9.828 billion! Guangdong Hydropower Pre-bid for Two Distributed Photovoltaic Projects

2023-02-24 11:09:09

The total construction and installation cost of the two bidding sections is 9.828 billion yuan.

On the evening of February

22, Guangdong Hydropower announced that the successful candidates for the second and third bidding sections of the distributed grid-connected photovoltaic power generation project in Shizuishan City, Ningxia and other five cities had been announced. Zhongnanyue Hydropower Construction Co., Ltd., a wholly-owned subsidiary of the company, is the first successful candidate for the two bidding sections of the above project, with a total construction and installation cost of 9.828 billion yuan . The details of the

project are as follows:

the second bid section of the general contracting project of distributed grid-connected photovoltaic power generation project in Shizuishan City, Ningxia and other five cities, with a bid price of 3.64 yuan/W (fixed unit price) and an estimated total construction and installation cost of 1.092 billion yuan. The construction and equipment installation period is 210 calendar days. The main contents of the project are the installation of 300 MW distributed photovoltaic power stations in Shizuishan, Zhongwei, Wuzhong, Guyuan and Yinchuan of Ningxia. The bid price of the third bid section of the distributed grid-connected photovoltaic power generation project in Shizuishan City,

Ningxia and other five cities is 3.64 yuan/W (fixed unit price), the estimated total construction and installation cost is 8.736 billion yuan, and the construction and equipment installation period is 730 calendar days. The main contents of the project are the installation of 2.4G W distributed photovoltaic power stations in Shizuishan, Zhongwei, Wuzhong, Guyuan and Yinchuan , Ningxia. Publicity period of successful candidate of the

project: from February 22, 2023 to February 24, 2023.

All can be viewed after purchase
Correlation

The total construction and installation cost of the two bidding sections is 9.828 billion yuan.

2023-02-24 11:09:09

The domestic cement market has limited space and is shrinking. In order to find a growth point, cement enterprises must "expand outward in space". For large enterprises, going to sea has changed from an option to a necessary option.