Guoneng Anhui 500MW Photovoltaic Project EPC Bidding!

2026-03-16 17:17:42

On March 14, Guodian Power Anhui Guodian Waneng Wind Power Co., Ltd. Guangde Qiucun 100MW, Tianqiao 100MW, Xiasi 150MW and Dongting 150MW Photovoltaic Project EPC General Contracting Public Bidding Project Tender Announcement was issued, and the tenderer was Anhui Guodian Waneng Wind Power Co., Ltd.

On

14 March, GD Power Anhui Guodian Wanneng Wind Power Co., Ltd. Guangde Qiucun 100MW, Tianqiao 100MW, Xiasi 150MW and Dongting 150MW " This tender is for Anhui Guangde Qiucun 100MW, Tianqiao 100MW, EPC general contracting project of Xiasi 150MW and Dongting 150MW photovoltaic projects, including but not limited to the following:

photovoltaic area, transmission line project and 220kV booster station: engineering survey and design, procurement and supply of equipment and materials, and engineering construction according to design drawings. Site coordination (all relevant coordination in the photovoltaic field area, land coordination of the booster station, etc.), project formalities, etc. The specific work contents include but are not limited to: Grid connection tender announcement shows that the 150MW photovoltaic project of Dongting in Guangde City is located in Qiucun Town and Xinhang Town, Guangde City, Xuancheng City, Anhui Province." The DC side capacity is 195 MW p , the AC side capacity is 150 MW , and the photovoltaic field covers an area of about 5550 mu. Qiucun 100MW Photovoltaic Project in Guangde City is located in Qiucun Town, with DC side capacity of 130MWp and AC side capacity of 100MW . The photovoltaic field covers an area of about 3431 mu. Guangde Tianqiao 100MW Photovoltaic Project is located in Baidian Town, Guangde City, with DC side capacity of 130MWp and AC side capacity of 100MW . The photovoltaic field covers an area of about 3870 mu. Guangde Xiasi 150MW Photovoltaic Project is located in Qiucun Town, with DC side capacity of 195MWp and AC side capacity of 150MW . The photovoltaic field covers an area of about 4942 mu.

The above four projects are all "tea-light complementary" projects, with a capacity ratio of 1.

It is worth noting that "the bidder shall obtain the construction permit for all projects within 30 working days after the signing of the contract. And complete the lease formalities for the temporary land required for the booster station of the project; within 30 calendar days after the contract is signed, complete the signing and delivery of all land lease contracts required for the full-capacity construction of the project, and ensure that the land use formalities are legal and compliant. If it is not completed within the promised time limit, it will be regarded as a breach of contract.In addition to the corresponding qualifications, the

tender requires the first bidder to perform from January 2021 to the deadline for bidding (based on the time of signing the contract) . The bidder must have at least domestic https://www.databm.

of 100MW and above . Consortium bidding is accepted for this project . There shall be no more than 2 members of the consortium. In case of consortium bidding, a valid consortium agreement must be provided. One member of the consortium must undertake the design work and the other member of the consortium must undertake the construction work.

The bid closing time/bid opening time is 10:00:00 on April 7, 2026 (Beijing time).

All can be viewed after purchase
Correlation

On March 14, Guodian Power Anhui Guodian Waneng Wind Power Co., Ltd. Guangde Qiucun 100MW, Tianqiao 100MW, Xiasi 150MW and Dongting 150MW Photovoltaic Project EPC General Contracting Public Bidding Project Tender Announcement was issued, and the tenderer was Anhui Guodian Waneng Wind Power Co., Ltd.

2026-03-16 17:17:42

On March 12, the tender announcement for EPC general contracting of China Power Investment yuanqu 300 MW Phase II Photovoltaic Composite Project was issued, and the tenderer was yuanqu Changyao New Energy Co., Ltd.

2026-03-16 09:09:56

On March 12, Laos Vientiane Kaokuishan 800MWp Photovoltaic Power Station Construction Project Tender was postponed again.

2026-03-16 09:09:35

On March 10, Kubuqi Desert Base Ordos New Energy 1.7 million kilowatts Photovoltaic Project (Phase I Inner Mongolia Jingneng Zhunqi New Energy Co., Ltd. 600000 kilowatts) photovoltaic area EPC general contracting successful candidates were announced.

2026-03-11 11:56:34

On February 28, Hubei Energy Group issued a tender announcement for EPC general contracting of Nanzhang Qinghe 80 MW fishing-photovoltaic complementary power station project and 34 MW/68 MWh energy storage power station project, and the tenderer was Hanjiang Energy Development Co., Ltd. of Hubei Energy Group.

2026-03-03 18:00:22