Project Name: Dongbaitaling Resettlement Housing (Phase I and Phase II) Project EPC
Project Overview:
1. Dongbaitaling Urban Village Reconstruction Project Phase I
Location: north of Hebei Avenue, east of Jingwen Road and south of Wenti Road.
Scale: The main construction contents are residence and supporting facilities. The total construction area is 315955 square meters, of which the above-ground construction area is 235793 square meters, including 230011 square meters of residential buildings and 5782 square meters of public buildings; the underground construction area is 80162 square meters, including 21164 square meters of residential basement and 58998 square meters of underground garage. Supporting facilities include municipal pipe network infrastructure (water supply system, power supply system, heating system, drainage system, gas system, communication and cable TV system), security and boundary infrastructure (fence, gate, monitoring system, access control and building intercom system, etc.), traffic and parking infrastructure (road system, parking facilities, etc.), Greening and environmental infrastructure (greening system, environmental cleaning facilities, etc.) And barrier-free facilities.
2. Location of Phase II
of Dongbaitaling Urban Village Reconstruction Project: north of Hebei Avenue, east of Jingwen Road and south of Wenti Road.
Scale: Commercial buildings and supporting facilities are mainly constructed. The total construction area is 53505 square meters, of which the above-ground construction area is 40270 square meters, including 39418 square meters of commercial buildings and 852 square meters of other supporting facilities; the underground construction area is 13235 square meters (garage). Supporting facilities include municipal pipe network infrastructure (water supply system, power supply system, heating system, drainage system, communication and cable TV system), security and boundary infrastructure (fence, gate, monitoring system, access control and building intercom system, etc.), traffic and parking infrastructure (road system, parking facilities, etc.), greening and environmental infrastructure (greening system, etc.). Environmental cleaning facilities) and barrier-free facilities, etc.
The total construction period is 1,110 calendar days, of which the design period is 45 calendar days and the construction period is 1,065 calendar days; the planned commencement and completion dates are May 25, 2026 and June 8, 2029, respectively.
Bidding scope: design, construction, material procurement and installation, commissioning and overall handover of qualified completion acceptance, defect repair and warranty within the warranty period of the project, until all the work included in the project design and construction is completed.
Bid winning information:
First place: CCCC First Harbor Engineering Co., Ltd.
China Construction First Engineering Group Construction Development Co., Ltd.
China Academy of Building Research Co., Ltd.
Total bid price: 1403506 RMB 992
Second place: CTMCC Total
bid price: RMB
1404682500 Third place: Consortium
of COSCO Yatai Design Co., Ltd. of Guangxi Construction Engineering Group No.4 Construction Engineering Co., Ltd. 0 HTML0 1403123155 9 Total bid price: 1403123155 yuan 0 HTML0 UNK2 0 Project name: 2026 General National and Provincial Highway Pavement Repair and Maintenance Project 0 HTML0 UNK2 1 Project overview: This project involves 11 cities, with a total mileage of 588.922 kilometers, of which 132.429 kilometers are first-class highways. Class II highway is 385.597 kilometers, Class III highway is 45.621 kilometers, Class IV highway is 25.275 kilometers, functional rehabilitation is 271.051 kilometers, structural rehabilitation is 317.871 kilometers, of which: 0 HTML 0 UNK2 2 (1) There are 3 rehabilitation and maintenance projects of ordinary national and provincial highways in Taiyuan. The total length of treatment is 16.396 kilometers of functional rehabilitation, including: S103 (10.2 kilometers), S215 (2.13 kilometers), S217 (4.0 HTML0 UNK2 3 (2) There is one general national and provincial highway pavement rehabilitation maintenance project in Datong, and the total length of treatment is 60.28.823 kilometers of functional rehabilitation. Including: G512 (28.823km); 31.873km of structural rehabilitation, including: G512 (31.0 HTML0 UNK2 4 (3) 4 repair and maintenance projects of general national and provincial highway pavement in Shuozhou, with a total treatment mileage of 31.1km of functional rehabilitation, including: S205 (1km); 30.427km of structural rehabilitation, including: S303 (15.678km), G336 (11.0 HTML0 UNK2 5 (4) There are 5 rehabilitation and maintenance projects of general national and provincial roads in Xinzhou, with a total treatment mileage of 95.560km of functional rehabilitation. Including: S312 (50.634km), G208 (3.562km), G241 (1.854km); Structural rehabilitation of 39.442km, including: S312 (25.784km), G336 (3.209km), G239 (6.038km), G241 (4.0 HTML0 UNK2 6 (5) 3 general national and provincial highway pavement rehabilitation maintenance projects in Lvliang. The treatment mileage is 72.17.867 km, including S218 (14.27 km), G307 (0.597 km) and G339 (3 km); Structural rehabilitation of 54.597 km, including: S218 (17.5 km), G307 (31.797 km), G339 (5.0 HTML0 UNK2 7 (6) 4 general national and provincial highway pavement rehabilitation maintenance projects in Jinzhong, with a total treatment mileage of 43.39.57 Among them: G108 (19.332km), S216 (11.938km), S221 (5km), S320 (3.0 HTML0 UNK2 8 (7) There is one general national and provincial highway pavement repair and maintenance project in Yangquan, with a total treatment mileage of 15.675 km. Among them: S314 (15.0 HTML0 UNK2 9 (8) There are 9 repair and maintenance projects of general national and provincial highway pavement in Changzhi. The total treatment mileage is 61.33.763 km of functional restoration. S228 (2 km), G207 (0.8 km), G341 (4.236 km), S220 (4.615 km), S225 (6.045 km), S227 (5.556 km), S324 (1.69 km), S325 (8.821 km); 27.438 kilometers of structural restoration, Among them: S228 (3.117km), G207 (3.429km), S220 (1.157km), S225 (2.099km), S324 (3.97km), S326 (13.0 HTML0 UNK3 0 (9) There are 3 general national and provincial highway pavement repair and maintenance projects in Jincheng. The total treatment mileage is 41. Functional repair is 33.099 km, including G342 (21.393 km), S331 (2.706 km), S333/T333 (9 km); Structural repair is 8.097 km, including 8 repair and maintenance projects of G342 (3.0 HTML0 UNK3 1 (10) general national and provincial highway pavement in Linfen. The treatment mileage is 87.21.391 km, including S342 (2 km), S248 (4 km), S326 (3.3 km), S236 (0.843 km), S331 (1.6 km) and S330 (9.648 km); 66.292 kilometers of structural restoration, Of which: S330 (22.781 km), S342 (18 km), S248 (8.4 km), S326 (1.28 km), S224 (7.969 km), S236 (2 km), S331 (1.705 km), S235 (4.0 HTML0 UNK3 2 (11) There are 6 repair and maintenance projects for general national and provincial highway pavement in Yuncheng, with a total treatment mileage of 63. Functional repair of 7.417 km, including: G521 (0.92 km), S232 (2.497 km), G342 (4 km); Structural rehabilitation of 55.705km, including G521 (10.414km), G237 (6km), S232 (12.979km), S233 (4km), G342 (9.99km), S235 (12.0 HTML0 UNK3 3 Planned construction period: 100 calendar days.
Bid winning information:
First place: CCCC Infrastructure Maintenance Group Co., Ltd. (Leader)
Shanxi Communications New Technology Development Co., Ltd. (Member of the consortium)
Yangquan Taijiu Bote Road Maintenance Engineering Co., Ltd. (Member of the consortium) 0 HTML0UN K4 Shanxi Jinlu Tongda Engineering Construction Co., Ltd. (Member of the consortium) 0 HTML0 UNK5 Shanxi Construction Engineering Group Co., Ltd. (Member of the consortium) 0 HTML0 UNK6 Bid price (RMB): 9689473120 HTML0 UNK7 Second place: CCCC Road & Bridge Construction Co., Ltd. 0 HTML0 UNK8 Bid price (RMB) : 9732524390 HTML0 UNK9 No.3: Anhui Traffic Control Engineering Group Co., Ltd. 0 HTML0 UNK1 0 Bid Price (RMB): 9744265640 HTML0 UNK1 1 Project Name: Shijiazhuang Meiyu Digital Culture Industrial Park Project Construction Secondary 0 HTML0 UNK1 2 The total investment of this project is 1053 248,100 yuan, of which the estimated price of the construction and installation works is 70940.0 HTML0 UNK1 3 Construction Scale: The total planned land area of the project is 28443.161 ㎡ (42.663 mu), and the total construction area is 167201.83 ㎡. Underground 4939 2. Newly built: Library, Cultural Center, Wenchuang Service Building (height 138.0 HTML0 49392 4. Scope and content of this tender and description of project characteristics: all contents within the scope of construction drawings and bill of quantities (excluding earthwork excavation and outward transportation). 0 HTML0 70940 5 Maximum bidding price limit UNK1. 0 HTML0 UNK1 6 Bid winning information: 0 HTML0 UNK1 7 Bid winner: CCCC Construction Group Co., Ltd. 0 HTML0 UNK1 8 Bid price (RMB): 670385977. The project starts from Tanxia Village, Hecheng Street, Qingtian County. With the construction of 330 National Highway Qingtian Wenxi to Chuanliao section of the project cross-set T-type interchange connection, starting pile number K0 + 000, the route to the south of Dongbaoshan Bridge across the Oujiang River, through Hecheng Street, Ounan Street, Zhangdan Township, Fushan Township, using the existing Beishan Bridge across the Qianxia Lake Reservoir to Beishan Town, the end point is located in Qingtian County and Jingning County. It is connected with the planned and proposed Jingning Section of 638 National Highway, the route end stake number is K46 + 857.695, and the total length of the project route is about 46. The whole line is provided with 54 bridges of about 12280 meters, including 1 extra-large bridge of about 1767 meters, 34 large bridges of about 9053 meters, and 19 medium bridges of about 1460 meters; About 18664 meters/16.5 tunnels are set up, of which the long tunnel is about 14462 meters/6.0 HTML0 UNK1 9. The total approved estimated investment is about 5.456 billion yuan. The cost of construction and installation works is about 43.0 HTML0 UNK2 0 Technical standard: the section from the starting point of the project to Zhangdan (the starting and ending stake numbers are K0 + 000 ~ K9 + 587) is about 9.6 kilometers long, which adopts the standard of two-way four-lane first-class highway in the Technical Standard of Highway Engineering (JTG B01-2014), and the design speed is 80 kilometers/hour. The subgrade width is 21.5 meters, the net width of the tunnel (single hole) is 10.0 HTML0, and the length of the section from Zhangdan to the end of the project (starting and ending pile number K9 + 587 ~ K46 + 857.695) is about 37.2 kilometers, which adopts the two-way two-lane second-class highway standard in the Technical Standard for Highway Engineering (JTGB01-2014). The design speed is 60 km/H and the roadbed width is 10.0 meters, of which the full width of the bridge from Zhangdan to Fushan is 10.75 meters, the net width of the tunnel is 10.25 meters, and the full width of the bridge from Fushan to the end of the project is 9. The pavement design load is BZZ-100, the design flood frequency is 1/100 for large and medium bridges, and 1/50 for small bridges, culverts and roadbeds. Other technical indicators shall be implemented in accordance with the current relevant industry standards and specifications, and meet the relevant provisions of the Compulsory Provisions of Engineering Construction Standards (Highway Engineering) of the People's Republic of China. 0 HTML0 UNK2 2 Bidding scope and bid section division: 0 HTML0 UNK2 3 This bidding is for the construction of Qingtian Hecheng to Beishan Section of 638 National Highway, and the bid section number is SG02. 1 HTML0 UNK2 4 SG02 bid section: the starting and ending chainage of the main line is K9 + 560 ~ K22 + 400, and the total length of the line is about 12.840 kilometers (including K19 + 802.023 = K19 + 800 long chain: 2. The estimated construction and installation cost corresponding to the bid section is about 6. The specific implementation content is subject to the construction drawings and the bill of quantities. 0 HTML0 UNK2 5 Main structures include: 6 newly-built bridges of 857.75m, including 4 large bridges of 755.67m (of which the Kengkou Reservoir Bridge is 307.55m long), Zhongqiao 102.0 HTML0 UNK2 6 Construction period: 36 months (1095 calendar days) 0 HTML0 UNK2 7 Bid winning information: 0 HTML0 UNK2 8 Bid winner: CCCC Tunnel Engineering Co., Ltd. 0 HTML0 UNK2 9 Bid price (RMB): 511,446, 795.000 HTML0 UNK3 0 Project Name: Xiamen Third East Passage Pavement Project (Construction) 0 HTML0 UNK3 1 Construction Location: Xiamen City, Fujian Province 0 HTML0 UNK3 2 Project Scale: Xiamen Third East Passage Project starts near the Fragrant Hill Yacht Club in Siming District, Xiamen Island. The main line runs northward to the vicinity of Guanyin Mountain along Huandao Road by tunnel, then crosses the eastern sea area of the island by bridge eastward, and ends with an interchange to connect to the new Xiangan Airport. The Xiangan Branch Line is constructed synchronously, with a total length of about 19.615 km, of which the main line is about 17.340 km long and the Xiangan Branch Line is about 2. The expressway standard is adopted, and the main line of the cross-sea section has eight lanes in both directions. The design speed of the main line of the cross-sea section is 100km/H, and the design speed of the land connection and Xiang'an branch line is 80km/H. There are 4 interchanges and 2 toll stations along the whole line. 0 HTML0 UNK3 The construction contents of Bid 3A6 include: the section from K8 + 389 to K18 + 559 of the main line, covering the steel box girder, the toll Plaza bridge and the pavement works within the scope of Dadeng Interchange. The main construction contents include 338,000 square meters of steel deck pouring asphalt pavement and ordinary asphalt pavement. 11. The construction and installation cost of this bid section is about 10,000 yuan 49539. The specific work content, quantity and requirements shall be subject to the construction drawings, bill of quantities and contract documents. 0 HTML0 UNK3 4A7 The construction contents include: the pavement, traffic safety facilities and greening works within the scope of the main line K1 + 109 to K8 + 389, Xiang'an Branch Line, Tapu Road Branch Line, Fragrant Hill Interchange and Guanyinshan Interchange. The main construction contents include 159,000 square meters of pouring asphalt pavement and 55 square meters of ordinary asphalt pavement. The construction and installation cost of this bid section is about 596.77 million yuan. All project contents, specifications and quantities are subject to the construction drawings, bill of quantities and contract documents. 0 HTML0 UNK3 5 Bid winning information: 0 HTML0 UNK3 6A6 bid section 0 HTML0 UNK3 7 Bid winner: China Merchants Zhixiang Road Technology (Chongqing) Co., Ltd. 0 HTML0 UNK3 8 China Communications Road & Bridge Construction Co., Ltd. 0 HTML0 UNK3 9 Bid price: 391561588
0 A. 7 Bid Section 0 HTML0 UNK4 1 Bid Winner: CCCC Second Harbor Engineering Co., Ltd. 0 HTML0 UNK4 2 CCCC First Highway Engineering Group Co., Ltd. 0 HTML0 UNK4 3 Bid Price: 441529006 yuan 0 HTML0 UNK4 4 Project Name: Century Road (Middle) Rapid Engineering Construction 0 HTML0 UNK4 5 Project Overview: Shiji Road (Middle) Expressway Project starts from the east side of Yantongshan Tunnel in the west and ends at the west side of Dajianfeng Tunnel in the east. The existing road is used for connection. The total length of the road is about 9. The project adopts the standard of urban trunk road. The design speed of the main line is 60 km/H, and the design speed of the auxiliary road is 40 km/H. The subgrade section has six or eight lanes in both directions. The main line of the tunnel section is double 6 + the auxiliary road is double 4. The width of the design red line is 39 meters to 83 meters. 238924 of the total investment of the project. 0 HTML0 UNK4 6 Bid Section 1: The budget amount of the bidding part is 308016524. The construction scope is from the east side of Yantongshan Tunnel to Gangxiang Tunnel. The specific construction scope and content shall be subject to the construction drawings.
Bid Section II: The budget amount of the bidding part is 77244106 2. The construction scope is from Gangxiang Tunnel to the west side of Dajianfeng Tunnel. The specific construction scope and content are subject to the construction drawings.
It mainly includes road engineering, bridge engineering, tunnel engineering, drainage engineering, lighting engineering, traffic engineering, greening landscape engineering, comprehensive pipeline, sponge city, special safety protection project for parallel intersection of highway and railway, river regulation, railway slope engineering, and special relocation project for inter-city railway pipeline. The details shall be subject to the construction drawings, intermediary budget and relevant data provided by the Tenderee.