On May 2, the restoration of 100 MW photovoltaic project in Danzhu Mine, Pingnan, Guangxi, contracted by China Nengjian Anhui Electric Power Construction Company II, started. The project
is located in Danzhu Town, Pingnan County, Guigang City, Guangxi, with an installed capacity of 100 MW. Relying on the construction of abandoned mines, 26 sub-arrays will be set up in the photovoltaic area, and two specifications of monocrystalline silicon modules will be installed. After the completion of the
project, the annual power generation will be about 140 million kilowatt-hours, which can revitalize the land, control the ecology, optimize the power supply structure, and help the local green development.
浙公网安备33010802003254号