News List

In 2026, the industry entered the first year of the "15th Five-Year Plan". The three major policy tasks of carbon market performance, ultra-low emission transformation and energy efficiency benchmarking overlap, and the digital and intelligent transformation has changed from "optional questions" to "necessary questions". At the same time, the industry situation is declining, and the market competition pressure is increasing. The theme of the 15th conference is "Double Carbon Leads Energy Saving and Cost Reduction, Digital Intelligence Enabling", which is the response to this historical node: with the goal of "Double Carbon" as the direction, energy saving and cost reduction as the premise of enterprise survival, and digital intelligence technology as the key engine to break the situation, the three forces converge in Wuhu, which is not only the continuation and sublimation of the past 14 topics, but also the face.

2026-07-10

On June 30, the Bureau of Ecology and Environment of Urumqi announced the EIA approval of the 2 million kilowatt photovoltaic project in Midong District of Hongqiao, Beijing, which is located in Beishawo, Midong District of Urumqi, with a total investment of 5 billion yuan.

2026-07-10

The rotary kiln (kiln diameter Ф3.2 * 48 m), preheater, calciner, air-swept coal mill and other equipment of the 1000t/d new dry process cement clinker production line of Jiaozuo Zhongjing Cement Co., Ltd. have been removed in place, and the company's production license and emission permit have been changed, so the production line no longer has the conditions to restart and resume the production of cement clinker.

2026-07-10

It is understood that in 2021, Chifeng Shanshui yuanhang Cement Company launched the project of relocating the industrial chain from the city to the park, integrating the original 2500t/d and 2000t/d cement clinker production lines, and relocating a 4500t/d cement clinker production line, which has been put into operation in 2025.

2026-07-10

At present, the cement industry is facing the overlapping period of three major policy tasks, namely, carbon market performance, energy saving and carbon reduction transformation, and ultra-low emission transformation. At the same time, digital and intelligent transformation has become a compulsory course for the high-quality development of the industry.

2026-07-10

Intelligence is no longer a choice question of "icing on the cake", but a "necessary question" concerning the survival and development of enterprises.

2026-07-10

On the whole, this round of provincial state-owned assets integration has both long-term and short-term value. In the short term, it will optimize the layout of regional cement production capacity and consolidate the basic position of Conch Cement's main business. In the long term, it will rely on the stable new material profit increment of Wanwei Hi-Tech to create the second growth curve for Conch Group and build an anti-cyclical diversified profit system.

2026-07-10

The weekly industry news snapshot focuses on key industry developments from June 29 to July 3, 2026, covering policy releases, market trends, technological breakthroughs and major events, aiming to provide a timely and concise overview of industry information.

2026-07-10

By the end of 2025, the total production capacity of industrial silicon in China was about 7.879 million tons. The new production capacity mainly comes from the preliminary planning of project production and the layout of integrated enterprises, mainly polysilicon and organic silicon related integrated enterprises. Production capacity is still concentrated in the northwest and southwest regions, accounting for 79.9% of the total.

2026-07-10

The scale of the global and China's silicon wafer industry contracted year on year, reflecting the periodic imbalance between supply and demand in the industry and the pressure of capacity adjustment.

2026-07-10

BYD won 11.275 GWh energy storage orders in the Middle East, providing support for the world's first GW-class all-weather renewable energy project, demonstrating its global leading strength in energy storage technology.

2026-07-09

The "Fifteenth Five-Year Plan" Action Plan for Carbon Peak clearly takes the green and low-carbon transformation of energy as the key, promotes the transformation of industrial structure, key areas and supporting systems as a whole, ensures that carbon peak is achieved by 2030, and lays a solid foundation for carbon neutrality.

2026-07-09

On June 30, the Bureau of Ecology and Environment of Urumqi, Xinjiang, issued a public announcement on the approval decision of the EIA document for the 2 million kilowatt photovoltaic project in Midong District, Hongqiao, Beijing.

2026-07-09

According to foreign media reports, EuroCZ Factory, a project supported by the European Union to enhance the manufacturing capacity of silicon ingots and wafers in Europe, was launched recently.

2026-07-09

On July 8, Chuneng New Energy and KK Group of Denmark signed a strategic cooperation agreement at Chuneng Global Headquarters.

2026-07-09

On July 7, Guangdong Energy Group issued a tender announcement for the second batch of centralized bidding and procurement projects for photovoltaic modules in 2026.

2026-07-09

Major enterprises in the Pearl River Delta region of Guangdong plan to raise the price of cement by 30 yuan/ton from July 10, and the specific implementation needs to be followed up.

2026-07-09

On July 7, the Development and Reform Commission of Lujiang County, Anhui Province, issued a notice on the clean-up of long-term distributed photovoltaic projects in Lujiang County.

2026-07-09

On July 6, Jiangsu Huadian Yancheng Honggang 390 MW Fishing-photovoltaic Complementary Photovoltaic Power Generation Project was announced to have won the bid for EPC general contracting.

2026-07-09

The total amount of calibration in June was 9.26 GW, an increase of 41.43% compared with May, showing the characteristics of surface warming. At the price level, the average price of 0.752 yuan/W in June fell by 10.73%, and the previous upward momentum was temporarily interrupted.

2026-07-09

A cement clinker production line with a daily output of 2500 tons used by Chongqing Wanzhou Southwest Cement Co., Ltd. to supplement the production capacity project, the rotary kiln has been cut, the grate cooler, transformer and other equipment have been dismantled, and the production capacity can not be restored.