News List

Science and Technology Innovation Industrial Park of Yakeshi High-tech Industrial Development Zone in Hulunbuir (east side of Planning 4th Road, west side of Planning 11th Road, north side of Planning 13th Street and south side of Planning 15th Street)

2026-05-06

Guangzhou Liwan Kengkou Village Urban Village Reconstruction Project K13 Resettlement Housing Construction Project is located in Plot K13 of Kengkou Village Urban Village Reconstruction Project, Chongkou Street, Liwan District, Guangzhou, with a planned land area of 23558 ㎡, a total building area of 242330.7 ㎡ (subject to the actual construction application), a plot ratio of 6.9, and a building height limit of 120-150m. The total capacity area is 161374 ㎡, including residential 129071 ㎡, commercial building 26803 ㎡, public service and municipal facility building 5500 ㎡. Excluding capacity area: 80956.7 ㎡.

2026-05-06

On April 30, the Three Gorges Energy announced that the Board of Directors of the Three Gorges Energy had considered and approved the Bill on the Transfer of 200 MW Photovoltaic Sand Control Project Assets in Wuwei, Gansu Province by Non-public Agreement.

2026-05-06

Instrument plays an important role in industrial production, and its dial pointer value must be clear and visible. The instrument identification plate shall not be blurred. Recently, it is found that the instrument state in the raw material vertical mill process of an enterprise is somewhat abnormal.

2026-05-06

Since May 1, leading cement enterprises in Shijiazhuang area have notified an increase of 50 yuan/ton in cement price, with an actual target increase of about 30 yuan/ton, and the specific implementation needs further follow-up observation.

2026-05-06

On April 29, the 100MW Photothermal + 800MW Photovoltaic Integration Project in Dangxiong County, Lhasa, a Xizang of Zhongneng Construction, officially started construction.

2026-05-06

Recently, Conch Cement issued the Announcement on the Action Plan of "Improving Quality, Increasing Efficiency and Rewarding Returns" in 2026.

2026-05-06

Recently, Shanshui Cement released its first quarterly report for the three months ended March 31, 2026. Operating income was 1.176 billion yuan, and the loss attributable to shareholders of the company was 716 million yuan, an increase of about 19.3% over the same period last year.

2026-05-06

With the strengthening of policy regulation on the supply side and the strengthening of industry self-discipline and peak staggering, the vicious competition caused by high inventory will be curbed from the source, the pressure of superimposed market operation will continue to increase, the willingness of enterprises to repair profits will be strong, and the market price is expected to stabilize and rebound.

2026-05-06

The meeting reiterated the important position of real estate, clarified the orientation of stabilizing the real estate market, adhered to city-specific policies and implemented existing support policies throughout the year, and stabilized real estate remained the main line. The follow-up will focus on the implementation of supporting policies for replacing the old with the new, stock acquisition, housing construction and urban renewal, and the restoration of the real estate market in the year is worth looking forward to.

2026-05-06

Recently, in response to questions from investors, Jinyu Group said that according to the policy documents issued by the Ministry of Ecology and Environment, carbon trading in the cement industry is gradually tightened, which has a gradual impact on the restructuring of the cement industry.

2026-05-06

In order to earnestly implement the deployment of the CPC Central Committee and the State Council, make good use of re-loans for scientific and technological innovation and technological transformation, and encourage and guide financial institutions to further strengthen financial services for scientific and technological innovation and large-scale equipment renewal. The People's Bank of China, the National Development and Reform Commission and the Ministry of Finance jointly issued the Notice on Expanding Loans for Scientific and Technological Innovation and Technological Transformation to Further Support Equipment Renewal (hereinafter referred to as the Notice).

2026-05-06

Recently, the General Office of the Ministry of Industry and Information Technology, the General Office of the Ministry of Education, the General Office of the Ministry of Culture and Tourism, and the General Office of the State Administration of Radio, Film and Television issued a circular on the publication of typical cases of the 2025 yuan Universe.

2026-05-06

The total land area of this project is about 800400 square meters, or 1200 mu, and the total building area is about 492000 square meters, and the purchase, installation and commissioning of equipment have been completed.

2026-05-06

Main construction contents of Phase I: annual output of 100 sets of 1500Nm3-2000Nm3 alkaline (ALK) electrolytic cell production line; 500MW/year plateau type PEM electrolytic cell production line; 40000t/a methanol synthesis device and component standardization production line; annual output of 120 sets of 500kW hydrogen-oxygen cogeneration integrated equipment assembly line; Annual output of 50 sets of 500 kg/day skid-mounted methanol hydrogenation station integrated equipment production line and corresponding auxiliary production facilities.

2026-05-06

The total floor area of the project is 56908. 24 square meters (about 85.36 mu), and the total building area is about 191218. 18 square meters (of which: the above-ground building area is about 142270 square meters, and the underground building area is about 48948. 18 square meters). The main construction contents are residential, commercial, supporting facilities, underground garage and civil air defense facilities, and supporting the construction of municipal roads on the west side (subject to the final planning approval). This tender is for the general contracting of the Central Xufu Project (excluding the municipal roads on the west side of the supporting construction).

2026-05-06

The project site is located on the east side of Shiji East Elevated Road, Xuanwu District, Nanjing, between Beijing-Shanghai Railway and Shanghai-Nanjing Intercity Railway, and west of Hongshan Road, with a total land area of about 31,200 square meters. In the preliminary design, the total building area of the houses to be built is controlled as 64,700 square meters, with one floor underground and six floors above ground, of which the building area above ground is 51,200 square meters and the building area of the basement is 13,500 square meters. 240 parking spaces for motor vehicles. The project includes: building, structure, heating and ventilation, indoor and outdoor water supply and drainage, lighting, power, communication, information, as well as surrounding site layout, roads, fences and other related works within the planned red line. Houses are still being built.

2026-05-06

The total land area of this project is about 35124 square meters, with a plot ratio of 4.80, an estimated total construction area of 251331 square meters, and a total capacity construction area of about 168601 square meters. Building density ≤ 28%, green space ratio ≥ 35%, building height ≤ 100 meters, podium building 1 to 2 floors, residential tower 1 to 32 floors. Residential buildings are expected to be two modular buildings of Grade 3 # and Grade 4 , with a modular area of about 40915 square meters. 1 # and 5 # are Class A prefabricated buildings with an area of approximately 41297 square meters. 2 , 6 # to 8 # are basic-level prefabricated buildings, with a prefabricated area of about

2026-05-06

The total planned land area of this project is 28443.161 ㎡ (42.663 mu), the total building area is 167201.83 ㎡, and the underground 49392 is.44 ㎡. The newly-built buildings include: library, cultural center, Wenchuang service building (138.95m high); Wenchuang office, supporting service room and underground garage. Construction site: east of East 2nd Ring Road, Yuhua District, Shijiazhuang City, Hebei Province, and south of Tanan Road.

2026-05-06

Construction overview of existing projects: The section from Wuhan West to Yichang of Shanghai-Chongqing Expressway starts from Wuhan West Hub, passes through Caidian District of Wuhan City, Hanchuan City, Xiantao City and Qianjiang City of Xiaogan City, Jingzhou District and Shashi District of Jingzhou City, Zhijiang City, Yiling District, Wujiagang District and Xiaoting District of Yichang City, and ends at Gaojiadian Hub Interchange of Wujiagang District of Yichang City (intersection of Shanghai-Chongqing Expressway and Ya Expressway). The mileage is about 265.7 kilometers, and the total mileage is about 271 kilometers after Gaojiadian Hub Interchange is connected to Yichang Toll Station. The highway is a two-way four-lane, fully enclosed expressway with cement concrete pavement.

2026-05-06

On June 30, the Economic and Credit Department of Hubei Province announced four capacity replacement schemes for phosphogypsum acid co-production cement clinker projects, with a total annual clinker production capacity of 2.35 million tons, all of which are equivalent replacement projects, all of which come from Huaxin Building Materials, and all of which started construction within the year.