On May 9, the Development and Reform Commission of Yulin City, Shaanxi Province, issued the Announcement on the Proposed Abolition of Renewable Energy Projects in Stock , and a total of 20 wind power and photovoltaic projects were abolished. The total scale is 711600 kilowatts (441600 kilowatts for wind power and 270000 kilowatts for photovoltaic power). It involves 20 investment enterprises such as State Grid, Huaneng Group and Tianneng Heavy Industries. The main reasons for the abolition are the failure to complete the approval or filing within the prescribed time, the expiration of the approval documents, the failure to start construction within the validity period after the approval, and the failure to complete and put into operation within the time limit.
浙公网安备33010802003254号