On June 26, the Guizhou Provincial Office of Industry and Information Technology announced that. In accordance with the requirements of the Implementation Measures for Capacity Replacement in Cement and Glass Industry (2024 edition) (No.206 of the Ministry of Industry and Information Technology), on-site verification and acceptance were carried out by Anshun Bureau of Industry and Information Technology. The rotary kiln and other main equipment of the new dry process cement production line with a daily output of 1000 tons of clinker of Puding Mingda Cement Co., Ltd., which have been used for capacity replacement of Huaining Shangfeng Cement Co., Ltd., have been dismantled and no longer have the conditions for clinker production capacity, which is hereby announced.
On June 26, the Guizhou Provincial Office of Industry and Information Technology announced that. In accordance with the requirements of the Implementation Measures for Capacity Replacement in Cement and Glass Industry (2024 edition) (No.206 of the Ministry of Industry and Information Technology), on-site verification and acceptance were carried out by Anshun Bureau of Industry and Information Technology. The main equipment of Puding Mingda Cement Co., Ltd., which has been used to replace the production capacity of Huaining Shangfeng Cement Co., Ltd., such as the rotary kiln of the new dry cement production line with a daily output of 1000 tons of clinker , has been dismantled. It is now announced that it does not have the conditions to produce clinker.