On November 3, the People's Government of Xiangshui County, Yancheng, Jiangsu Province, issued a public announcement on the acceptance of the EIA document of "Xiangshuixia Zhongxin Energy Co., Ltd. 120 MW Centralized Photovoltaic Power Generation Project". The project
is located in the mud dumping area of the local industrial economic zone, with a total investment of 546.5 million yuan, an AC side capacity of 120 MW and a DC side installed capacity of 160.0165 MWp. It is planned to install 244,300 655 Wp N-type single crystal double glass modules with a construction period of 6 months.
浙公网安备33010802003254号