News List

"There are not many bright spots." This is the first impression of Chen Gang, chairman of Aixu, on this year's SNEC exhibition.

2026-06-08

On June 5, Ningxia Lingwu Huaxin Integrated Energy Services Co., Ltd. issued a tender announcement for EPC general contracting of Lingwu 1 GW/4 GWh centralized shared energy storage project.

2026-06-08

In the railway construction projects within the jurisdiction of Shenyang Railway, the Eighth Bureau of China Construction was fined 1.1559 million yuan for failing to comply with the engineering design drawings and construction technical standards.

2026-06-08

Since June 7, some leading manufacturers in Jiangxi have again notified an increase in cement prices by 20 yuan/ton.

2026-06-08

Digital New Energy DataBM. Com learned that on June 4, Inner Mongolia Electric Power Co., Ltd. of the State Energy Group issued a statement on the development of new energy projects by counterfeit companies.

2026-06-08

Nantong Juye Commodity Concrete Co., Ltd. was filed for bankruptcy; Shaanxi Mingxu Concrete Co., Ltd. was filed for bankruptcy; Meizhou Zhengtong Concrete Co., Ltd. was filed for bankruptcy; and Shixing Shenguangxing Concrete Co., Ltd. was filed for bankruptcy.

2026-06-08

With effect from 9 June 2026: Mr. Wu Junxian has resigned as the Chief Executive Officer of the Company; Mr. Tang Yingjie has been appointed as the Chief Executive Officer of the Company.

2026-06-08

The target of this transfer is the capacity index of 2000 tons/day (600000 tons/year) cement clinker production line held by Xinping Yingzhou Cement Co., Ltd.

2026-06-08

On June 7, Xinzhuobang announced that it had signed the Electrolyte Cooperation Agreement with Ningde Times, the leading power battery company, which stipulated the amount of electrolyte purchased by Ningde Times from Xinzhuobang in the next three years, with a cooperation period from 2026 to 2028.

2026-06-08

Last week, the average price of N-type polycrystalline silicon dense materials was 33400 yuan/ton, down 0.89% on a month-on-month basis and 10.93% on a year-on-year basis; the average price of N-type granular silicon was 34000 yuan/ton, down 0.87% on a month-on-month basis and 1.45% on a year-on-year basis, and the price of mainstream silicon materials continued to decline.

2026-06-08

Recently, Shao Jun, Chairman of China Cement Network, and his delegation visited Henan Building Materials Industry Association and were warmly welcomed by Wang Aizhen, Vice President of the Association. The two sides had in-depth exchanges on the development situation and policy recommendations of Henan cement industry.

2026-06-08

On June 6, Gansu Gulang Longdian Entering Zhejiang Huanghuatan 2 million kilowatt photovoltaic project EPC II and III bid section winning candidates were announced, and the project tenderer was Gansu Gulang Longdian Entering Zhejiang Huanghuatan Energy Co., Ltd.

2026-06-08

Recently, Shao Jun, Chairman of China Cement Network, and his delegation visited Chunjiang Cement and were warmly welcomed by Zhang Hongmei, Chairman of Chunjiang Group Co., Ltd. and General Manager of Weihui Chunjiang Cement Co., Ltd. The two sides had in-depth exchanges on the development situation and coping strategies of the cement industry.

2026-06-08

Due to the transmission of cement price increase in Changsha-Zhuzhou-Xiangtan, Hunan and other places in the periphery, some leading manufacturers in western Jiangxi again notified an increase of 20 yuan/ton in cement price since June 7.

2026-06-08

Two cement enterprises in Fengrun District of Tangshan, Hebei Province, were successively fined for dust pollution, with a total fine of 50000 yuan.

2026-06-08

On June 6, Gansu Gulang Longdian entered Zhejiang Huanghuatan 2 million kilowatt photovoltaic project general contracting (EPC) II and III bid section winning candidates were announced.

2026-06-08

On June 3, the Ningxia Lingwu Examination and Approval Service Administration issued a public announcement on the acceptance of the environmental impact report form for the 500000 kilowatt photovoltaic composite project in Lingwu City, Central.

2026-06-08

The total installed capacity of the supporting power supply base is 14.64 million kilowatts, including 8 million kilowatts of photovoltaic power, 4 million kilowatts of wind power and 2.64 million kilowatts of regulated coal-fired power, with a total investment of about 64.2 billion yuan.

2026-06-08

On June 4, Inner Mongolia Electric Power Co., Ltd. of the State Energy Group issued the Statement on the Development of New Energy Projects by Counterfeit Companies. The statement said that recently, illegal elements used the company's name and personnel identity to release project cooperation, docking and bidding information, involving related projects such as the 1G W wind power project in Anyu Township, Gan'an County, Songyuan City, Jilin Province, and the 1.5g W photovoltaic power generation project in Urat Houqi.

2026-06-08

 1 2 3 4 5 6 ...  1249