On October 20, the public tender announcement for EPC general contracting of photovoltaic power generation project of 45MW fishing-photovoltaic complementary photovoltaic power generation project in Jiangyan, China Electric Power Construction New Energy Company, was issued. The tenderer is Juyuan New Energy Co., Ltd. of Jiangyan District, Taizhou City.
The bidding project is located in Jiangyan District, Taizhou City, Jiangsu Province, with DC side installed capacity of 52.0013 MWp and AC side rated capacity of 45 MW. The planned total construction period of the project is 270 days, the planned construction preparation start time is expected to be December 20, 2025, the planned grid-connected power generation date of the first batch of photovoltaic arrays is June 30, 2026, and the planned grid-connected power generation date of all photovoltaic arrays is August 20, 2026. The planned completion acceptance date is August 30, 2026, and the planned project handover production date is September 15, 2026. The bidding scope of the
project includes, but is not limited to, all the work involved in the completion and acceptance of the project, such as pre-formalities, design, procurement, construction and installation, commissioning, testing and inspection, grid connection, trial operation and acceptance of the project. As shown in the figure below,
this tender requires bidders to have good business conditions, business reputation and corresponding qualifications. In terms of performance, the Bidder has one photovoltaic power generation project of 50 MW or above (including 110 kV) in the recent 5 years (from October 2020 to September 2025 Completion performance of EPC general contracting project or general contracting project of photovoltaic power generation project (the completion time shall be subject to the project acceptance certificate issued by the Employer or the time of completion acceptance). Consortium bidding is accepted
in this tender. However, in case of consortium bidding, the following requirements shall be met, as shown in the figure below:
the deadline for bidding is 9:00 on November 11, 2025 (Beijing time).