Recently, the 540 MW photovoltaic project group in Longyang District, Baoshan, Yunnan, has started construction in an all-round way, with a total investment of more than 1.87 billion yuan, consisting of 320 MW in Liuhe, 40 MW in Manglong, 90 MW in Conggang and 50 MW in Sanping. As well as Hexi (East), Bingma (South), Wadu, Waige and Pingchangzi 40 MW sub-projects, with a total installed capacity of 540 MW. The
project group adopts the mode of "complementary grazing and light" to form the mode of "power generation on the board and grazing under the board". The construction of "energy + artificial intelligence" will be promoted simultaneously, and the peak period of construction is expected to lead to more than 3000 local employment.
浙公网安备33010802003254号