On April 24, the tender announcement for EPC general contracting of 700000 kilowatt photovoltaic power generation project in Karamay, Xinjiang Oilfield was issued, and the tenderer was Xinjiang Oilfield Branch of PetroChina Company Limited. The project is located in Wuerhe District, Karamay City, with AC side rated capacity of 508.62 MW and DC side installed capacity of 534.052 MWp. The scope covers the design, procurement, construction, installation and commissioning of photovoltaic field area and booster gathering station. The bidder is required to have at least one performance related to 100MW and above photovoltaic power generation projects from 2022, and the consortium bidding is not accepted. The bidding documents were obtained on April 25-29, 2026, and the bidding deadline and bid opening time are 8:30 on May 18, 2026.