On April 28, the public tender announcement of EPC general contracting procurement project of Pengshui Zhufo Photovoltaic Project of China Power Construction New Energy Company was issued, and the tenderer was Chongqing Pengshui Juhui Lizhi New Energy Co., Ltd.

The tender announcement shows that Pengshui Zhufo Photovoltaic Power Generation Project is located in Sangzhe Town, Lujiao Town and Zhufo Township, Pengshui Miao and Tujia Autonomous County, Chongqing. The rated capacity of the project is 126 MW, the installed capacity is 154.91 MWp , the capacity ratio is 1.23, 247,856 monocrystalline silicon modules are installed, and the site is mountainous terrain. The total area of the project is about 2578.64 mu.
The bidding scope includes the EPC general contracting of photovoltaic field area, power collection line and 220kV booster station (including the lapping work from the outgoing line frame of the booster station to the communication and power line of the first base tower of the transmission project, excluding the transmission project). The specific scope includes but is not limited to: preliminary special handling; All land requisition (occupation) lease and compensation work except for the cultivated land occupation tax and urban land use tax paid by the tenderee for permanent land requisition and long-term lease, and bear the corresponding costs; be responsible for the design review, construction certificates and approval documents related to the construction project, and bear the corresponding costs; Survey, measurement, design (including budget estimate and budget) and as-built drawing of engineering design, preliminary design and construction drawing stage; equipment and material procurement (except PV module procurement), manufacturing supervision, transportation and management, etc., and the Employer is responsible for the manufacturing supervision, inspection, unloading and management of the purchased equipment; Construction preparation and construction; installation and commissioning of all equipment, etc.
This tender requires bidders to have good business reputation, financial status and corresponding qualifications. In terms of performance, one 100MW and above photovoltaic power generation project (including 220kV and above booster station) EPC has been completed or is being implemented in the past five years (from 2021 to now). Performance of general contracting project or general contracting project of photovoltaic power generation engineering construction. Consortium bidding is accepted
in this tender. The deadline for submission of
bidding documents (bidding deadline) is 9:00 on May 19, 2026 (Beijing time).