China Railway Wins Bidding for South and North Sections of West Ring Line of Raw Water

2025-08-18 10:41:12

The first bid winner candidate of XHN1.2 of South Section of West Ring Line Project of yuanshui: China Railway 24th Bureau Group Co., Ltd., bid price: 13898 RMB 0.3259 million; the second bid winner candidate: China Railway 14th Bureau Group Co., Ltd., bid price: 13905 RMB 0.2127 million.

Project Name: Announcement of

Successful Candidates for XHB 1.2 Bid of North Section of West Ring Line of Raw Water Construction Location: Taihe West Raw Water Pumping Station is located in the south of S20 Outer Ring Expressway and west of Hutai Road in Baoshan District; The raw water main pipe is laid from the end of the proposed Qingcaosha-Chenhang Reservoir Pipe Connection Project (near Taihe Water Plant) to Hongqiao Raw Water Pump Station along the quarantine belt of S20 Outer Ring Expressway. Description of

project overview: The construction of the northern section of the West Ring Line of Raw Water mainly includes: 1) a new water transmission pipeline for the northern section of the West Ring Line of Raw Water, with a design scale of 2 million cubic meters per day, a pipe diameter of 3400 mm and a length of about 18.6 km, and the simultaneous implementation of 28 pipe jacking wells, shield wells and other ancillary facilities. 2) Taihe West Raw Water Pumping Station will be newly built. The civil engineering and equipment scale of the pumping station is 2 million cubic meters per day. Electrical, automatic control, power transformation and distribution rooms, roads, greening management rooms and other supporting facilities will be implemented simultaneously. The bidding project includes the general contracting construction of new pipelines, shield wells, valve wells and related ancillary works from B9 to B10 wells (including B9 and B10 wells). Including materials, pipeline production, pipeline and well construction, anti-corrosion, valve accessories installation, material transportation, construction access, traffic access, traffic organization design and coordination, temporary signs and markings, road protection and repair, building (structure) protection, pipeline relocation or protection, greening relocation and restoration, water and soil conservation, revetment reconstruction and protection, BIM modeling and application, Monitoring, temporary facilities, protection and emergency repair, pressure test and cleaning, commissioning, operation coordination, project completion and acceptance of existing buildings (structures) and other facilities and various pipelines along the pipeline and in the construction area are all involved in the completion of the works in this bid section. Total

project investment: RMB

3,241,560,000 Construction period: 1,020 calendar days

Bid winning information:

First bid winning candidate: China Railway Shanghai Engineering Bureau Group Co., Ltd.

Bid price: 17783: RMB 5,579,000 )

Second Successful Candidate: China Railway No.9 Engineering Group Co., Ltd.

Bid Price: 17846 79.72 (ten thousand yuan)

Project Name: Announcement

of Successful Candidate of XHN1.2 Bid of South Section of yuanshui West Ring Line Project Construction Location: Hujin Expressway, S20. General description of Beizhai Road

Project: The construction of the south section of the West Ring Line of Raw Water mainly includes: 1) a new water transmission pipeline for the south section of the West Ring Line of Raw Water, with a design scale of 1.2 million cubic meters per day (the check scale is 1.36 million cubic meters per day), a pipe diameter of 3000 mm and a length of about 19 kilometers. Pipe jacking shaft, shield shaft and other ancillary facilities shall be implemented simultaneously; 2 valve shafts shall be set at the connection point of the upstream raw water channel of the Huangpu River. 2) Hongqiao Raw Water Pumping Station will be built, with a design scale of 1.2 million cubic meters per day, and supporting equipment such as process and electrical automatic control, as well as supporting facilities such as valve wells, power transformation and distribution rooms, guards, fences, roads and greening will be implemented simultaneously. The total building area of the pumping station is 6432.71 square meters, including 4198.77 square meters of above-ground building area and 2233.94 square meters of underground building area. The content of this tender is the XHN1.2 bid of the South Section of the West Ring Line of Raw Water, which includes the general contracting construction of the new pipeline, shield shaft and related ancillary works from X2 # well to S14 # well. Including materials, pipeline production, pipeline and well construction, anti-corrosion, valve accessories installation, material transportation, construction access, traffic access, traffic organization design and coordination, temporary signs and markings, road protection and repair, building (structure) protection, wall demolition and restoration, pipeline relocation or protection, greening relocation and restoration, BIM modeling and application. Monitoring, temporary facilities, protection and emergency repair, pressure test and cleaning, commissioning, operation coordination, project completion and acceptance of existing buildings (structures) and other facilities and various pipelines along the pipeline and in the construction area are all involved in the completion of the works in this bid section. Total

project investment: 278918: RMB 0.24 million; construction and installation cost of

this bid section: 13989: RMB 0.2202.14 million;

construction period: 1,020 calendar days

; bid winning information:

the first successful candidate: Bid price of China Railway 24th Bureau Group Co., Ltd.

: 13898 of RMB.32.59

million Bid price of China Railway 14th Bureau Group Co.

, Ltd.: 13905 of RMB.21.27

million
All can be viewed after purchase
Correlation

Beijing Forestry University Xiongan Campus Group II Project (Bid Section I) Construction General Contracting Successful Candidates Announcement, First Place: China Railway Construction Engineering Group Co., Ltd., Bidding Price (10,000 yuan): 154695. 158925.

2025-09-15 11:44:10

Sanya Modern Service Industry Park Infrastructure Supporting Yefeng Road Phase II Project (Construction) Announcement of Successful Candidates, First Place: China Railway First Bureau Group Co., Ltd., Bid Price (RMB): 657279692.19.

2025-09-15 11:38:39

Guangzhou Nansha Station of the new Shenzhen-Jiangmen Railway and the first place in the bid for the construction of related projects: China Railway Construction Engineering Group Co., Ltd., with the bidding price (10,000 yuan) and the 243153 of 6721.

2025-09-01 10:46:01

Building Construction Project of Expansion Project of Guangling Hub to Jingjiang Hub Section of Beijing-Shanghai Expressway Bid winner: China Railway First Engineering Group Co., Ltd., bid amount (RMB): 51218027.97.

2025-08-29 09:41:45

Bid price of Shanwei Honghai Bay Green Manufacturing Industrial Park Infrastructure Supporting Project (Land Leveling) EPC Project: 1864842600.00 RMB.

2025-08-28 10:51:03

The first successful candidate of Sanjiang Luyuan Real Estate Development Design and Construction General Contracting (EPC): China Railway First Engineering Group Co., Ltd. (The leader of the consortium) and Huating Engineering Design Co., Ltd. (The member of the consortium).

2025-08-27 15:24:58

China Railway Construction Engineering Group Co., Ltd., China Railway Construction Engineering Group Hubei Co., Ltd., Wuhan Dongxihu District Planning and Architectural Design Institute, Wuhan Airport Survey and Design Co., Ltd., Wuhan Municipal Engineering Design and Research Institute Co., Ltd., and Hubei Trading and Investment Construction Group Co., Ltd. Bid price (ten thousand yuan): 100998, 071429.

2025-08-25 11:27:35

China Railway (Shanghai) Investment Group Co., Ltd. (The leader of the consortium) won the first place in the franchise project of Luoning-Songxian Section of Mianchi-Xichuan Expressway (the second time).

2025-08-21 10:33:33

Licheng District Ecological Agriculture Demonstration Zone Construction and Farmland Improvement Project (Integration of Construction and Operation) Bid winner: Xiongan Construction Co., Ltd. of China Railway 20th Bureau Group, bid price (RMB): 530526018.00.

2025-08-21 10:24:58

Jincheng West Ring Road Underground Pipe Network Renovation Project (EPC) Bid Winner: Shanxi Third Construction Engineering Group Co., Ltd. China Railway Third Engineering Group Co., Ltd.; construction engineering cost (yuan): 340257100; construction drawing design cost (yuan): 6400000

2025-08-20 09:21:51

The first bid winner candidate of XHN1.2 of South Section of West Ring Line Project of yuanshui: China Railway 24th Bureau Group Co., Ltd., bid price: 13898 RMB 0.3259 million; the second bid winner candidate: China Railway 14th Bureau Group Co., Ltd., bid price: 13905 RMB 0.2127 million.

2025-08-18 10:41:12

The "15th Winter" Fushun Longgang Mountain Snow Sports Center Supporting Infrastructure Project won the first place: China Railway Ninth Bureau Group Co., Ltd., bid price (yuan): 823249809.99.

2025-08-14 14:20:55

Recently, Fujian Cement released its performance report for the first half of 2025. In the first half of 2025, the company continued to carry out the three-year special actions of "stabilizing operation and improving efficiency" and "tackling the root causes of safety production", with the theme of "consolidation and promotion", strictly implemented the five key work measures of "resource control, precision marketing, lean operation, human efficiency improvement and cost control", and strived to promote the annual business objectives.