On April 30, Xinjiang Baoxin Jinyi East District 300 MW/1.2G Wh Independent Energy Storage Project EPC Tender Announcement was issued, and the tenderer was Baoxin Jinyi New Energy (Urumqi) Co., Ltd. The source of the
project fund is self-raised fund of 1.2 billion yuan, equivalent to unit price of 1 yuan/Wh. It is planned to build a new 300 MW/1.2G Wh independent energy storage power station, with an energy storage power of 300,000 kilowatts, an energy storage time of 4 hours, and 48 sets of energy storage system units. The scheme of lithium iron phosphate battery energy storage system is adopted, and the prefabricated cabin type integrated installation is adopted. Auxiliary facilities room, power distribution room, fire pump room and other ancillary works shall be constructed.
The project requires the bidder to undertake at least one energy storage power station project design or construction or general contracting performance in the past five years. It is enough to accept the consortium bidding and meet the relevant requirements. The time of submission and opening of tender
documents is 11:00 on May 25, 2026.

浙公网安备33010802003254号