
of June 29, Tianrui Shallow Well Cement Contract Energy Management Source Network Load Storage Integrated Photovoltaic Power Generation Project ushered in a key node. Under the strict verification of the power grid company and the internal joint team, the project passed all the special acceptance before grid-connected at one time, and formally obtained the "pass" for grid-connected operation. This indicates that the project has fully met the grid-connected conditions and is about to enter the substantive operation stage. In the process of

acceptance, the standards and specifications for grid access and the relevant requirements for the construction of new energy projects were strictly followed, and the working group carried out technical checks on the core links of grid-connected cabinet equipment, relay protection system, accuracy of metering devices, cable laying technology and on-site safety protection measures. After comprehensive evaluation, the technical parameters, equipment performance indicators and safe operation ability of the project all meet the grid-connected operation standards, and the acceptance conclusion is one-time qualified.
As a key component of the demonstration project of source-network-load-storage integration, the photovoltaic sub-project will significantly increase the self-sufficiency ratio of green and clean energy in the plant area after putting into operation, and achieve the multiple objectives of energy saving and cost reduction, peak shaving and valley filling, and optimizing load regulation through the mode of "self-use and surplus electricity access to the Internet", so as to achieve the goal of energy saving and cost reduction. Energy structure optimization and carbon emission intensity reduction lay a solid foundation for the company's green, low-carbon and high-quality development. It is worth mentioning that the project has become the first benchmark project in the integrated layout of source, network, load and storage within the group, and has important demonstration and leading significance.
The successful acceptance is not only the result of the hard work of the project team, but also a solid step for Yuzhou Shallow Well Company to implement the "double carbon" strategy and promote energy transformation. The company will take this opportunity to continuously deepen the development and utilization of clean energy and inject new green momentum into the high-quality development of the group.
浙公网安备33010802003254号