Withdraw from the clinker market, many cement enterprises change the track

2026-11-27 09:09:20

Facing the changing situation of the industry, changing the track for development is becoming a realistic choice for more and more enterprises.

On November 25, Hengyang City, Hunan Province, announced the announcement of the ecological environmental impact report of Hunan Jinshan Cement Co., Ltd. for its annual output of 100000 tons of lithium-containing brine and production line renovation project before approval. Hunan Jinshan Cement Co., Ltd. will use the original 2500 t/d clinker production line to produce lithium-containing brine after technical transformation, with an annual production capacity of 100000 tons.

The EIA report shows that Hunan Jinshan Cement Co., Ltd. has the only 2500t/d cement clinker production line, and the 2500t/d cement clinker production capacity has been replaced in 2024. Hunan Jinshan Cement Co., Ltd. intends to use the production site and production equipment of the original 2500t/d cement clinker production line to transform the original clinker rotary kiln into raw materials such as fired lepidolite powder, spodumene powder, lithium-containing tailings and lithium-containing waste glass powder. Construction of rotary kiln feeding system, rotary kiln burning system, flue gas wet desulfurization system and lithium-containing meat water leaching system, with an annual output of 100,000 tons of lithium-containing water after reaching production capacity.

Two weeks ago, Hunan Xiangtan Economic and Technological Development Zone announced the annual output of 200000 cubic meters of lithium sulfate solution in the technical renovation of Xiangtan Cement Kiln. A 5000 t/d clinker production line of Sinoma Cement is equipped with a waste heat system and a cement mill. The clinker production capacity has been transferred out and the production line is currently idle; It cooperates with Jiangxi Jinshang Lithium and is implemented by Hunan Jinrong Hanzhang to renovate the existing cement kiln and build a lithium sulfate solution production line with an annual output of 200000 cubic meters. Lithium sulfate solution is the pre-raw material of lithium cathode material, which can be made into lithium carbonate and lithium hydroxide.

On October 21, Tongxiang City, Zhejiang Province, announced the technical renovation project of Xindu Cement, Zhejiang Province, with an annual output of 1.6 million tons of building base materials, with a total investment of 85 million yuan and fixed assets of 72.5 million yuan. After the reconstruction, the existing clinker production capacity will be eliminated, forming an annual output of 1 million tons of ore powder and 600000 tons of ultra-fine powder. The original 2500t/d clinker line of this enterprise has transferred its production capacity to Chizhou Conch in Anhui Province in December 2025, and no longer holds clinker production capacity after the replacement.

In recent years, the market demand of cement industry has been depressed, the contradiction of excess capacity has become increasingly prominent, the superimposed environmental protection policy has been tightened, and the living space of enterprises with weak comprehensive competitiveness has been squeezed. Facing the changing situation of the industry, changing the track for development is becoming a realistic choice for more and more enterprises.

All can be viewed after purchase
Correlation

Facing the changing situation of the industry, changing the track for development is becoming a realistic choice for more and more enterprises.

2026-11-27 09:09:20