China Railway Construction Engineering Co., Ltd. and China Railway Construction Bridge Engineering Co., Ltd. won the bid for Jilin Highway Project

2026-02-04 13:32:46

In Linjiang City, Jilin Province, the route starts at Fenshui (county boundary) on the north side of Liumaohe Forest Farm, Linjiang City, and ends at Century Street, Sentieqiaotou, Linjiang City.

Construction site of the section

from Fenshui (county boundary) to Linjiang of

National Highway Manlin Line (G612): Linjiang City, Jilin Province. The starting point of the route is located at Fenshui (county boundary) on the north side of Liumaohe Forest Farm, Linjiang City. Ending at Century

Avenue, Sentieqiaotou, Linjiang City Construction scale: the section from Fenshui (county boundary) to Linjiang of National Highway Manlin Line (G612), the starting chainage of the route is K10 + 000, the ending chainage of the route is K67 + 735.773, the total length of the route is 57.736 km (0.191 m long chain), and the standard of two-lane second-class highway.

There are 9 large bridges of 2881 meters, 13 medium bridges of 773.5 meters, 7 small bridges of 149 meters, 94 culverts, 1 tunnel of 212 meters, 1 shed tunnel of 70 meters, 33 plane crossings, 24 car stops, 1 parking area and 1 maintenance management station along the whole line. The design load of bridges and culverts shall be Grade I highway. Division of

bid sections: This tender is divided into 2 bid sections, namely MLSG01 and MLSG02.

Bidding scope: The bidding scope of MLSG01 bid section is the construction of K10 + 000 ~ K41 + 401.551 section from Fenshui (county boundary) to Linjiang Section of National Highway Manlin Line (G612), with a total length of 31.402 km, 5 bridges of 1912.5 meters, 2 medium bridges of 111 meters and 59 culverts. 1 shed tunnel of 70m, 25 grade crossings, 1 maintenance management station and 1 parking area. The bidding scope

of MLSG02 bid section is the construction of K41 + 401.36 ~ K67 + 735.773 section from Fenshui (county boundary) to Linjiang section of National Highway Manlin Line (G612), with a total length of 26.334 km, 968.5m/4 bridges and 662.5m/11 medium bridges. There are 7 bridges of 149 meters, 35 culverts, 1 tunnel of 212 meters, 8 grade crossings and 24 bus stops.

Planned construction period: from April 1, 2026 to October 31, 2027, totaling 578 calendar days.

Bid winning information:

MLSG01

Bid winning candidate: CCCC Road & Bridge Construction Co., Ltd.

CCCC Road & Bridge North Engineering Co., Ltd.

Jilin Jigao Road & Bridge Construction Co., Ltd.

Bid quotation (RMB) 491936598MLSG02

Successful candidate: China Railway Construction Bridge Engineering Bureau Group Co., Ltd.

China Railway Construction Bridge Engineering Bureau Group Electrification Engineering Co., Ltd.

Bid quotation (RMB) 3863989330H TML0UNK18

All can be viewed after purchase
Correlation

In Linjiang City, Jilin Province, the route starts at Fenshui (county boundary) on the north side of Liumaohe Forest Farm, Linjiang City, and ends at Century Street, Sentieqiaotou, Linjiang City.

2026-02-04 13:32:46

On February 5, Hurun Research Institute released Hurun China Top 500 2025, which lists the top 500 non-state-owned enterprises in China and ranks them according to their value. The market value of listed companies is calculated according to the closing price on November 14, 2025, and the valuation of non-listed companies is estimated with reference to the listed companies in the same industry or according to the latest round of financing. This is the seventh time in a row that the Hurun Research Institute has released the "Hurun China Top 500".