2.78 billion! CCCC Second Harbor Engineering Co., Ltd., CCCC Fourth Harbor Engineering Co., Ltd., CCCC Second Highway Engineering Co., Ltd. and CCCC First Harbor Engineering Co., Ltd. won the bid for

2025-11-17 15:16:25

CCCC's four bureaus jointly won the bid for a new project of 2.78 billion yuan, demonstrating the group's strong comprehensive strength and market competitiveness.

Project name: 148R2 Commercial (Phase I) Project EPC First Bid Section

This tender is for the 148R2 Commercial (Phase I) Project. The project covers an area of about 130 mu, with a total construction area of about 172,000 square meters. It is planned to be constructed by stages. The bidding scope is to provide design (including scheme design optimization, preliminary design and construction drawing design, etc.), procurement and engineering construction general contracting services for the project EPC. The actual contract scope shall be subject to the design assignment entrusted by the Employer or provided by the Employer.

Project location: Plot

148R2, Jingkai Avenue, Junshan Street, Wuhan Economic and Technological Development Zone Bid winning information:

First place: Zhongnan Architectural Design Co.,

Ltd. of CCCC Second Harbor Engineering Co., Ltd

. Tender offer of China Shipbuilding Engineering Co., Ltd.

(RMB 10,000) 107572. Second place in the 958581

: China Communications Construction Group Co., Ltd.

Tender offer of China Shipbuilding International Engineering Co., Ltd.

(RMB 10,000) 107630. 1631520H TML0 107619 1 No.3: Wuhan Construction Engineering Group Co., Ltd. 0 HTML0 UNK1 2 Bid Price (RMB 10,000) UNK1. 0869370 HTML0 UNK1 3 Project Name: National Jiedong Economic and Technological Development Zone High-speed Railway Area Infrastructure Construction Project (Bid Section 1) 0 HTML0 UNK1 4 Construction Location: Guangzhou Jiedong Economic and Technological Development Zone, Jieyang City, Guangdong Province, connects the high-speed railway hub of Jieyang Station, covering the core industrial area of the development zone 0 HTML 0 high-speed rail 5 Construction scale: the total mileage is about 9.08 kilometers, the core construction is the west extension line of Linjiang North Road (6.78 kilometers long, 60 meters wide, two-way 8 lanes), the upgrading and transformation of the entrance Avenue (2.3 kilometers long, 45 meters wide, Two-way 6 lanes), supporting the construction of 32 kilometers of rainwater pipe network, 28 kilometers of sewage pipe network, 86000 square meters of greening projects and traffic lights, lighting and other facilities. 0 HTML0 UNK1 6 Technical standard: urban trunk road standard, the design speed is 60 kilometers per hour, the pavement is asphalt concrete structure, and the bridge design load is city-a level. 0 HTML0 UNK1 7 The total investment of the project is about 800 million yuan, and the construction amount of this section accounts for 40.4% 0 HTML0 UNK1 8 The construction period is 540 calendar days (18 months), and it is planned to open to traffic in 2027. 0 HTML0 32314 9 Bid Winning Information: 0 HTML0 UNK2 0 Bid Winning Unit: CCCC Fourth Harbor Engineering Co., Ltd. 0 HTML0 UNK2 1 Bid Winning Amount: RMB 323,148,500 0 HTML0 UNK2 2 Project Name: Expropriation (Relocation) and Resettlement of Plot 73-04, Unit MHP0-1403, Huacao Town, Minhang District Housing Project (excluding pile foundation)-Announcement of Successful Candidates 0 HTML0 UNK2 3 Construction Scale: The total construction area is about 278,700 square meters (about 197,100 square meters above ground and about 81,600 square meters underground), 21 high-rise residential buildings of 16-17 floors will be constructed, and the total number of households is 2,369. Supporting community service centers, kindergartens and underground garages, with a plot ratio of 2.05 and a green space ratio of 35%. Scope of Bid Section 4 of 0 HTML0 UNK2: all construction contents except pile foundation, including civil structure, decoration, water supply and drainage, electricity, fire protection, heating and ventilation and outdoor supporting works. 0 HTML0 00000 5 Bid winning information: 0 HTML0 UNK2 6 First candidate bid winner: Dongmeng Engineering Co., Ltd. of CCCC Second Highway Engineering Co., Ltd. 0 HTML0 UNK2 7 Bidding price (RMB 10,000) 134010. UNK2 0 HTML0 UNK2 8 Second candidate bid winner: No.3 Engineering Co., Ltd. of CCCC Second Highway Engineering Co., Ltd. 0 HTML0 UNK2 9 Bid price (RMB 10,000) 135336. 92910 HTML0 135403 0 Third Candidate Successful Bidder: The Fifth Engineering Co., Ltd. of CCCC Second Highway Engineering Co., Ltd. 0 HTML0 UNK3 1 Bid price (RMB 10,000) UNK3. 45070 HTML0 UNK3 2 Project name: Yalu River Waterway Wharf Construction Project 0 HTML0 UNK3 3 Construction site: Linjiang City, Jilin Province, about 86 km upstream of Yunfeng Dam on the Yalu River. 0 HTML0 UNK3 4 Construction Scale: 10 berths will be arranged for the Yalu River Linjiang Channel Wharf Construction Project, including 3 berths for operation ships berthing at the wharf in the operation area, 5 berths for working ships berthing at the wharf for working ships, 2 berths for small ships berthing at the inner side of the anti-icing jetty, 1 ship landing maintenance slipway, 1 anti-icing jetty and 156.4m revetment. Corresponding harbor basins, land storage yards, access roads and supporting facilities will be constructed. The main supporting facilities include temporary duty room, power supply and lighting, water supply and drainage, fire fighting, communication and navigation, control, etc. 0 HTML0 UNK3 5 Planned construction period: The construction period is expected to be 550 calendar days. The planned commencement date is November 30, 2025. The specific commencement date is subject to the supervisor's notice. 0 HTML0 UNK3 6 Bidding scope: Yalu River Linjiang Channel Wharf Construction Project, including 10 berths, including 3 berths for operation ships berthing at the operation area, 5 berths for working ships berthing at the working ship wharf, and 2 berths for small ships berthing at the inner side of the anti-icing jetty; 1 ship landing maintenance slideway, 1 anti-icing jetty and 156.4m revetment; construction of corresponding harbor basin, land storage yard, access road and supporting facilities. The main supporting facilities include temporary duty room, power supply and lighting, water supply and drainage, fire fighting, communication and navigation, control, etc. 0 HTML0 UNK3 7 Bid winning information: 0 HTML0 UNK3 8 First place: CCCC First Harbor Engineering Co., Ltd. 0 HTML0 UNK3 9 Bid price (RMB) 42882751.560 0 HTML0 UNK4 0 Second place: CCCC Second Harbor Engineering Co., Ltd. 0 HTML0 UNK4 1 Bid price (RMB) 4 3349810.250 HTML0 UNK4 2 Third place: Hunan Navigation Engineering Co., Ltd. 0 HTML0 UNK4 3 Tender price (yuan) 41668003. 0 10 HTML0 UNK4 4

All can be viewed after purchase
Correlation

Several engineering bureaus under China Railway have won a total of 10.5 billion yuan in major projects, demonstrating their strong strength and market competitiveness in the field of infrastructure.

2025-12-18 09:05:44

Five subsidiaries of CCCC jointly won the bid for the 1.33 billion yuan project, demonstrating its strong strength and synergistic advantages in the field of infrastructure construction.

2025-12-18 09:05:39

China Railway's seven major engineering bureaus won the bid for major projects with a total amount of 5.7 billion yuan, demonstrating its strong strength and market dominance in the field of infrastructure.

2025-12-18 09:05:33

5.86 billion yuan won the bid for five major highway projects, reflecting the sustained development of infrastructure and boosting regional transportation upgrading and economic development.

2025-12-17 17:23:22

The Digital New Energy DataBM. Com was informed that on December 16, the successful candidates for the 1.6 million kilowatt photovoltaic power generation project (the first bid section) in Tori County, Tacheng, Xinjiang, were announced.

2025-12-17 11:42:46

The total amount of winning bids for 10 highway projects exceeded 15.9 billion yuan, covering a number of key areas, highlighting the sustained development of transportation infrastructure and promoting regional connectivity and economic development.

2025-12-16 10:38:42

CCCC First Highway Engineering Co., Ltd. won the bid of 1.58 billion yuan and CCCC Second Harbor Engineering Co., Ltd. won the bid of 430 million yuan, reflecting the strong strength and market leading position of CCCC Group in the field of infrastructure.

2025-12-16 10:38:30

The successful bidding of the new Bomi-Ranwu Railway Project marks new progress in the construction of the Sichuan-Xizang Railway Corridor and will effectively enhance the traffic capacity of the eastern part of the Xizang.

2025-12-16 10:38:25

Weifang-Zoucheng Expressway won the bid of 9.4 billion yuan, which will promote regional traffic upgrading and economic development.

2025-12-16 10:37:57

CCCC First Harbor Engineering Co., Ltd. and CCCC Second Harbor Engineering Co., Ltd. won the bid for two major projects respectively, demonstrating their strong strength and market competitiveness in the field of transportation infrastructure construction.

2025-12-12 14:40:02

The announcement of the bidding results of the three highway projects involves a number of enterprises, reflecting the sustainable development of the infrastructure sector and the further improvement of the regional transportation network.

2025-12-12 14:39:55

Several engineering bureaus under China Railway Construction have won a total of 8.15 billion yuan in major projects, demonstrating their strong strength and market competitiveness in the field of infrastructure.

2025-12-12 14:39:37

CCCC Third Highway Engineering Co., Ltd. won the bid for the 1.28 billion yuan industrial park project in Xinjiang, demonstrating its strength in the field of infrastructure construction and boosting regional economic development.

2025-12-12 14:39:17

Fifty-five major projects were announced, led by infrastructure giants such as China Railway, China Railway Construction and China Communications, highlighting the leading position of central enterprises in the field of infrastructure.

2025-12-11 14:01:10

China Railway Construction has recently won a number of major projects with a total amount of 16.6 billion yuan, demonstrating its market competitiveness and leading position in the industry.

2025-12-04 09:11:52

The successful bidding of 4 billion yuan of major projects highlights its market competitiveness and industry status, and is expected to promote performance growth and business expansion.

2025-12-04 09:11:10

Several engineering bureaus under China Railway have won the bid for major projects with a total amount of more than 2.7 billion yuan, demonstrating their strong competitiveness and market dominance in the field of infrastructure.

2025-12-02 16:40:13

CCCC Fourth Harbor Engineering Co., Ltd. successfully won the bid for the 360 million yuan wharf project, demonstrating its strength and competitiveness in the field of port construction.

2025-12-02 16:40:03

On November 26, the bidding results of the 1.6 million kilowatt photovoltaic power generation project (Section III-Section VII) in Tori County, Shangdian Power, Tacheng, Xinjiang were announced. The third bid section of the project was won by China Nuclear Industry Zhongyuan Construction Co., Ltd. with 330 million yuan.

2025-11-28 11:32:07

Several construction enterprises won the bid for eight major projects in Beijing, totaling 7.8 billion yuan, highlighting the leading position of state-owned enterprises in urban construction.

2025-11-26 14:59:23

Enterprises in Guangdong, Hebei and other provinces have won more than 13.6 billion major projects, covering infrastructure, energy and other fields, highlighting regional economic vitality and investment enthusiasm.

2025-11-26 14:59:15

The winning bid amount of the enterprise exceeded 9.7 billion yuan, showing a strong momentum of development and a substantial increase in market competitiveness.

2025-11-26 14:59:07

Several engineering bureaus under China Railway have won the bid for major projects with a total amount of more than 8.6 billion yuan, demonstrating their strong strength and market dominance in the field of infrastructure.

2025-11-26 14:58:39

Several engineering bureaus under CCCC jointly won the bid for 4.08 billion yuan of major projects, demonstrating their strong strength and synergistic advantages in the field of large-scale infrastructure construction.

2025-11-26 14:58:28

Chinese enterprises have made frequent breakthroughs in overseas orders, and Chinese enterprises have won more than 4.9 billion yuan in major projects, highlighting the strong competitiveness in the field of infrastructure and the effectiveness of international expansion.

2025-11-26 14:43:22

(1) Chengdu-Chongqing Middle Line Tongliang Passenger Transport Integrated Hub Connection Line Project (Project Category: Highway Engineering): This project is a new first-class highway with a total length of 3.91 kilometers, including a medium bridge with a length of 58 meters. The starting point of the project is near Liangjiakou Courtyard, Nancheng Street, Tongliang. It connects with the national highway G319 at Tongan Expressway, passes through Songlinggang and Dongdian Village, and at K3 + 000 ~ K3 + 450, it is close to Tongliang Passenger Transport Hub Square, the high-speed rail of Chengdu-Chongqing Middle Line under construction. Then it crosses the current Shiqing Road through Zhoujiayuanzi to the southeast, and ends near Jinyuan Village, Qinglong Town.

2025-11-24 09:39:36

S212 Zhijin County Daying-Chadian Highway Rerouting Project starts near Heima Technology, Dachong Group, Luojiazhai, Daying Village, Chadian Township, and ends near Shangba Group to connect with Provincial Highway S212; the total length of the route is 4.616 km, of which the main line is 3.980 km long and the connecting line of Coal Chemical Avenue is 0.636 km long; The main line is constructed according to the standard of Class I highway, with a subgrade width of 28.5m, a design speed of 60km/H, and a vehicle load grade of Class I highway; the connecting line of Coal Chemical Industry Avenue is constructed according to the technical standard of Class II highway, with a subgrade width of 12m, a design speed of 60km/H, and a vehicle load grade of Class I highway.

2025-11-24 09:39:29

Chongqing won the bid for more than 5.3 billion yuan of expressway projects, highlighting the continuous promotion of its infrastructure construction and boosting regional traffic upgrading and economic development.

2025-11-21 11:16:32

CCCC First Highway Engineering Co., Ltd. and CCCC Fourth Harbor Engineering Co., Ltd. won the bid for two major projects respectively, demonstrating their strong competitiveness and leading position in the field of infrastructure construction.

2025-11-21 11:16:27

Several subsidiaries of CCCC won the bid for five projects, covering infrastructure, water conservancy and other fields, highlighting the overall synergy advantages of the Group.

2025-11-21 11:16:22

Four highway projects have won the bid one after another, marking the continuous progress of infrastructure construction, highlighting the competitiveness of enterprises and the vitality of regional development.

2025-11-21 11:15:12

Zhejiang successfully won the bid for 700 million yuan of major projects, demonstrating its strong strength and competitive advantage in infrastructure construction and economic development.

2025-11-17 15:16:38

CCCC's four bureaus jointly won the bid for a new project of 2.78 billion yuan, demonstrating the group's strong comprehensive strength and market competitiveness.

2025-11-17 15:16:25

Several China Railway Engineering Bureaus have won more than 1.3 billion yuan in major projects, demonstrating their strong competitiveness and market dominance in the field of infrastructure construction.

2025-11-14 10:08:54

CCCC First Harbor Engineering successfully won the bid for the wharf project, demonstrating its comprehensive strength and competitive advantage in the field of port construction.

2025-11-14 10:08:23

China Jiaotong Second Navigation Bureau, China Jiaotong First Public Bureau and Sichuan Highway jointly won the bid for a highway project with a Xizang of more than 6.4 billion yuan, demonstrating the strength of the central enterprises in supporting the construction of infrastructure in the border areas.

2025-11-14 10:08:17

Several subsidiaries of CCCC won the bid for six projects, covering infrastructure and electromechanical fields, demonstrating the comprehensive strength and market competitiveness of the Group.

2025-11-12 16:33:22

Several China Railway Engineering Bureaus have won the bid for major projects, demonstrating their strong competitiveness and leading position in the field of infrastructure construction.

2025-11-12 16:33:08

Several hydropower engineering bureaus and Northwest Power Construction Institute have won the bid for over 5.9 billion yuan of major projects, demonstrating the strong strength and centralized advantages of the power construction system in the field of large-scale infrastructure construction.

2025-11-12 09:27:02

Chaozhou-Nanchang Expressway won the bid to promote regional interconnection and boost the economic development of Guangdong and Jiangxi!

2025-11-12 09:26:40

Several major projects have won the bid, with a total amount of 2.4 billion yuan, highlighting the competitiveness of enterprises and market vitality.

2025-11-12 09:26:21

Construction Scale: The total length of the line is 9.994 kilometers, all of which are new sections. There are 5 new medium bridges of 199 meters, 13 culverts and 3 grade road intersections. The whole line is constructed according to the first-class highway standard, with a design speed of 80 km/H and a roadbed width of 25.5 meters. The design vehicle load grade of bridges and culverts is highway-I.

2025-11-10 13:56:25

Construction scale: 710 Wp monocrystalline PV module 53239 blocks will be installed in this project, with a total PV module capacity of 37.7997 MWp. Configure 320 sets of 500kW/1000kwh energy storage: construct 120 charging guns of 600 kW, 2600 charging guns of 120 kw, 1200 charging guns of 80 kw and 820 charging guns of 7 kw; support the transformation of 9480 parking spaces and a set of charging management system.

2025-11-10 13:56:08

Construction Scale: The total construction area is 60930 square meters, including square meters of above-ground 40230 and square meters of underground 20700. The National Center for Inheritance and Innovation of Traditional Chinese Medicine has 10 floors above ground and 2 floors underground, with a building height of 46.65 meters and a building area of 59930 square meters, including 39600 square meters above ground and 20330 square meters underground. The fever clinic building has one floor above the ground, with a building height of 6.1 meters and a building area of 630 square meters. The sewage treatment station has one floor underground, with a building area of 370 square meters.

2025-11-10 13:55:45

The Baoying Section of Yanbao Line Waterway Regulation Project starts from the junction of the upstream of Baoying Lock and the Beijing-Hangzhou Canal and ends at the junction of Yangzhou City and Yancheng City. It is 37.609 kilometers long according to the third-class waterway standard. The designed ship tonnage is 1000 tons. It is planned to rebuild (build) 14 bridges (Old Huaijiang Baoshe River Bridge, Weimin Road Pedestrian Bridge, Wangzhi Port Center Bridge, Junshi Bridge, Bianjia Bridge, Zhangshi Town West Bridge, Baoxing Bridge, Tangwan Bridge, Wangjia Bridge Pedestrian Bridge, Wangjia Bridge, Qijia Bridge, Zhaojia Bridge Pedestrian Bridge, Gaoxia Bridge and Liaoyu Bridge). The basic dimensions of the channel are as follows: the designed bottom width of the channel is not less than 45m, and the minimum navigable water

2025-11-07 13:33:58

Name of bid winner: consortium of China Railway Tunnel Engineering Group Co., Ltd. and China Railway No.4 Engineering Group Co., Ltd.; bid amount: 3166254953.04 RMB

2025-11-07 13:33:10

The four bureaus of China Construction have won the bid for major projects with a total amount of more than 4 billion yuan, demonstrating their strong competitiveness and leading position in the construction market.

2025-10-30 14:43:48

Many subordinate units of central enterprises have won the bid for major projects, reflecting the leading position and strong competitiveness of state-owned enterprises in the field of infrastructure construction.

2025-10-30 14:43:21

China Railway Construction Port and Navigation Bureau and China Railway Eryuan won two major projects respectively, demonstrating their competitiveness and strength in the field of infrastructure.

2025-10-30 14:43:11

"At the beginning of this year, Conch Cement increased the layout of Henan market and set up a special marketing company," a local cement enterprise in Henan said in a recent exchange with China Cement Network.