China Railway and China Railway Construction Corporation won the bidding for a large number of railway projects

2026-06-30 11:28:05

New Weifang-Suqian High-speed Railway (Yihe New District Section) Project in Yihe New District of Linyi City is located in the territory of Yihe New District. The railway grade is high-speed railway, and the design speed target value is about 350 km/H.

Overview of "Three Electricity" and Pipeline Relocation, Change and New Project

of New Weifang-Suqian High-speed Railway (Yihe New Section) Project in Yihe New District

of Linyi City: "Three Electricity" and Pipeline Relocation, Change and New Project of New Weifang-Suqian High-speed Railway (Yihe New Section) Project in Yihe New District of Linyi City. The project is located in Yihe New Area, the railway grade is high-speed railway, and the design speed target value is about 350 km/H.

Construction site: Yihe New District. Source of

funds: self-raised funds.

Planned construction period: 180 calendar days.

Bid winning information

First place: Electrical Engineering Co., Ltd.

of China Railway No.10 Engineering Group Tender offer: 145938155.00 RMB

Second place: Electrification Engineering Co., Ltd.

of China Railway No.14 Engineering Group Tender offer: 14524

The third place: Electricity Engineering Co., Ltd.

of China Railway No.8 Engineering Group Bidding quotation: 146146157. Newly build a moisture-proof cargo line, two container cargo lines, set up a gantry crane, and reserve one in the long term. In addition, set up a machine standby line and a shunting line. 1.

Planned construction period: 300 calendar days (the planned commencement date is June 30, 2026 and the planned completion date is April 26, 2027);

Bidding scope: all construction contents within the scope of the design and construction drawings and the bidding bill of quantities of the special railway line project of Zizhong Rail-cum-Road Logistics Port;

division of bid sections: construction of one bid section.

Bid winning information

First place in the construction bid

: China Railway Erju Group Co., Ltd.

China Railway Erju Group Electrical Engineering Co., Ltd.

Bid price: 95915918.00 RMB

2 Name: China Railway First Engineering Group Co., Ltd.

Electricity Engineering

Co., Ltd. of China Railway First Engineering Group Co., Ltd. Bid price: 99578182.50 RMB

Third place: CRSC Construction Group Co., Ltd.

China Railway Signal & Communication (Zhengzhou) Zhongan Engineering Co., Ltd. Company

Bid Price: 99578184.00 yuan

Supervision Bid

First Place: China Railway Siju Group Anhui Engineering Consulting Co., Ltd.

Bid Price: 1411357. 00 yuan

Second Place: China Railway Huaying (Shaanxi) Engineering Consulting Co., Ltd.

Bid Price: 1411400.00 RMB

Third Place: China Huaxi Engineering Design and Construction Co., Ltd.

Bid Price: 1411357 RMB


0.00 Quanzhou-Xiamen-Zhangzhou Intercity Railway Line R1 Project (Zhangzhou Section)

Construction Location: Zhangzhou City

, Fujian Province Construction Scale: The Zhangzhou Section of Quanzhou-Xiamen-Zhangzhou Intercity Railway Line R1starts from the junction of Wenpu Mountain, Xiamen and Zhangzhou, passes through Zhangzhou Taiwanese Investment Zone, Longhai District, High-tech Zone, Longwen District and Xiangcheng District, and ends at Jintang Station. The total length of the line is 51.8 km, the total length of the underground section is 14.6 km, the total length of the mountain tunnel is about 7.5 km, and the total length of the overground section is about 29.

Main technical standards: 1.

The civil works of the Quanzhou-Xiamen-Zhangzhou Intercity Railway Line R1 Project (Zhangzhou Section), which is connected to the network at the same time, are divided into three bid sections.

Bid Winning Information

Civil Engineering SG1 Bid Section

First Place: China Railway 15th Bureau Group Co., Ltd.

Bid Price (RMB): 2177354339

Second Place: China Railway 21st Bureau Group Co., Ltd. 0 HTML 0 UNK4 3 Bid Price (RMB): 21792076750 HTML0 UNK4 4 Third Place: CCCC Third Harbor Engineering Co., Ltd. 0 HTML0 UNK4 5 Bid Price (RMB): 21771345670 HTML0 UNK4 6 Civil Engineering SG2 Bid Section 0 HTML0 UNK4 7 SG2 Bid Section 0 HTML 0 UNK4 8 First place: China Railway Siju Group Co., Ltd. 0 HTML0 UNK4 9 Bid price (RMB): 24234774530 HTML0 UNK5 0 Second place: China Railway Tunnel Engineering Group Co., Ltd. 0 HTML0 UNK5 1 Bid price (RMB): 24243392030 HTML0 UNK5 2 Third place: China China Railway Erju Group Co., Ltd. 0 HTML0 UNK5 3 Bid Price (RMB): 24240121890 HTML0 UNK5 4 Civil Engineering SG3 Bid 0 HTML0 UNK5 5 First Place: China Railway Tunnel Engineering Group Co., Ltd. 0 HTML0 UNK5 6 Bid Price (RMB): 23993077770 HTML0 UNK5 7 No.2: China Railway 17th Bureau Group Co., Ltd. 0 HTML0 UNK5 8 Bid Price (RMB): 24005188880 HTML0 UNK5 9 No.3: China Railway 14th Bureau Group Co., Ltd. 0 HTML0 UNK60 Bid Price (RMB): 24034413770 HTML0 UNK61 Shuixiang Tourist Line Intercity Railway Jiangsu Section 0 HTML0UNK62 Project Overview: The Jiangsu Section of the Shuixiang Tourist Line Intercity Railway is located in Wujiang District, Suzhou City, Jiangsu Province. The line starts from the Shanghai-Jiangsu Provincial Boundary, passes through Fenhu Lake and the south of Suzhou to Bayi, and connects with the Shanghai Demonstration Zone Line and the Rutong Suhu Intercity Railway. The newly-built main line is 27.314km, the elevated section is 17.747km, accounting for 64.96%, the underground section is 8.295km, accounting for 30.37%, and the subgrade section is 1.276km, accounting for 4.0HTML0UNK63 The main technical standards adopted for this line are as follows: This project adopts the urban C-type vehicle powered by AC 25kV catenary. The railway grade is intercity railway, the number of main lines is double, the design speed is 160 km/H, the distance between main lines is 4 meters, the minimum curve radius is 1500 meters in general sections (difficult sections are determined according to speed), the maximum slope of main lines is 20% in general sections (30% in difficult sections), and the length of platform is 210 meters. Train operation control mode is CTCS-2 + ATO.

All can be viewed after purchase
Correlation

New Weifang-Suqian High-speed Railway (Yihe New District Section) Project in Yihe New District of Linyi City is located in the territory of Yihe New District. The railway grade is high-speed railway, and the design speed target value is about 350 km/H.

2026-06-30 11:28:05

On June 30, the Economic and Credit Department of Hubei Province announced four capacity replacement schemes for phosphogypsum acid co-production cement clinker projects, with a total annual clinker production capacity of 2.35 million tons, all of which are equivalent replacement projects, all of which come from Huaxin Building Materials, and all of which started construction within the year.