On April 28, Huaneng Lingao Fixed Photovoltaic Technology Demonstration Project was officially launched in Lingao County, Hainan Province. This project is the first demonstration project of anti-typhoon marine scenery integration in China.

The project is located on the south side of A36 wind turbine at CZ1 site in the western sea area of Lingao County. It is planned to construct two fixed photovoltaic demonstration platform modules, which adopt steel structure and composite material structure respectively, and are equipped with 1050 double-sided double-glass photovoltaic modules . The installed capacity of AC side is 600 kilowatts . The project is designed according to the standard of resisting 15 typhoons, the service life of the main structure is not less than 25 years, and the designed annual average power generation is 800MWh.
浙公网安备33010802003254号