News List

The repurchase price of the Shares shall not exceed RMB27.71 per share (inclusive), and the repurchase amount shall not be less than RMB600 million (inclusive) and shall not exceed RMB1 billion (inclusive). The total amount of capital for repurchase of H shares shall not exceed HK $700 million (inclusive).

2026-05-27

It will focus on four key tasks, namely, spot checking a number of business entities in areas where "involution" competition is prone to occur, punishing a number of business entities with "involution" competition violations and dishonesty, exposing a number of typical cases of "involution" competition violations and dishonesty, and forming a number of achievements in the construction of institutional mechanisms.

2026-05-27

EPC of new energy and new materials manufacturing and production base of land port hub | CCCC Second Harbor Engineering Co., Ltd. is about 794 million yuan; EPC of modern cold chain supporting of land port hub | Hubei Project of China Electric Power Construction Co., Ltd. is about 407 million yuan; EPC of industrial community of land port hub | CCCC Second Harbor Engineering Co., Ltd. is about 769 million yuan..

2026-05-27

China Shipbuilding Perry Hydrogen Energy has accelerated its national layout, built a new Shuangyashan base with a total investment of 1 billion yuan, produced 30 large-scale electrolyzers annually, and strengthened the self-control of green hydrogen equipment and the supply capacity of the whole industrial chain.

2026-05-27

Digital New Energy DataBM. Com released "China's photovoltaic module shipments TOP10 in 2025", the total shipments of 10 major component enterprises decreased by 7.2% year on year, the top four shipments accounted for 64.63% of the total 10, and the industry concentration gathered to the head. Enterprises are divided into four echelons, Jingke and Longji stand side by side, Tianhe and Jingao are exchanged, Tongwei and Zhengtai are stable, and Xiexin are changing dramatically in the middle and later stages.

2026-05-27

Recently, Pulin Chengshan Plant, a Malaysian company affiliated to China Construction Western Construction, was officially put into operation, which is the first fixed site of the company's layout in Kedah, marking a key step in the development of the northern Malaysian market, and has an important "bridgehead" significance for regional business expansion.

2026-05-27

On May 22, the EPC tender for the 200 MW/800 MWh grid-side energy storage project in Yima City, Sanmenxia, Henan Province, with an estimated contract price of 880 million yuan and a unit price of 1.1 yuan/Wh.

2026-05-27

Sinoma Construction and Shuntai Investment signed the EPC project of Zvishavane 6000t/d cement clinker production line in Zimbabwe.

2026-05-27

53 on September 24, 2025, a major road traffic accident occurred in the riverside section of Wolong Village, Jiajinkou Town, Gongdeng Road, Gongyi City, Zhengzhou City, resulting in three deaths, one injury, vehicle damage and a direct economic loss of 2.85 million yuan.

2026-05-27

On May 13, Shanxi Energy Bureau announced the list of the first batch of abolished wind and photovoltaic projects in 2026, involving 21 projects with a total scale of 1.382084 million kilowatts.

2026-05-27

The production line has been put into operation for many years. This is a reconstruction and expansion project. The current mining scale is 2.2 million tons/year. After the implementation of the project, the mining scale will reach 4 million tons/year.

2026-05-27

At the SNEC Optical Storage Conference in 2026, many enterprises won orders for photovoltaic and energy storage. Among them, the scale of photovoltaic orders is about 8.819 GW, and the scale of energy storage orders is about 43 GWh.

2026-05-27

Among them, the base price of Chuxiong base assets transfer is 56.36 million yuan, and that of Dafeng base assets transfer is 25.78 million yuan.

2026-05-27

Zunyi, Guizhou will build a 700 million yuan photovoltaic inverter and energy storage project, with an annual output of 80000 inverters and 1.5G Wh energy storage system, with a 5.5 year cost recovery and an annual tax payment of 100 million yuan, to promote green and low-carbon development.

2026-05-27

The State Energy Administration held a symposium on private enterprises, emphasizing support for private enterprises to participate in energy construction and reform, optimize the business environment, stimulate the vitality of private enterprises, and promote high-quality energy development.

2026-05-27

Recently, Sinoma Construction and Shuntai Investment Co., Ltd. (Hereinafter referred to as "Shuntai Investment") held the signing ceremony of Zimbabwe Zvishavane 6000TPD clinker cement production line EPC project in Beijing. Zhang Sicai, director and general manager of Sinoma Construction, signed the contract on behalf of the two sides, and the relevant business leaders jointly attended and witnessed this important moment.

2026-05-26

According to the news released by the official of Yunnan Energy Bureau on May 26, recently, the 540 MW photovoltaic project group in Longyang District, Baoshan, Yunnan Province, has started construction in an all-round way, with a total investment of more than 1.87 billion yuan.

2026-05-26

On May 26, Tuori Xinneng issued two announcements, one about Chen Chen's counterattack, the other about Chen Wukui, Li Fenli and Chen Chen's equity "struggle".

2026-05-26

Digital New Energy DataBM. Com has learned that since May 20, there have been high-level adjustments in four state-owned power enterprises, namely, Huadian Group, Energy-saving Wind Power, Power Investment Green Energy and State Grid Yingda, involving the positions of chairman, general manager, vice president and secretary.

2026-05-26

On June 30, the Economic and Credit Department of Hubei Province announced four capacity replacement schemes for phosphogypsum acid co-production cement clinker projects, with a total annual clinker production capacity of 2.35 million tons, all of which are equivalent replacement projects, all of which come from Huaxin Building Materials, and all of which started construction within the year.