Located in Leting County, Tangshan City, Hebei Province, Huaneng Leting 350MW Onshore Wind Power Project is invested and constructed by Huaneng Leting County Integrated Energy Co., Ltd. The project includes the 220 kV booster station built in Daxianggezhuang Town and several wind farm stations distributed in Laoting Town Station and Maozhuang Town Station, with a total installed capacity of 350 MW, belonging to the onshore wind power generation project.
2026-05-07
A few days ago, China Resources Building Materials Technology (01313. HK) announced that KPMG ( "KPMG") has been an independent auditor of the company since May 2023 and will retire after the annual general meeting of shareholders held on May 29, 2026. After careful consideration, the Board proposes not to re-appoint KPMG as the independent auditor of the Company at the AGM.
2026-05-07
Sichuan Jinding announced that the board of directors of the company received a written resignation report from Vice General Manager Du yuanyuan on May 6, 2026. For personal reasons, he resigned from the position of Vice General Manager. The resignation report took effect from the date of delivery to the board of directors, and no longer held any position in the company and its subsidiaries after his resignation.
2026-05-07
The leased object is located in the factory area of Fujian Fuqing Wannianqing Cement Co., Ltd. in Pengyang Village, Chengtou Town, Fuqing City, and the rent is paid annually. The company is 90% owned by Jiangxi Wannianqing Cement Co., Ltd.
2026-05-07
During the period of stationing, the inspection teams set up contact telephones and post office boxes respectively to receive letters and calls from the inspected objects on the protection of the ecological environment.
2026-05-07
Inner Mongolia announced the list of the second batch of independent energy storage projects in 2026:22 projects with a total scale of 5.55 GW/22.2GWh, mainly lithium iron phosphate, 2.2G W with grid-type technology, and put into operation from 2026 to 2027.
2026-05-07
The EPC bid price of an independent energy storage project in Xinjiang is as low as 1 yuan/Wh, with a scale of 300MW/1.2G Wh, and the scheme of lithium iron phosphate prefabricated cabin is adopted, reflecting a significant reduction in the cost of energy storage construction.
2026-05-07
Huayou Cobalt intends to wholly acquire Ghana's Ewoyaa Lithium Mine Project (1.127 million tons of LCE) for US $210 million to strengthen the distribution of overseas lithium resources and enhance self-sufficiency and supply chain resilience.
2026-05-07
From the perspective of the overall development of the industry, diversified transformation has become the key path for cement enterprises to cross the cycle and cultivate a new growth curve, and is leading the whole industry from traditional manufacturing to high-quality development.
2026-05-07
Recently, 12 departments in Shandong Province jointly issued the Notice on Accelerating the Normalized Operation of Remote Bid Evaluation, clarifying the compulsory scope and time nodes, and enforcing them throughout the province.
2026-05-07
According to the announcement, the underlying assets are the relevant buildings in Nanning Railway Freight Yard held by China Resources Cement (Nanning) Co., Ltd. The main buildings include platform shed, railway station platform, machine repair room, weighbridge room, staff dormitory, office, control room, guard room, fire fighting equipment room, etc.
2026-05-07
On May 6, the tender announcement of the 2026-2027 Photovoltaic Module Framework Agreement of Shenneng Stock System Enterprise was issued, and the tenderer was Hainan Shenneng Material Co., Ltd.
2026-05-07
Later, the company will maintain the continuity and stability of dividends, taking into account sustainable development and investment returns to investors.
2026-05-07
In terms of net profit, six enterprises have improved year-on-year, but only one of Huaxin Building Materials has made a profit and its net profit has increased year-on-year. At the same time, Huaxin Building Materials is the only one of the 15 enterprises whose revenue and net profit have both increased year-on-year.
2026-05-07
According to CCTV News, at about 10 A. M. on May 3, a safety accident occurred at a tower crane construction site in Xunhua Salar Autonomous County, Haidong City, Qinghai Province, resulting in two deaths, one injury and three rib and vertebral fractures. The injured are now receiving treatment in Xining City, with in stable condition and clear consciousness.
2026-05-07
Jinchang South Station and Shandan North Station of Wuwei-Zhangye Section of Lanzhou-Zhangye Line 3 and Line 4 are newly built, with an area of 7997.65 square meters and 2998 square meters respectively, as well as water supply and drainage, heating and ventilation, electricity, tunnel decoration, platform pavement and other related projects supporting the station building project; civil engineering and supporting projects of transfer corridor at the lower part of the station building platform of Jinchang South Station.
2026-05-07
The industry urgently needs to get rid of involution and turn to value creation to achieve sustainable development through innovation, efficiency improvement and quality improvement, rather than low-level repetition of "endure" time.
2026-05-07
Tianhe Energy Storage has been certified by BNEF Tier 1 for ten consecutive quarters, demonstrating its global leading, stable and reliable hard-core energy storage strength.
2026-05-07
On April 28, China Power Construction Power Construction New Energy Company Pengshui Zhufo Photovoltaic Project Pengshui Zhufo Photovoltaic Project EPC General Contracting Procurement Project Public Bidding Announcement was issued, and the tenderer was Chongqing Pengshui Juhui Lizhi New Energy Co., Ltd.
2026-05-07
Digital New Energy DataBM. Com learned that on May 6, Jingao Technologies released a record of investor relations activities in April 2026.
2026-05-07
CEMPI
94.56
0 0%
CONCPI
88.61
-0.01 -0.01%
CLKPI
98.12
0.00 0.00%
SPPI
44.43
-0.02 -0.04%
MORPI
73.32
0.00 0.00%
On June 30, the Economic and Credit Department of Hubei Province announced four capacity replacement schemes for phosphogypsum acid co-production cement clinker projects, with a total annual clinker production capacity of 2.35 million tons, all of which are equivalent replacement projects, all of which come from Huaxin Building Materials, and all of which started construction within the year.