, Two shunting tracks (with effective length of 450m), two loading and unloading tracks (with effective length of 450m), one running track (with effective length of 50m) and one safety track (with effective length of 50m) are set. The subgrade earthwork is about 31,000 m, and the building area is 175.
Bid section division: this time it is divided into one bid section.
Construction period: The construction period is 180 days, the planned commencement date is May 18, 2026, and the planned completion date is November 13, 2026. The 10849 of the static investment in the railway project at the port area of Yudean Coal Terminal, Bohe New Port Area, Maoming Port
, Guangdong is RMB. 9800 yuan; The maximum bidding price for construction is 64.174385 million yuan (excluding the cost of materials supplied by Party A). Among them, the safety production fee is 591,928 yuan, General contracting risk fee 94.
Bid winning information
First place: China Railway No.6 Engineering Group Co., Ltd.
Bid quotation: RMB
63,147,595 Second place: (host) China Railway 15th Engineering Group Co., Ltd.
(member) China Railway 15th Engineering Group Co., Ltd. Bidding price of Shanghai New Energy Development Co.,
Ltd. of China Railway Group: 635138883 yuan
Third place: (host) China Railway Siju Group Co., Ltd.
(member) China Railway Siju Group Electrification Engineering Co., Ltd.
Bidding price: 6315 The total length of the line is 93.857 kilometers, including 84.227 kilometers of the new main line, 6.022 kilometers of the existing Nanchong East Link Line of Lanzhou-Chongqing Railway across the Jialing River, and 3 kilometers of the existing Hanbanan Railway from Nanchong North Station to Qiangjiawan Station (including). Utilizing one station of Nanchong North Station, utilizing and rebuilding two stations of Yuechi Station and Guang'an South Station, and connecting with one station of Guang'an East Station of Xiyu high-speed rail under construction.
Construction site: Guang'an City, Sichuan Province.
Planned construction period: 900 calendar days.
Bid winning information
First place: China Railway Eryuan Engineering Group Co., Ltd
. Guang'an Transportation Investment and Construction Development Group Co., Ltd.
China Railway First Engineering Group Electrical Engineering Co., Ltd.
China Railway First Engineering Group Co., Ltd. 0 HTML0 UNK2 1 Tender offer: 432781261 However, as the line passes through the mountainous area of Yunnan-Guizhou Plateau, some sections of the line face the threat of geological disasters such as rockfall and landslide all the year round, which seriously affects traffic safety. In order to tighten the "safety fence" for the Nanning-Kunming Railway and ensure the operation of the railway and the safety of people's lives and property along the line, this tender plans to build new shed tunnels in several sections of the Nanning-Kunming Railway to provide a "safety umbrella" for train operation. 0 HTML0 UNK2 2 The scope of this tender covers the new shed tunnel project of 9 sections of Nanning-Kunming Railway, with a total length of about 863.0 HTML0 UNK2 3. The planned construction period is 183 calendar days, starting from May 1, 2026, and is expected to be completed on October 30, 2026. At that time, the new shed will form a complete safety barrier with the original protective facilities, so that the passing trains and residents along the line will feel more at ease. 0 HTML0 UNK2 4 Bid winning information 0 HTML0 UNK2 5 NKPDSG-2026-1 bid section: 0 HTML0 UNK2 6 First place: China Railway 19th Bureau Group Co., Ltd. 0 HTML0 UNK2 7 Bid price: 50040989; 0 HTML0 UNK2 8 Second place: China Railway Wuju Group Co., Ltd. 0 HTML0 UNK2 9 Bid price: 50041192; 0 HTML0 UNK3 0 No.3: China Railway No.3 Engineering Group Co., Ltd. 0 HTML0 UNK3 1 Bid Price: 50041666 0 HTML0 UNK3 2NKPDSG-2026-2 Bid Section: 0 HTML0 UNK3 3 First place: China Railway No.4 Engineering Group Co., Ltd. 0 HTML0 UNK3 4 Bid price: 26165692 yuan; 0 HTML0 UNK3 5 Second place: China Railway No.5 Engineering Group Co., Ltd. 0 HTML0 UNK3 6 Bid price: 26166629 yuan; 0 HTML0 UNK3 7 Third Place: China Railway No.3 Engineering Group Co., Ltd. 0 HTML0 UNK3 8 Bid Price: 26165066 0 HTML0 UNK3 9NKPDSG-2026-3 Bid Section: 0 HTML0 UNK4 0 First place: China Railway Tenth Engineering Group Co., Ltd. 0 HTML0 UNK4 1 Bid price: 25363778; 0 HTML0 UNK4 2 Second place: China Railway Wuju Group Co., Ltd. 0 HTML0 UNK4 3 Bid price: 25564960 0 HTML0 UNK4 4 Third place: China Railway Sanju Group Co., Ltd. 0 HTML0 UNK4 5 Bid price: 25562888 0 HTML0 UNK4 6NKPDSG-20 26-4 Bid Section: 0 HTML0 UNK4 7 First place: China Railway Erju Group Co., Ltd. 0 HTML0 UNK4 8 The evaluated quotation is 59063434 0 HTML0 UNK4 9 Baotou-Shenshuo Railway Traction Power Supply, Announcement of Successful Candidates for 7 Bid Sections of General Contracting Project of Electric Power Technical Renovation 0 HTML0 UNK5 0 Project Name: General Contracting Project of Traction Power Supply and Electric Power Technical Renovation Project of Shenshuo Line of Baotou-Shenshuo Railway Company in 2025 0 HTML0 UNK5 1 Line Scope: K0 + 470 ~ K265 + 278 Section of Shenshuo Railway. The total length of the main line is 266 kilometers, spanning seven counties in Shaanxi Province and Shanxi Province. 0 HTML 0 UNK5 2 Construction content: technical upgrading and transformation of the traction power supply system and power facilities and equipment of the whole line, including the renewal of catenary equipment, the transformation of 25 traction stations, the upgrading of 10 power transformation and distribution stations, the laying of 10 kV overhead lines and high and low voltage cables. Intelligent dispatching telecontrol system, auxiliary monitoring system, power supply information management system, power intelligent operation and maintenance platform and other intelligent supporting projects will be built synchronously. 0 HTML0 UNK5 3 Bid Section Division: This tender is divided into 7 bid sections, including 2 OCS projects, 2 traction substation projects, 1 power distribution project and 2 power line projects. 0HTML0 UNK5 4 Bid winning information 0HTML0 UNK5 51 Bid OCS Engineering 0 HTML 0 UNK5 6 First Place: Electricity Engineering Co., Ltd. of China Railway Wuju Group 0 HTML 0 UNK5 7 Bid Price: 32317 RMB 0.95 million 0 HTML 0 UNK5 8 Second Place: First Engineering Co., Ltd. of China Railway Electrification Bureau Group 0 HTML 0 UNK5 9 Bid Price: 32336 RMB 0.82 million 0HTML0UNK60 Third place: Electricity Engineering Co., Ltd. of China Railway No.3 Engineering Group 0HTML0UNK61 Bid price: 32352 RMB 0.16 thousand 0HTML0UNK6 OCS Engineering 0 HTML0UNK63 First place: Electricity Engineering Co., Ltd. of China Railway Erju Group 0 HTML0UNK64 Bid price: 36826 RMB 0.07 million 0 HTML0UNK65 Second place: China Railway Construction Electrification Bureau Group Co., Ltd. 0 HTML0UNK66 Bid price: 36843 RMB 0.55 million 0 HTM L0UNK67 Third place: China Railway Wuhan Electrification Bureau Group Co., Ltd. 0HTML0UNK68 Bid price: 36861: RMB 0.28 million 0HTML0UNK693 Traction Substation Project 0 HTML 0UNK70 First place: China Railway Wuhan Electrification Bureau Group Co., Ltd. 0 HTML 0UNK71 Bid price: 34069 RMB 0.74 million 0 HTML 0UNK72 Second place: China Railway 12th Bureau Group Electrification Engineering Co., Ltd. 0 HTML 0UNK73 Bid price: 34086 RMB 0.92 million 0H TML0UNK74 Third place: China Railway Electrification Bureau Group Co., Ltd. 0 HTML0UNK75 Bid price: 34103: RMB 6,500 0 HTML0UNK764 Traction Substation Project 0 HTML 0UNK77 First place: Electrification Engineering Co., Ltd. of China Railway 12th Bureau Group 0 HTML 0UNK78 Bid price: 25789 RMB 0.79 million 0 HTML 0UNK79 Second place: Electricity Engineering Co., Ltd. of China Railway Wuju Group 0 HTML 0UNK80 Bid price: 25804 RMB 0.36 million 0 HTML0UNK81 Third place: Electricity Engineering Co., Ltd. of China Railway No.3 Engineering Group Co., Ltd. 0 HTML0UNK82 Bid price: 25820: RMB 5,800 0 HTML0UNK835 Power Distribution Project 0 HTML0UNK84 First Place: China Railway Signal & Communication Shanghai Engineering Bureau Group Co., Ltd. 0 HTML0UNK85 Bid Price: 18004 RMB 6,200 0 HTML0UNK86 Second Place: China Railway 24th Bureau Group Shanghai Dian Wu Dian Hua Co., Ltd. 0 HTML0UNK87 Bid Price: 18018 0.35 million yuan 0 HTML0UNK88 Third place: First Engineering Co., Ltd. of CRSC Construction Group 0 HTML0UNK89 Bid price: 18033 0.79 million yuan 0 HTML0UNK90 Bid Power line engineering 0 HTML 0UNK91 First place: China Railway 24th Bureau Group Shanghai Electric and Power Engineering Co., Ltd. 0 HTML 0UNK92 Bid price: 14740 RMB 0.65 million 0 HTML 0UNK93 Second place: China Railway Construction Electrification Bureau Group Co., Ltd. 0 HTML 0UNK94 Bid price: 14754 RMB 0.92 million 0HTML0UNK95 Third place: Electricity Engineering Co., Ltd. of China Railway Erju Group 0HTML0UNK96 Bid price: 14770 RMB 0.38 million 0HTML0UNK977 Power Line Project 0 HTML 0 UNK98 First place: China Railway Construction Electrification Bureau Group Co., Ltd. 0 HTML 0 UNK99 Bid Price: 18519.
Second place: China Railway Electrification Bureau Group Co., Ltd.
Tender offer: 18535: 66,600 yuan
Third place: China Railway Wuhan Electrification Bureau Group Co., Ltd.
Tender offer: 18550.
Construction scale: new Construction of Jinchang South Station of Wuwei-Zhangye Section of Lanzhou-Zhangye Third and Fourth Line Railway 7997.
Bidding scope: Construction of Jinchang South Station of Wuwei-Zhangye Section of Lanzhou-Zhangye Third and Fourth Line Railway 7997. Bid section division: According to the characteristics of the project, in order to arrange and organize the implementation reasonably, this construction bidding is divided into one bid section.
Planned construction period: 585 calendar days, planned commencement date: May 20, 2026, planned completion date: December 25, 2027.