The Digital New Energy DataBM. Com was informed that on March 16, the Bureau of Ecology and Environment of Wenshan Prefecture, Yunnan Province, issued a public announcement on the acceptance of the environmental impact report form for the Maidishong photovoltaic power generation project.
According to the announcement, Maidichong Photovoltaic Power Generation Project is a new project, located in Pingyuan Town, Yanshan County, Wenshan Prefecture, Yunnan Province, and is constructed by Yaochuang Yanshan New Energy Co., Ltd. with a total investment of 32879 73000 yuan . The AC side of

the project is planned to have an installed capacity of 80MW , and 710 Wp monocrystalline silicon N-type photovoltaic modules are planned to be used . A total of 28 PV modules , 2 (rows) × 14 (columns), form a string unit, totaling 5000 groups.
The project plans to install 140000 photovoltaic modules , consisting of 5000 brackets and 30 photovoltaic arrays. Among them, there are 10 3520kW square arrays, 4 3200 kW square arrays, 2 2880kW square arrays, 3 2240kW square arrays, 9 1920 kW square arrays, 1 1280 kW square array and 1 960 kW square array. No new booster station will be built in
this project . It is planned to add a main transformer with a scale of 160MVA in the built 220kV Hongshiyan booster station. Other buildings and office buildings will rely on Hongshiyan booster station. The total construction period of the
project is 12 months . It is planned to start construction in June 2026 and complete construction in June 2027.
浙公网安备33010802003254号