Total 11.6 billion yuan! Shanghai Construction Engineering, Shaanxi Construction Engineering, China Huaxi, Hunan Industry, Yunnan Construction Investment and Sichuan Jiaotong Construction won the bid.

2025-12-22 13:20:09

Located in Hongkou District and Pudong New Area, the main line starts from Dabaishu Interchange in the north and ends at Xiaolujiazui Working Well (including ramp) in the south, with a total length of 6.35 km. The main construction contents include: the main line of the new tunnel is 5.6km long, of which the shield section is 4.6km long and the open-cut section is 1.0km long; the Dabaishu Interchange is reconstructed; the ramp at the entrance (exit) of Zhongshan North 2nd Road, Siping Road, Zhoujiazui Road, Linping Road, Hailar Road and Pudong Avenue is set up; the ground roads such as Yixian Road, Quyang Road, Linping Road, Yuezhou Road, Gaoyang Road and Pudong South Road are reconstructed; Simultaneous implementation of drainage, lighting, signs and markings, tunnel electromechanical,

Project Name: Public Notice of

Bid Winning for the New Construction Project of Puxi Section and River-crossing Section of the North-South Passage 2 Construction Location: Hongkou District

, Shanghai Project Overview: The new construction project of Puxi Section and River-crossing Section of the North-South Passage is located in Hongkou District and Pudong New Area. The main line starts from Dabaishu Interchange in the north. South to Xiaolujiazui working shaft (including ramp), with a total length of 6. The main construction contents include: the main line of the new tunnel is 5.6 kilometers long, including 4.6 kilometers of shield section and open-cut section. 1.

Total investment: 17084.28 million yuan. Construction and installation cost of this bid section: 2,158.49 million yuan

Maximum price: 2,158.49 million yuan

Construction period: 2,374 calendar days

Other description: This bid section is located in Quyang South Road (Siping Road to Linping Road) and Linping Road (Quyang South Road to Yuezhou Road). The total length of the ground road is about 1. The main work includes the open-cut tunnel section of Siping Road working well (excluding the north end and shield starting reinforcement, circular tunnel well joint) to Linping Road working well (excluding the south end and shield receiving reinforcement, circular tunnel well joint), Siping Road exit ramp, Zhoujiazui Road entrance ramp, ground road and drainage, flood control wall and other main projects. It does not include ancillary works such as electromechanical, decoration, traffic safety facilities, sound barriers, main line and entrance and exit ramp asphalt.

Bid winning information:

First place: Shanghai Construction Engineering Group Co., Ltd.

Quotation amount (10,000 yuan): 2013 13.9102

Second place: Shanghai Tunnel Engineering Co., Ltd.

Quotation amount (10,000 yuan): 2037 40.6968

Project Name: New Development Kailin Wisdom Plaza Project Announcement on

Bid-winning Results of EPC Project Project Overview: New Development Kailin Wisdom Plaza Project is an important part of the East Plaza Business District in front of Zhengzhou East Railway Station, with a land area of 60,393.26 square meters. The total building area is about 490000 square meters, of which the underground garage building area is about 143000 square meters, and the above-ground building area of the industrial part (including office, commerce and related supporting facilities) is about 220000 square meters. The above-ground building area of the residential part (including commercial residence, kindergarten and related supporting facilities) is about 12.

Note: The office building and the commercial part (including the corresponding underground garage and related supporting facilities) of this project are collectively referred to as the "industrial part", and the commercial residence (including the corresponding underground garage, kindergarten and related supporting facilities) are collectively referred to as the "residential part".

Construction site: North of Lianhu Road and West of Boxue Road, Zhengdong New District, Zhengzhou, Henan.

Bidding scope: including but not limited to preliminary and construction drawing design of Newly Developed Kailin Wisdom Plaza Project (industrial part and residential part), as well as material and equipment procurement, engineering construction, completion acceptance, handling of relevant procedures, trial operation, maintenance before handover, project delivery, warranty within the warranty period and other contents within the scope of construction drawings. The scope does not include power supply and distribution engineering, night lighting engineering, outdoor pipe network and landscape greening engineering, water supply engineering, thermal engineering, gas engineering, communication engineering, sign supply and installation and other supporting projects.

Construction period: the total construction period of the industrial part (including the design construction period): [1270] calendar days, of which the design construction period is [70] calendar days and the construction period is [1200] calendar days (the construction period starts from the date when the construction permit is obtained for the project construction to the date when the construction of all the project contents is completed, the completion filing is completed and the contract delivery conditions are met); Total construction period of

residential part (including design period): [1,080] calendar days, including design period of [50] calendar days and construction period of [1,030] calendar days (the construction period starts from the date when the construction permit is obtained for the project construction to the date when the construction of all project contents is completed, the completion filing is completed and the contract delivery conditions are met).

Bid winning information:

Bid winning company: Shaanxi Construction Engineering Group Co., Ltd.

Zhengzhou Architectural Design & Research Institute Co., Ltd.

Bid winning amount: 182199. The construction site of this project is located in the New Material Industrial Park of Longxian Industrial Park, Baoji City, Shaanxi Province. It is located about 7 km to the southwest of Longxian County.

Bid winning information:

First place: Shaanxi Construction Engineering New Energy Co., Ltd.

Quotation amount (10,000 yuan): 90119. 899536

Second place: China Construction Third Engineering Bureau Group Co., Ltd.

Xi'an Zhenghe Electric Power Design Co., Ltd. Company

quotation amount (ten thousand yuan): 94750. 475612

No.3: Rongao Electric Power Construction Co., Ltd.

Shaanxi Junao Electric Power Engineering Co., Ltd.

Quotation amount (ten thousand yuan): 88630.

Project scale: The total planned construction area is about 422711. 98 square meters, of which the total planned construction area of Plot 1 is 279984. 21 square meters, and the total planned construction area of Plot 2 is 142727. 77 square meters (including the built 53558. The total construction area implemented this time is 369153. 75 square meters. Of which: the total construction area of Plot 1 is 279984. 21 square meters (the above-ground 193607 is. 76 square meters, and the underground 86376 is. 45 square meters); The total construction area of the second plot is 89169. 54 square meters (53776. 32 square meters on the ground and 35393 underground.

Bidding scope: all construction contents shown in the construction drawings and the bill of quantities of the project.

Planned construction period: 730 calendar days.

Bid Winning Information:

Bid Winning Company: China Huaxi Enterprises Co., Ltd.

Bid Winning Amount: 1392717465

Project Name: Renze District Zhanguang 150MW Wind Power Project EPC Candidates Announcement 0 HTML 0 UNK3 9 Project Location: Xingtai City, Hebei Province 0 HTML 0 UNK4 0 Bidding Conditions: The EPC of Zhanze District's 150MW Wind Power Project has been approved by the project approval/approval/filing authority, the source of project funds is self-raised by other enterprises, and the tenderer is Xingtai Yangzhen New Energy Technology Co., Ltd. This project has met the bidding conditions, and the current bidding method is public bidding. 0 HTML0 UNK4 1 Construction Scale: Renze District Zhanguang 150MW Wind Power Project has an EPC installed capacity of 150MW, and 24 WTG-220-6.25 wind turbines are planned to be installed, with a single wind turbine capacity of 6. The installed capacity of the wind farm is 150MW. At the same time, a supporting 220kV booster station will be built. Six 35kV collector lines are planned to be built in the site to connect to the new 220kV booster station, and one 220kV outgoing line will be sent back to Yaoshan 220kV substation. The final access scheme of this project shall be subject to the access system report and approval documents. 0 HTML0 UNK4 2 Bid winning information: 0 HTML0 UNK4 3 First place: Hunan Industrial Equipment Installation Co., Ltd. 0 HTML0 UNK4 4 Quotation amount (RMB 10,000): 103792. 4 0 HTML0 UNK4 5 Second place: Xingneng Electric Power Construction Co., Ltd. 0 HTML0 UNK4 6 Quotation amount (RMB 10,000): 116 072510 HTML0 UNK4 7 Third place: Hunan Xinyalin Engineering Technology Co., Ltd. 0 HTML0 UNK4 8 Quotation amount (ten thousand yuan): 97512. 6660570 HTML0 UNK4 9 Project name: Longgang City JW-E-02 Land, Public Notice of Successful Candidates for Agent Construction and Development of Resettlement Housing Construction Project of Plot LY-G-03 0HTML0UNK5 0Bidding Scale: The total land area of Plot JW-E-02 in Longgang City is 30322 square meters (about 45.48 mu), and the total construction area of the project is 117,402 square meters. Of which: the above-ground construction area is 84902 square meters, the underground construction area is 32500 square meters, and the plot ratio is 2. The total land area of the LY-G-03 plot in Longgang City is 32814 square meters (about 49.The total construction area of the project is 145715 square meters, of which the above-ground construction area is 98442 square meters and the underground construction area is 47273 square meters. Plot ratio 3.

Bid winning information:

First place: Zhejiang Shangda Real Estate Group Co., Ltd.

Zhejiang Zhongwei Architectural Engineering Design Co., Ltd.

Zhejiang Yubo Construction Group Co., Ltd.

Bid quotation (RMB): 813,923, 396.00

Second place: Musen Construction Management (Wenzhou) Co., Ltd.

Xiamen Haitou Engineering Construction Co.

, Ltd. Gonghe Design Group Co., Ltd.

Bid price (RMB): 815,669, 224.00

Third place: Zhejiang Pengda Real Estate Group Co., Ltd.

Zhejiang Chaoyuan Construction Co., Ltd.

Zhongyu Architectural Design Institute (Zhejiang) Co., Ltd.

Bid price (RMB): 815,669, 224. The main technical standards are: to adopt the technical standards for the construction of first-class highways (taking into account the functions of urban roads), with a design speed of 80 km/H for the main line and 40 km/H for the auxiliary road. The section from the starting point to the east abutment of Taihe Minjiang Bridge and the section from Wenzhong Street to the end are about 10.8 kilometers, with a roadbed width of 33.5 meters and 6 lanes in both directions. The length of Taihe Minjiang River Bridge is about 2.

Construction content: The part of the road engineering project of Meishan urban section of Tianfu Avenue beyond the width of 40 meters in the middle of the road (including the side belts, auxiliary roads and sidewalks on both sides) is invested by the government, and the total length of the route is about 16 kilometers. Including but not limited to subgrade, pavement, bridge and culvert, greening and environmental protection, traffic safety engineering, rainwater engineering, sewage engineering, water supply engineering, communication engineering (embedded pipeline), power engineering (embedded power shallow trench), lighting engineering, level crossing signal lamp, etc. This part is invested by the government, and the owner is Meishan Hengxin Transportation Investment and Construction Co., Ltd. (Specify the construction site and scale of this bidding project).

Technical standard: The project is constructed according to the technical standard of first-class highway (taking into account the functions of urban roads). The design speed of the main line is 80 km/H, and the design speed of the auxiliary road is 40 km/H. The section from the starting point to the east abutment of Taihe Minjiang River Bridge and the section from Wenzhong Street to the terminal is about 10.8 kilometers long, with a roadbed width of 33.5 meters and 6 lanes in both directions. The section from the west abutment of Taihe Minjiang River Bridge to Wenzhong Street is about 3 kilometers long (the new central section of the city), with supporting municipal functions and 12 lanes in both directions (8 motor lanes + 4 auxiliary lanes); Taihe Minjiang River Bridge is about 2.8km long and 65.0km wide. The whole line is paved with asphalt concrete. The load grade is highway-I. The design flood frequency is 1/300 for super major bridges, 1/100 for large and medium bridges, and 1/100 for small bridges, culverts and roadbeds; The peak acceleration of ground motion is 0.

Bidding scope: K2 + 800-k19 + 946.

The bidding scope is: the part beyond the width of 40 meters in the middle of the road width of the road project in Meishan urban section of Tianfu Avenue (including the side strips, auxiliary roads and sidewalks on both sides) is the part invested by the government. The total length of the route is about 16 kilometers, including but not limited to subgrade, pavement, bridges and culverts, greening and environmental protection, traffic safety engineering, rainwater engineering, sewage engineering, water supply engineering, communication engineering (embedded pipelines), power engineering (embedded power shallow ditches), lighting engineering, level crossing signal lights, etc. This part is the government investment part.

Planned construction period

: the construction period is 36 months (1080 calendar days) and the trial operation period is 6 months.

Bid winning information:

First place: Sichuan Communications Construction Group Co., Ltd.

Bid quotation (RMB): 760363738.76

Second place: Sichuan Highway and Bridge Construction Group Co., Ltd.

Price (yuan): 761148427.96

No.3: Sichuan Chuanjiao Road and Bridge Co., Ltd.

Bid Price (yuan): 759186706. The main contents of the project are: civil works of T3 terminal, installation works, fine decoration, greening and beautification, and weak current system. The viaduct in front of the building and its traffic safety works, the thermal energy center and the ancillary rooms of the parking lot, etc. Among them, the building area of T3 terminal is about 33851. 24 ㎡, the building area of the ancillary buildings of the thermal energy center and parking lot is about 436.46m, the bridge deck area of the viaduct is about 14544 ㎡, and the length is about 1376. The function description is as follows:

(1) T3 terminal is a domestic terminal. The design target year of this phase is 2030, which meets the domestic passenger throughput of 3.9 million person-times, and is designed and constructed according to the green two-star level. In this phase, the main building, south corridor and north corridor will be constructed, which will be connected with the near waiting area of T2 Terminal Phase II through the north corridor to realize integrated operation. T3 terminal integrates the needs of domestic passengers, including departure, arrival, transit, stopover and other passenger functions. The terminal building has two floors above the ground, and the highest point of the building roof is 31.

(2) The viaduct in front of the building has six bridge ramps. ① R 1 ramp bridge is a circular approach and departure viaduct ramp, which is connected with Airport Road and Guanbin Road through the off-site viaduct (invested and constructed by the local government). R1 ramp includes the departure platform at the side of the elevated lane in front of T3 terminal building and the lane side to form the circulation circle in front of T3 terminal building. ②) Return to the ramp after the R2 ramp bridge sends off passengers, so as to realize the function of the departure platform entering the parking lot in front of T3 terminal. ③ R3 ramp bridge is the landing ramp, which realizes the function of directly entering the parking lot in front of T3 terminal building from the outfield viaduct. ④ R4 ramp bridge is a two-way ramp for entrance and exit, which realizes the function of outfield viaduct to enter and exit the parking lot in front of T1 and T2 buildings and the freight station. ⑤ R5 ramp bridge is the departure ramp, realizing the function of going from the parking lot in front of T3 terminal to the outfield viaduct. ⑥ R6 ramp bridge is the connecting ramp in the site area, which realizes the function of T1, T2 front parking lot and freight station to T3 terminal departure platform.

(3) The ancillary works mainly include the thermal energy center and the ancillary rooms of the parking lot. The thermal energy center is to meet the demand of air conditioning cooling and heating of the new T3 terminal building in this phase. The ancillary rooms of the parking lot are mainly equipped with public toilets, driver's rest rooms and substations.

Project location: Dali Fengyi Airport (Dali City, Dali Bai Autonomous Prefecture, Yunnan Province).

Planned duration: 913 calendar days, The specific commencement date shall be subject to the commencement order. Investment scale of

the project: 71077: RMB

0.34 million Bid winning information:

First place: Yunnan Jiantou Fourth Construction Co., Ltd

. Quotation of Yunnan Airport Construction Development Co., Ltd.

(10,000 yuan): 70240. Second place in 385613

: MCC2

Northwest Civil Aviation Airport Construction Group Co., Ltd

. Quotation (10,000 yuan): 70133. Third place in 984554

: China Railway Siju Group Quotation of

Guangzhou Baiyun International Airport Construction and Development Co.,

Ltd. (RMB 10,000): 70211.

Project scale: The total investment of the project is RMB 250,000 151999. The construction project

of Yibin Caiba Urban and Rural Backbone Cold Chain Logistics Industrial Park-Overpass Bridge is located at the entrance and exit of G85 Yinkun Expressway, South Toll Station, Cuiping District, Yibin City. The estimated investment of the project is about 170 million yuan, and the construction and installation investment is about 140 million yuan. The proposed overpass bridge crosses over the entrance and exit of the toll station of the South Expressway Station and the National Highway G353. The design length of the proposed bridge is about 185 meters, the width of the red line is 28 meters, and the motor lanes are 3.5 meters and 3.25 meters respectively. Non-motorized lane 2.

Construction period: 540 calendar days

Bid winning information:

First place: Sichuan Communications Construction Group Co., Ltd.

Sichuan Highway Information Technology Co., Ltd.

Bid price (RMB): 66379640 .53

Second place: Hunan Road & Bridge Construction Group Co., Ltd.

Tender offer (RMB): 66379640.53

Third place: Shandong Road & Bridge Group Co., Ltd.

Tender offer (RMB): 663796 40.530 HTML0U NK4 Project Name: New Energy Industrial Park Construction Project of Jincheng Industrial Investment Group Design-Construction General Contracting/Bid Section Bid Evaluation Result Announcement 0HTML0 UNK5 Construction Location: Puxing Street, Xinjin District, Chengdu 0HTML0 UNK6 Construction Scale: The total area involved in the reconstruction project is about 111481. 0HTML0 UNK7 Bidding Scope: Including the design of this project Construction until completion acceptance and overall handover, repair within the project defect liability period, and warranty work within the project quality warranty period. 0 HTML 0 UNK8 Planned construction period: 120 calendar days 0 HTML 0 UNK9 Information of bid winning: 0 HTML 0 UNK1 0 First place: (Leader) Hunan Industrial Equipment Installation Co., Ltd. 0 HTML 0 UNK1 1 (Member) The 11th Design and Research Institute of Information Industry Electronics Technology Engineering Co., Ltd. 0 HTML 0 UNK1 2 Bid Price (RMB): 530701546.000 HTML0 530701546.000 3 Second Place: (Leader) China Railway Wuju Group Co., Ltd. 0 HTML0 530701546.000 4 (Member) Chengdu Meixia Architectural Design Co., Ltd. 0 HTML0 530701546.000 5 Bid Price (RMB): 529201726. 700 HTML0 530701546.000 6 Third Place Name: (Leader) Guangdong No.2 Construction Engineering Co., Ltd. 0 HTML0 532821980.0 7 (Member) Sichuan University Engineering Design and Research Institute Co., Ltd. 0 HTML0 532821980.0 8 Bid Price (RMB): 532821980.0 HTML0 532821980.0 9 Second Bid Section: 15 # Residence, S3 Elderly and Sanitation, 17 # Residence, S1 # commercial, supporting, including building engineering (foundation and foundation, main structure, building decoration, building roof, building water supply and drainage and heating, ventilation and air conditioning, building electricity, intelligent building, building energy conservation, elevator), large area outdoor engineering (outdoor facilities, ancillary buildings and outdoor environment), etc. 0 HTML0 UNK2 0 Bid Winning Information: 0 HTML0 UNK2 1 Bid Section I 0 HTML0 UNK2 2 Bid Winning Bidder: Inner Mongolia Zhonghe Taixin Construction Engineering Co., Ltd. 0 HTML0 UNK2 3 Bid Winning Price: 69190 RMB 1,011,130,000 0 HTML0 UNK2 4 Bid Section II 0 HTML0 UNK2 5 Bid Winning Bidder: Nei Mongolia Zhonghe Taixin Construction Engineering Co., Ltd. 0 HTML0 UNK2 6 Bid price: 12513. 0 HTML0 UNK2 7 Project scale: Luoyuan County Outer Ring Road Dutou Section Project (Phase I) Construction scope includes Jiangbin North Road Section A JK0 + 000 ~ JK0 + 388 and Y104YK0 + 030 ~ YK0 + 933. Section A of Jiangbin North Road starts at the bridge head of Wuli Bridge and ends at the entrance of the passage; Y104 starts from the level crossing of Jiangbin North Road and ends at the Vocational Education Center. The total length of Phase I is 1.0 HTML0 UNK2 8. Planned construction period: 450 calendar days/months, of which the planned construction period of the control project (/) is/calendar days/months, and the defect liability period is 24 months. 0 HTML0 UNK2 9 Bidding scope: The construction of this project is divided into 1 bid section, which is divided into/bid section groups (used when setting bid section groups) according to the nature of the project; this bidding is for 1 bid section and/bid section groups (used when setting bid section groups). 0 HTML 0 UNK3 0 Bid winning information: 0 HTML 0 UNK3 1 First bid winning candidate: Fujian First Highway Engineering Group Co., Ltd. 0 HTML 0 UNK3 2 Total bid price (RMB): 57,556, 846.000HTML0 UNK3 3 Project Name: Announcement of EPC Bid Winning Result of Comprehensive Land Renovation Project in Xinfa Town, Langxi County in 2025 0 HTML0 UNK3 4 Construction Location: Xinfa Town, Langxi County, Xuancheng City 0 HTML0 UNK3 5 Construction Scale: This project is located in Xinfa Town, Langxi County, Xuancheng City. Construction Content: agricultural land consolidation, construction land consolidation, ecological protection and restoration, rural style upgrading and historical and cultural protection, industry introduction, infrastructure upgrading projects, etc. The total scale of irrigation and drainage of this project is 14355. Undertake the procurement of all engineering materials and the general contracting of construction and management until the project is completed, accepted and handed over as a whole. Undertake the defect repair and warranty work within the warranty period of the project. The specific contents shall be subject to the actual requirements of the tenderee; 0 HTML0 UNK3 6 Planned construction period: 700 calendar days (from the date of signing the contract to the overall completion acceptance of the project), of which: (1) Design period: all design and review work shall be completed within 60 calendar days from the date of signing the contract. (2) Procurement and construction period: it shall be arranged by the Contractor according to the requirements of the project progress, but it must meet the requirements of the planned construction period.

All can be viewed after purchase
Correlation

Located in Hongkou District and Pudong New Area, the main line starts from Dabaishu Interchange in the north and ends at Xiaolujiazui Working Well (including ramp) in the south, with a total length of 6.35 km. The main construction contents include: the main line of the new tunnel is 5.6km long, of which the shield section is 4.6km long and the open-cut section is 1.0km long; the Dabaishu Interchange is reconstructed; the ramp at the entrance (exit) of Zhongshan North 2nd Road, Siping Road, Zhoujiazui Road, Linping Road, Hailar Road and Pudong Avenue is set up; the ground roads such as Yixian Road, Quyang Road, Linping Road, Yuezhou Road, Gaoyang Road and Pudong South Road are reconstructed; Simultaneous implementation of drainage, lighting, signs and markings, tunnel electromechanical,

2025-12-22 13:20:09