On October 10, the Bureau of Ecology and Environment of Aba Prefecture, Sichuan Province, issued a public announcement on the acceptance of the EIA documents for the photovoltaic power generation project of Chishajiao (Phase II) in Maoxian County, Aba Prefecture. The project
is located in Wadi Town and Shaba Town, Maoxian County, Aba Prefecture, Sichuan Province, with a total investment of 631 million yuan, a total AC side installed capacity of 150 MW, a total of 42 photovoltaic arrays, and 650 Wp monocrystalline silicon double-sided double-glass modules . A new 220 kV booster station will be built, with a total construction period of 9 months.
浙公网安备33010802003254号