Alashankou International Trade Logistics Industrial Park EPC Project General
Contracting Construction Site: southwest side of Sinotrans Alashankou Company, southeast side of Alashankou Port International Road Transport Administration, south of Jinghe Street and north of Xiaerxili Street.
Construction Scale: The land area and construction area of the project are 295611 square meters (about 443.86 mu), the total construction area is about 288221 square meters, and the largest single construction area is about 45000 square meters. The planning and construction mainly include the main buildings such as factory buildings, cold storage, comprehensive R & D center, warehousing, digital marketing center, as well as canteens, staff dormitories, underground garages, photovoltaic panels and other supporting facilities. Control price for
EPC project: the maximum bidding price is 0.07 million yuan 132169, of which: the maximum price of engineering design is 24 million yuan, the maximum price of construction and installation cost (including equipment purchase cost) is 0.07 million yuan 129769, and the provisional amount is 40 million yuan (of which the provisional amount is non-competitive cost). The bid price of the bidder shall not be higher than highest bid price, and the bid price of each item shall not exceed the maximum price of the corresponding item, otherwise the bid shall be treated as invalid.
Bid winning information:
First candidate for bid winner: CCCC Third Highway Engineering Co., Ltd.
Bid offer: 1284517799.30 yuan
Second candidate for bid winner: CCCC Second Harbor Engineering Co., Ltd.
Bid offer 1285166284.20: CNY
The third successful candidate: Hubei Jianke International Engineering Co., Ltd
. Bid price: CNY
2.50 128985050
浙公网安备33010802003254号