5.5 billion yuan! China Railway 24th Bureau, China Railway 17th Bureau, China Railway 23rd Bureau and China Railway 19th Bureau are pleased to offer big orders

2025-12-29 13:15:51

China Railway has won a total of 5.5 billion yuan in major projects, demonstrating the strong strength and market competitiveness of central enterprises in the field of infrastructure construction.

Project Name: China Rose Valley New Material R & D and Production Base Project Design-Construction General Contracting/Bid Section Bid Winning Result Announcement

Project Location: Deyang City, Sichuan Province

Bidding conditions of Mianzhu City: The design-construction general contracting/bid section of China Rose Valley New Material R & D and Production Base Project has been approved by the project approval/approval/filing authority. The source of project funds is self-raised funds of 1.68 billion yuan, and the tenderer is Sichuan Hanzhu Construction Engineering Co., Ltd. This project has met the bidding conditions, and the current bidding method is public bidding.

Project overview: The total planned land area of this project is about 38. The main construction contents include: the scheme design and preliminary design of the new R & D and production base building, standardized workshop, prefabricated component production line, installation, fire protection and parking lot, outdoor greening landscape, South Water Pipe Network and production equipment procurement and other related supporting facilities. Construction drawing design and all engineering construction within the scope of construction drawings.

Bid winning information:

Bid winning company: China Railway 24th Bureau Group Southwest Construction Co., Ltd

. Jiangsu Kejia Design Group Co., Ltd.

Bid winning amount: 161104.

Bidding scope: The land area of this project is 4584 The proposed total building area is 357725. 30 square meters, of which the capacity building area is 234291 square meters, the non-capacity building area is 123234. 30 square meters, the building density is ≤ 28%, the green space rate is ≥ 35%, and the building height is ≥ 100 meters (the residential building height is 5.0 meters to 145.95 meters). Plot ratio 5. The construction content includes residential buildings, basement garages, other commercial and public facilities, and the assembly rate meets the requirements of Guangdong Province and Guangzhou City.

Construction period (delivery date): total construction period: 1,120 calendar days (including 1,095 calendar days of construction period).

Maximum bidding price limit (RMB 10,000): 145369. Bid winning information of 189399

:

Bid winning company: China Railway 17th Bureau Group Co., Ltd.

Guangdong Light Textile Architectural Design Institute Co., Ltd.

China Railway 17th Bureau Group Co., Ltd. Group (Guangzhou) Construction Co., Ltd.

Bid price (RMB 10,000): 138243.

Bid winning information:

Bid winning company: No.2 Engineering Co., Ltd.

of China Railway 23rd Bureau Group. Bid winning amount: 110748: RMB 9,600 0 HTML0UN K19 Project name: Dachelingtou Mining Area (Zone 1) Granite Mine Project for Construction, Jiushi Town, Deqing County, Guangdong Province General Contracting and Entrusted Operation (EPC + O) Public Notice of Successful Candidates 0 HTML0 UNK2 0 Construction Location: The mining area is located in the 90 ° direction of the urban area of Deqing County, about 24. Administrative division is under the jurisdiction of Jiushi Town, Deqing County. The geographic coordinates of the center point are: east longitude 112 ° 00 ′ 16 ″, north latitude 23 ° 08 ′ 30 ″. The mining area is connected with X428 county-level cement road by 2.0 km of simple mine road. Along the X428 county-level cement road, Jiushi Town can be reached and connected with G321 National Highway. It is about 32 km away from Deqing County. G321 National Highway to Xijiang Wharf is about 2.0 HTML0 UNK2 1. Construction Scale: The mining reserve is 0.68 million cubic meters of granite 16582 for construction. Sandy kaolin 254. The stripping volume of the mining area is 49.7656 million cubic meters, of which 7.7959 million cubic meters of residual soil are used for mine geological environment restoration and land reclamation greening, 20.1347 million cubic meters of fully weathered granite are washed and processed into construction sand and tail mud as sandy kaolin, 2183. The designed utilization rate of mineral resources is 92.9% for building granite and 99.0% for sandy kaolin ore. The utilization rate of the whole mine including comprehensive utilization resources is 93.

All can be viewed after purchase
Correlation

New Weifang-Suqian High-speed Railway (Yihe New District Section) Project in Yihe New District of Linyi City is located in the territory of Yihe New District. The railway grade is high-speed railway, and the design speed target value is about 350 km/H.

2026-06-30 11:28:05

The project is located in Tianbei Economic and Technological Development Zone of the Seventh Division of Sinkiang Production and Construction Corps, with a total investment of about 3 billion yuan and an area of about 30 mu (about 20,000 ㎡). It is planned to build a new intelligent computing power room of about 6,000 ㎡, equipped with about 600 racks and more than 1,100 high-performance GPU servers, with the target computing power exceeding 1,000 PFLOPS (FP16). The project supports the construction of distributed photovoltaic and energy storage facilities for direct supply of green power to achieve low-carbon green computing power supply.

2026-06-30 10:37:08

Sinochem Second Construction Group Co., Ltd. ranked first with about 965 million yuan, followed by China Chemical Engineering 14th Construction Co., Ltd. and China Construction Installation Group Co., Ltd. with 980 million yuan and 946 million yuan respectively. It is noteworthy that the third China Construction Installation reported about 946 million yuan, the lowest of the three, but ranked the bottom- "the lowest quotation does not win the bid" in the field of chemical EPC once again.

2026-06-30 10:22:05

Inner Mongolia Energy Group announced that Shandong Electric Power Construction Third Engineering Co., Ltd. won the bid at the lowest price of about 583 million yuan for the main part of the 600000 kilowatt coal-fired power project in Baotou Xiguitu Phase II. The three bidding quotations are very close-the second Anhui Electric Power Construction Company is about 980000 yuan, and the third Tianjin Electric Power Construction Company is about 820000 yuan, with the largest gap of only 0.17%. With such a small price difference, any one of the advantages in the overall score is enough to determine the ranking.

2026-06-29 17:02:21

According to the incomplete statistics of the digital new energy DataBM. Com, from June 15, 2026 to June 21, 2026, there are 32 EPC general contracting projects for photovoltaic power plants in China, as well as DB general contracting, optical storage integrated general contracting and other general contracting projects, involving a project scale of 2.629 GW and a total winning amount of 3.94 billion yuan. ......

2026-06-26 15:45:37

The announcement of the bidding results of the EPC project for quality improvement in Zhuangzi Avenue, Mengcheng County, Bozhou City, Anhui Province, was led by Mengcheng Mengdie City Construction Co., Ltd., a local platform company. The consortium composed of the Fourth Engineering Co., Ltd. of China Railway Fourth Bureau Group, Anhui Transportation Planning and Design Institute Co., Ltd. and Anhui Kunyu Architectural Design Co., Ltd. won the bid with about 1.830 billion yuan, which is about 8.5% lower than estimated contract price of 2 billion yuan. The four-party division of labor covers investment and financing, construction, transportation planning and architectural design, which is a typical combination mode of "local platform + central enterprise construction + provincial design".

2026-06-24 14:23:54

China Smelter recently won the bid for nearly 5.5 billion yuan of engineering projects, demonstrating its strong market competitiveness and order acquisition ability in the field of metallurgical construction and infrastructure.

2026-06-23 16:13:47

Recently, the Party Committee of China Railway Construction issued a notice on the adjustment of the leadership of China Railway Construction International Group.

2026-06-23 14:44:45

Wawu Slate Mine Project, Bijiang District, Tongren City, Guizhou Province EPC general contracting and mining (second) bidding results announcement, China Railway 16th Bureau Group Guangxi Construction Co., Ltd. and Zhongyu Engineering Group Co., Ltd. jointly ranked first, China Railway 20th Bureau and China Railway 14th Bureau ranked second and third, all of which are China Railway enterprises. The original text did not disclose the specific quotation of each bidder. The estimated contract price is about 1.8 billion yuan, of which the construction cost is about 22.755 million yuan, the mining cost is about 1.78 billion yuan, and the mining cost is the absolute majority.

2026-06-22 10:12:35

Here comes the list of winning projects.

2026-06-17 11:21:27

Inner Mongolia Zhongze Likun Intelligent Cold Chain Industrial Base is a landmark project for the integration of cold chain logistics and food processing in eastern Inner Mongolia, covering an area of 128 mu, with a total construction area of more than 150,000 square meters, covering seven functional sectors such as comprehensive service center, food processing, automated three-dimensional warehouse and cold chain logistics. Guangxi Construction Metallurgical Construction ranked first with about 807 million yuan, and the quotations of the three candidates were extremely close-the difference between the first and the second Guangxi Construction First Construction (806 million yuan) was only about 810,000 yuan, while the third Shuofang Group (802 million yuan) ranked third with the lowest quotation, and the weight of the comprehensive score played a role again.

2026-06-16 10:52:13

The new site of Shenyang Hunnan District Central Hospital covers an area of about 5.7 hectares, with a total construction area of more than 116,000 square meters, and China Construction Eighth Bureau won the first prize with about 612 million yuan. However, it is noticeable that the second China Railway First Bureau offers only 606 million yuan, which is about 5.12 million yuan lower than that of China Construction Eighth Bureau, but ranks second. Under the comprehensive scoring system, China Construction Eighth Bureau achieves "high price reversal" with the weight of technology and credit. This phenomenon is the same as the recent public construction projects in Beijing and Tangshan.

2026-06-16 10:46:33

Dougezhuang Township, Laozi Chaoyang District, the new hospital area of Beijing Traditional Chinese Medicine Hospital, is an important layout for Beijing's high-quality medical resources of traditional Chinese medicine to the southeast urban area. Beijing Urban Construction Group won the bid for the second bid section at a price of approximately RMB1.101 billion, which was approximately RMB36.88 million lower than estimated contract price of RMB1.138 billion, representing a line sticking rate of approximately 96.8%. With a total construction area of nearly 130,000 ㎡ and a construction period of 859 days, it is a large-scale public medical construction project.

2026-06-16 10:40:45

China Railway Construction Corporation, China Electric Power Construction Corporation, China Railway and China Communications Construction Corporation, with a total quotation of 12.024 billion yuan for the four bidding sections. The total length of Guangzhou section is 44.2 kilometers (all underground, 10 stations and 1 section), which is the backbone of the Guangdong-Hong Kong-Macao Greater Bay Area intercity railway network.

2026-06-16 09:31:14

Yongbei irrigation area is the backbone project of large (2) irrigation area in Guangxi, with a designed irrigation area of 1.49 million mu and a water supply population of more than one million. The east main pipeline section covers 33.4km of main pipeline and 43.76km of branch pipeline. The Fourth Hydropower Engineering Bureau joined hands with China Power Construction Road and Bridge to rank first with about 1.6 billion yuan, but the second Guangxi Hydropower Engineering Bureau + Gezhouba + China Construction Eighth Engineering Bureau consortium offered a lower price (1.592 billion yuan), the Fourth Hydropower Engineering Bureau won the bid with a higher price, and the water conservancy professional credit and technical scheme weight under the comprehensive scoring system won decisively. The construction period is nearly 6 years (68 months), which is one of the longest bidding sections in recent water conservancy projects.

2026-06-15 13:14:27

This project is the key complementary chain project of the green steel deep processing industry chain in Guangxi. The EPC of the first phase of the intelligent wire mesh industrial park, which covers an area of more than 500 mu and has a total construction area of more than 250,000 square meters, has been awarded to the four-enterprise consortium led by China Railway Beijing Engineering Bureau, with a quotation of about 2.642 billion yuan. The consortium integrates the main force of China Railway Construction, Guangxi local rock and land exploration enterprises and the First Design Institute of China Machinery, and the whole chain of survey-design-procurement-construction is closed, matching the high-standard whole process requirements of industrial park construction.

2026-06-15 13:10:34

Tianjin Tiankai Higher Education Science and Technology Park Jinnan Park Northern District Urban Renewal Section 1 was led by Tianjin Company of China Jiaotong First Public Bureau, which ranked the first candidate with about 585 million yuan. The difference with the second China Railway First Bureau (584.86 million yuan) is only 58000 yuan, and the difference with the third Tianjin Xinyu (584.82 million yuan) is only 17000 yuan. The three quotations are extremely concentrated in the range of 584.8 million yuan, with a difference of less than 1 ‰, which is one of the most sticky urban renewal bidding sections in recent years.

2026-06-15 11:29:14

The Shanghai Baoye Group, together with its Baoye (Beijing) Construction Technology Consortium, ranked as the first candidate for Bid Section II of the Urban Village Reconstruction and Resettlement Housing in Kandan Street, Fengtai District, Beijing, with a price of about 638 million yuan, about 1.91 million yuan ahead of the second-place China Railway 19th Bureau (639 million yuan), and the competition is quite close. It is worth noting that the total investment of the project marked in the text is about 195.5 million yuan, while the quotation of this bid section has reached 638 million yuan. There is a significant difference between the total investment figure and the quotation of the bid section. It is suspected that the original data caliber is different (or the total investment only refers to a certain subdivision of the construction and installation fee).

2026-06-15 11:14:01

Recently, China Energy Construction Co., Ltd., a subsidiary of China Energy Construction Co., Ltd., China Energy Construction Group Guangdong Thermal Power Engineering Co., Ltd., and China Energy Construction Group Guangdong Electric Power Design and Research Institute Co., Ltd. The project company formed with Saudi Al Jumeirah Energy & Water Company (AL JOMAIH ENERGY AND WATER COMPANY) and SEMBCORP TAWEELAH C PTE. LTD. Co., Ltd.

2026-06-11 10:02:38

Digital New Energy DataBM. Com found that since 2026, many companies under China Electric Power Construction have issued solemn statements, all of which are related to the anti-counterfeiting of photovoltaic projects.

2026-06-08 09:08:41

A few days ago, China Power Construction Guizhou Company issued a statement, saying that illegal elements used the name of its Yangchun Wenhui 300 MW parity agricultural-photovoltaic complementary photovoltaic power generation project to carry out illegal fund-raising, signing false contracts and other illegal acts.

2026-06-06 10:30:07

Digital New Energy DataBM. Com was informed that on June 2, the successful candidate of the 600000 kilowatt photovoltaic sand control project (EPC) in Xinlong Kaisheng Yecheng County, Xinjiang, was announced.

2026-06-05 09:14:19

The 300,000-ton functional paper-based and auxiliary materials construction project (EPC) in Tai'an City mainly includes the electronic grade chemical pulp area and the sewage area: (I) Electronic grade chemical pulp area: the area covers an area of about 130,000 square meters. It covers the construction of all buildings, structures, equipment foundations, pipelines, roads, greening and other ancillary projects in the region. After completion, it needs to have the production function of electronic grade chemical pulp to meet the core capacity needs of the project. (II) Sewage area: The area covers an area of about 25,000 square meters, covering the decoration and fitment of buildings and structures, water and electricity installation, and equipment foundation construction in the area.

2026-06-04 14:43:36

EPC of Wuhu Jiangbei New Area Intelligent Network Auto Parts Industrial Park falls into the cross-border consortium of "Central Enterprise + University Design Institute". China Chemical Third Construction leads the construction of industrial plants, China Railway Third Bureau guarantees municipal supporting facilities, and Hefei University of Technology Design Institute injects automotive engineering discipline genes-the tripartite division of labor precisely fits the industrial attributes of the project, which has more professional barriers than pure construction schemes of traditional housing construction giants. This combination also reflects that the bidding of industrial parks is tilting towards "builders who understand industry".

2026-06-04 14:41:03

The project is a benchmark project to promote agricultural modernization in Heyang, a large agricultural county in Shaanxi Province, and the Northwest Company of China Railway Construction Bridge Bureau won the first prize with 1.444 billion yuan. What is rare is that the quotation of Northwest Company of China Construction Eighth Bureau is exactly the same as that of the first place (1,444,311,600 yuan), but it ranks third because of the comprehensive evaluation ranking-quotation is no longer the only pass, and the weight of technical scheme and performance accumulation in the tiny competition is rising.

2026-06-04 14:22:10

China Construction Third Engineering Bureau, together with Zhongnengjian Xinjiang Electric Power Design Institute, ranked the first candidate of 200 MW photovoltaic EPC in Wuxiang with about 551 million yuan, and the competition was extremely sticky-the third China Railway Fourth Bureau Consortium was only about 60000 yuan lower, and the first advantage was almost negligible. The project covers an area of 7000 mu and is planned to be connected to the grid with full capacity by the end of 2027. It is a large mountain photovoltaic base in Changzhi, Shanxi Province.

2026-06-04 13:57:12

On June 2, the EPC successful candidate of Xinlong Kaisheng Yecheng County 600MW Photovoltaic Sand Control Project was announced. The first successful candidate was Southwest Engineering Co., Ltd. of China Railway 15th Bureau Group/consortium: Shandong Environmental Energy Design Institute Co., Ltd., with a unit price of 2.539 yuan/W.

2026-06-04 10:30:15

The announcement shows that the top three successful candidates are Tianjin Cement Industry Design and Research Institute Co., Ltd., Chengdu Building Material Industry Design and Research Institute Co., Ltd., China Railway 19th Bureau Group First Engineering Co., Ltd., and Anhui Conch Building Material Design and Research Institute Co., Ltd.

2026-06-03 14:16:21

"In the past, we exported cement to Hainan mainly by road to sea, with many intermediate links and high costs, not only cumbersome procedures, but also prone to loss of goods.". The "one single system" scheme introduced by the railway can reduce the cost of transportation, management and time, which saves both worry and money. Fang Xuyuan, head of Chongzuo Red Lion Cement Co., Ltd., commented.

2026-06-02 10:46:16

The new Suxiang Land 2025-WG-45 plot project in Xiangcheng District has completed the general contracting (EPC) bid evaluation, and the bid evaluation results were announced on the Suzhou Public Resources Trading Platform on May 14.

2026-05-27 15:35:20

Yanling New City Life and Health R & D and Production Base Project is located in Dongxihu District of Wuhan City, which is a R & D and production base project in the field of life and health. The project includes supervision services in the whole process of construction and warranty stage, as well as general contracting of survey, design and construction (the first bid section). The planned construction period of the project is 2190 days, with a total construction area of about 474000 square meters, including the construction of a large health industry base and a digital intelligent brewing production center.

2026-05-26 13:26:11

The EPC general contracting of the project with an annual output of 300,000 cubic meters of aldehyde-free straw board recently announced that the consortium of the Fourth Engineering Co., Ltd. of China Railway 25th Bureau Group and Beijing Sino-foreign Construction Architectural Design Co., Ltd. won the bid with * * 853.5997 million yuan (about 854 million yuan) * *. The project is located in Linshu County, Linyi City, with a total investment of about 1.2 billion yuan, a total area of 260 mu and a total construction area of more than 175,000 square meters. It will build an integrated green building material production base including R & D building, main production workshop, raw material warehouse and deep processing workshop.

2026-05-26 11:45:06

A total of five bidding sections of the first and second phases of the Yunmengshan Sports Training Base Project in Shandong Province have been announced recently. China Railway Construction Bridge Engineering Bureau has won the first bid of the first phase and the first bid of the second phase (totaling about 603 million yuan), and MCC Transportation Construction has won the third bid of the first phase and the third bid of the second phase (totaling about 622 million yuan). CCCC Construction Group won the second bid of Phase II (about 598 million yuan). The three enterprises divided up all the winning qualifications, and the total quotation of the five bidding sections was about 1.823 billion yuan. The project covers an area of 600 mu, with a total construction area of 310,000 square meters. It is a large-scale comprehensive sports training base in Shandong Province.

2026-05-26 11:36:36

Renovation and Reconstruction Project of Main Water Supply Pipe in the Main Urban Area of Haikou City (Phase I) (Construction)

2026-05-25 14:21:06

Announcement of Bidding Results of Bid Section 1 of Urban Renewal Project in Northern Area of Tiankai Higher Education Science Park Jinnan Park

2026-05-25 13:58:52

Core Power Science and Technology City Project Design and Construction General Contracting (Bid Section III) recently announced the successful candidates. The consortium formed by China Railway Eighth Bureau Group and Shenzhen Huayang International Design ranked first with a quotation of about 1.662 billion yuan, and the gap with the second and third places (about 1.660 billion yuan) was less than 2 million yuan. The competition was extremely fierce. The construction land of the third bid section is about 67,800 square meters, and the capacity building area is about 197,500 square meters. It will build a single headquarters, apartments, commercial, office and dormitory space, which is a typical project of "integration of production and city" in Wanqingsha Bonded Port Manufacturing Park, Nansha, Guangzhou.

2026-05-25 13:42:53

In the pre-bid announcement of the franchise tender for the Qingdao section of the Laizhou-Qingdao Expressway, the "China Construction Department" four-party consortium led by China Construction Co., Ltd. ranked first with a comprehensive score of 96.56 points (much higher than second 80.46 points), with a toll period of 298 months (about 24.8 years). The main line of the project is 83.119 kilometers long, adopting the franchise mode, and the winning consortium will be responsible for the whole process of investment and financing, construction, operation, maintenance and transfer.

2026-05-22 13:16:10

The successful candidates for the construction of the section of the China-Kyrgyzstan-Uzbekistan Railway in the Kyrgyz Republic were announced recently. The consortium of China Railway Fifth Bureau won the first place in the standard rail section (ZJWPJ-1, about 580 million yuan), and the 11th Bureau of China Railway won the first place in the broad rail section (ZJWPJ-2, about 440 million yuan), with a total bid amount of about 1.02 billion yuan. The total length of the line is 304.8 km, and the ratio of bridge to tunnel is as high as 39% (104.1 km/29 tunnels), which is the key section of the Central Asian international transport corridor, and is also the construction of the Central Asian Railway after China Railway Construction started bidding at the end of 2025.

2026-05-22 09:59:43

Inner Mongolia Jincai Mining Wulate Middle Banner Gaoletu Mining Area Crystalline Graphite Mine Construction Project successful candidates recently announced that China Railway Seventh Bureau Group Co., Ltd. ranked first with a quotation of about 2.384 billion yuan, beating China Railway Shanghai Engineering Bureau (about 2.381 billion yuan) and China Railway Tenth Bureau Qingdao Company (about 2.376 billion yuan). The gap between the three quotations is very small. The project is a rare super-large crystalline graphite mine development project in China in recent years, with ore resources exceeding 310 million tons and an average grade of about 5.45%, which is of great significance to ensure the supply chain security of strategic emerging industries such as new energy automotive power batteries.

2026-05-20 13:25:14

The student dormitory construction project of Longshan Campus (Innovation Port) of Shandong University has made great progress recently. The general contracting of A3/B1 group dormitory project and the general contracting of supporting road project on the west side have both been awarded, with the total bid amount exceeding 3 billion yuan. The project is located in Shengjing Plot on the west side of Xiuyuan River, Zhangqiu District, Jinan City, with a total construction area of 461,200 square meters and a planned construction period of 730 calendar days. The whole process integration mode of EPC is adopted. The consortium of "Central Enterprise + Design Institute + Local Main Force" led by China Railway 14th Bureau won the main dormitory bid (about 2.930 billion yuan), and Jinan Municipal Group and Shanghai Municipal General Institute won the bid.

2026-05-20 13:23:17

Guangzhou Nansha 2024NJY-5/6 Plot Project Phase II Survey, Design and Construction General Contracting (EPC) recently announced that seven consortia led by China Railway 17 Bureau Group won the bid with about 2.084 billion yuan. The project is located in the core area of Nansha, with a total construction area of about 285,000 square meters, and will create a scattered urban skyline including 150 meters of landmark super high-rise buildings, which is a key public construction project in the construction of Guangdong, Hong Kong and Macao Comprehensive Cooperation Demonstration Zone. The consortium has a strong line-ups, which integrates the main construction force of central enterprises, local survey and top design.

2026-05-20 13:21:42

China Railway Construction Corporation (CRCC) reported another success in the overseas market. The 18th Bureau of China Railway successfully won the bid for the new engineering facilities project of Emirates Airlines Dubai World Central Airport, with a contract value of about 17.5 billion dirhams (equivalent to about 32.394 billion yuan), setting a new record for the single contract value of overseas projects of the 18th Bureau of China Railway. The project will build a civil aviation maintenance hangar cluster with the largest scale, the highest technical level and the most complex system integration in the world, with a total construction area of 1.21 million square meters (about 170 football fields), including 8 large maintenance hangars and 2 painting hangars, which can provide 28 wide-body aircraft at the same time.

2026-05-20 13:09:39

The consortium of China Railway No.4 Engineering Group Co., Ltd. and the MCC17 Group won the bid for the Huashan Side Construction of the Hubei Road River-Crossing Passage Project in Maanshan City with a price of about RMB 1.156 billion. The project is the third river-crossing channel in Ma'anshan, with a single tunnel length of more than 5.96 kilometers, which is the longest river-crossing tunnel in Wanjiang area. The project uses shield method to cross the main channel of the Yangtze River, which is technically difficult and requires high underwater tunnel construction capacity of the construction party.

2026-05-20 11:59:46

Recently, China Railway Construction's 11th Bureau, 14th Bureau and 17th Bureau of China Railway have won three large-scale projects in Guangdong, Shandong and Fujian, with a total winning bid of about 7.175 billion yuan.

2026-05-20 10:20:32

During the discussion, the two sides reached a number of consensus through in-depth exchanges on centralized procurement of cement materials, coordinated landing of supply chain, material supply of engineering projects, and tracking of key projects.

2026-05-19 09:59:10

Tianhe District Changcun Urban Village Reconstruction Project AT0211018 Plot (CB-20 Plot) General Contracting of Survey, Design and Construction

2026-05-18 16:57:29

New developments have been added to the construction of Guangdong-Hong Kong-Macao Greater Bay Area. Recently, the bidding results of Guangzhou Nansha 2024NJY-5 and 2024NJY-6 Block Project Phase II Survey, Design and Construction General Contracting (EPC) were officially announced, and the "Railway Construction Consortium" led by China Railway 17 Bureau Group Co., Ltd. won the bid with a quotation of 2.084 billion yuan.

2026-05-18 16:56:55

On May 8, a railway freight train loaded with 750 tons of bulk cement departed from the special line of Yongan Jianfu Cement Co., Ltd. at Yongan Kengbian Station in Fujian Province. After arriving at Qianchang Station via Yingxia Railway, it arrived at Xiamen Lute Building Material Mixing Station by means of "railway-highway" intermodal transport without changing boxes. This marks the opening of a new mode of "railway tank container through" for bulk cement transportation in Fujian Province, eliminating intermediate warehousing links, and becoming a typical case of upgrading the supply chain in the infrastructure industry.

2026-05-11 13:22:45

Located in Putian City, Fujian Province, the Urban Renewal Project of Zhongtan Area in Putian City covers a total land area of about 1,200 mu, with a total planned construction area of about 200,600 square meters, of which the above-ground construction area is about 130,800 square meters and the underground construction area is about 69,800 square meters; The main body of the project includes about 9.59 kilometers of municipal roads, public facilities and commercial and residential complexes. The owner is related enterprises in Zhongtan, Fujian Province. The project has been approved by Fujian Development and Reform Preparation [2025] B. The construction funds are raised through multiple channels.

2026-05-11 10:45:43

According to the data center of China Cement Market, this week, Sichuan, Chongqing, Yunnan and Guizhou were affected by overcast and rainy weather, construction slowed down and cement demand was weak. Prices in Sichuan and Chongqing fell back after being pushed up, with some regions falling; the low-price competition in Yunnan and Guizhou intensified, with a reduction of 30 yuan/ton in Northwest Yunnan, and the capacity utilization rate in Guizhou was only 2-3%.