Shandong Laiyang Nuclear Power Phase I Cooling Tower and Auxiliary Subproject Construction and Installation Project announced that China Energy Construction Group Anhui Electric Power Construction Second Engineering Co., Ltd. won the bid with about 890 million yuan. Interestingly, Anhui No.2 Electric Power Construction Company won two projects of Laiyang Nuclear Power and Jinan Honglou TOD in one fell swoop in the announcement on the same day, with a total bid amount of about 1.8 billion yuan-from nuclear power cooling tower to urban complex, demonstrating the market strategy of "diversified attack" of power construction enterprises.
[Project name] Construction
of Phase I Cooling Tower and Auxiliary Subproject Construction and Installation Works of Shandong Laiyang Nuclear Power Project of State Nuclear Power Institute [First Bid Winner and Quotation] China Energy Engineering Group Anhui Electric Power Construction No.2 Engineering Co., Ltd.: 89, The
project is located in the north of Majiabo Village, Tuanwang Town, Laiyang City, Yantai City, Shandong Province. Two "Guohe No.1" pressurized water reactor units will be constructed in the first phase, each of which is about 154.3M W, with a total installed capacity of about 308.6M W. The scope of this tender is large-scale forced circulation cooling tower (concrete cylinder structure, including fan, spraying device and anti-corrosion and anti-leakage system) and auxiliary sub-project construction and installation works (water pump station, pipe network, valves, instruments, etc.). The standardized modular construction method is adopted. It is planned to complete the concrete pouring of the main structure of the first unit in June 2027.
浙公网安备33010802003254号